A06_-_CG_WS_-_DRAWINGS.pdf

PDF 5 MB Posted

Attached to
SEKI - Rehab Cedar Grove Water System Federal contract opportunity
Solicitation number
P17PS00749
Issued by
Department of the Interior National Park Service

About this file

Drawings Sec J 003

View the file

Other files for this federal contract opportunity

Other files attached to SEKI - Rehab Cedar Grove Water System, newest first.
File Type Posted
P17PS00749_General_References.docx DOCX document
P17PS00749_Key_Personnel_Qualifications.docx DOCX document
Sol_P17PS00749.pdf PDF
A06_-_Specifications.pdf PDF
SF_24_Bid_Bond.pdf PDF
Past_Performance_Quesionnaire.docx DOCX document
P17PS00749_Subcontractor_Reference.docx DOCX document
SEKI_203630_-_Directions_to_Site_Visit.pdf PDF
B03_-_DOL_Wage.pdf PDF
Bid_Pricing_Schedule.xlsx XLSX spreadsheet
B01_-_PRESOLICITATION_NOTICE.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2600A

V

81483

R

EXP: 09/30/17

J

ILI

C

O

S

E

P

H

L . C

H

A

M

A

N

E G

I S

T

E

R

E

D

P

R

O

F

ESS

I O

N

A

L

E

N

G

I

N

E

E R

S

T

A

T

E

O

F

CA

L

I F

O

R

N

I

A

P

1. INSPECTION OF REINFORCING STEEL, INCLUDING

PRESTRESSING TENDONS, AND PLACEMENT.

2. INSPECTION OF REINFORCING STEEL WELDING IN

ACCORDANCE WITH TABLE 1705.2.2, ITEM 2B.

3. INSPECTION OF ANCHORS CAST IN CONCRETE

WHERE ALLOWABLE LOADS HAVE BEEN INCREASED

OR WHERE STRENGTH DESIGN IS USED.

4. INSPECTION OF ANCHORS POST-INSTALLED IN

HARDENED CONCRETE MEMBERS.

5. VERIFYING USE OF REQUIRED DESIGN MIX.

6. AT THE TIME FRESH CONCRETE IS SAMPLED TO

FABRICATE SPECIMENS FOR STRENGTH TESTS,

PERFORM SLUMP AND AIR CONTENT TESTS, AND

DETERMINE THE TEMPERATURE OF THE CONCRETE.

7. INSPECTION OF CONCRETE AND SHOTCRETE

PLACEMENT FOR PROPER APPLICATION

TECHNIQUES.

8. INSPECTION OF MAINTENANCE OF SPECIFIED

CURING TEMPERATURE AND TECHNIQUES.

10. ERECTION OF PRECAST CONCRETE MEMBERS.

11. VERIFICATION OF IN-SITU CONCRETE STRENGTH,

PRIOR TO STRESSING OF TENDONS IN

POST-TENSIONED CONCRETE AND PRIOR TO

REMOVAL OF SHORES AND FORMS FROM BEAMS

AND STRUCTURAL SLABS.

12. INSPECT FORMWORK FOR SHAPE, LOCATION AND

DIMENSIONS OF THE CONCRETE MEMBER BEING

FORMED.

VERIFICATION AND INSPECTION

REQUIRED

YES NO

PERIODICCONT

9. INSPECTION OF PRESTRESSED CONCRETE:

a. APPLICATION OF PRESTRESSING FORCES.

b. GROUTING OF BONDED PRESTRESSING

TENDONS IN THE SEISMIC FORCE-RESISTING

SYSTEM.

TABLE 1705.3

REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION

1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS

ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING

CAPACITY.

2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER

DEPTH AND HAVE REACHED PROPER MATERIAL.

3. PERFORM CLASSIFICATION AND TESTING OF

COMPACTED FILL MATERIALS.

4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND

LIFT THICKNESSES DURING PLACEMENT AND

COMPACTION OF COMPACTED FILL.

5. PRIOR TO PLACEMENT OF COMPACTED FILL,

OBSERVE SUBGRADE AND VERIFY THAT SITE HAS

BEEN PREPARED PROPERLY.

REQUIRED

YES NO

PERIODICCONTVERIFICATION AND INSPECTION

TABLE 1705.6

REQUIRED VERIFICATION AND INSPECTION OF SOILS

V

81483

R

EXP: 09/30/17

J

ILI

C

O

S

E

P

H

L . C

H

A

M

A

N

E G

I S

T

E

R

E

D

P

R

O

F

ESS

I O

N

A

L

E

N

G

I

N

E

E R

S

T

A

T

E

O

F

CA

L

I F

O

R

N

I

V

81483R

EXP: 09/30/17

J

I

LI

C

O

S

E

P

H

L. C

H

A

M

A

N

E G

I S

T

E

R

E

D

P

R

O

F

ESS

I O

N

A

L

E

N

G

I

N

E

E R

S

T

A

T

E

O

F

CA

L

I F

O

R

N

I

100% FINAL Construction Drawings_1-9-17
100% FINAL Construction Drawings_12-22-16
SEKI CG WS_100% FINAL CDS_SPF combined_12-22-16
SEKICOV-Layout1
SEKI CG WS_100% FINAL CDS_SPF combined_12-22-16
G2 GENERAL NOTES-G2
G3 PROC FLOW DIAG-G3
SEKI CG WS_100% FINAL CDS_SPF combined_12-22-16
G4 HYDRAULIC PROF-G4
C1 EX CONDITIONS AND DEMO-C1
C2 SITE PLAN-C2
C3 GRADING PLAN-C3
C4 SLOW SAND FLTR-C4
C5 SSF ELEVATION-C5
C6 DETAILS-C6
P-1-DEMOPLAN-P1
P2 TREATMENT BLDG-P2
100% FINAL Construction Drawings_1-9-17
100% FINAL Construction Drawings_12-22-16
SEKI CG WS_100% FINAL CDS_SPF combined_12-22-16
SEKI CG WS_100% FINAL CDS_SPF combined_12-22-16
P3-DETAILS-P3
Electrical 03.03.2017-signed
100% FINAL Construction Drawings_1-9-17
100% FINAL Construction Drawings_12-22-16
100% FINAL Construction Drawings_12-22-16
Structural - 100% Final-signed

S3-signed

File details come from the government source that posted it. Updated .