A3_Price_Schedule_RM.pdf

PDF 97 KB Posted

Attached to
Accessible Facilities at Mori Point - Golden Gate NRA Federal contract opportunity
Solicitation number
P15PS01964
Issued by
Department of the Interior National Park Service

About this file

Contract Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Accessible Facilities at Mori Point - Golden Gate NRA, newest first.
File Type Posted
A6_SUBCONTRACTOR_REF_FORM.pdf PDF
A7_Key_Personnel_Qualifications.pdf PDF
A4_General_References_Form.pdf PDF
A2_Drawings_with_Map.pdf PDF
A9_DB_Wages_CA150029_07172015_CA29.pdf PDF
P15PS01964_Standard_Form_1442.pdf PDF
Clauses_ _Provisions.pdf PDF
A8_Relevant_Prior_Experience_.pdf PDF
A5_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
A1_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLLA Accessible Facilities at Mori Pt., GGNRA 100% Final Construction Documents

May 29, 2015 00 41 00 - 1 Bid Form

SECTION 00 41 00

BID FORM

1.1 SUBMIT COPY OF BID FORM TO:

Gary Kramer

1.2 PROJECT

A. In compliance with proposed Contract Documents for construction of:

ACCESSIBLE FACILITIES AT MORI POINT

GOLDEN GATE NATIONAL RECREATION AREA

B. Including Addenda Numbers ____ ____ ____ ____ ____ ____ ____ ____

C. The undersigned has become thoroughly familiar with the terms and conditions of proposed Contract Documents and with local codes and conditions affecting performance and costs of Work at place where

Work is to be completed.

D. The undersigned has fully inspected the site in all particulars.

E. The undersigned hereby proposes and agrees to fully perform Work as follows.

1. The undersigned agrees to perform Work within time agreed upon.

2. The undersigned agrees to perform Work in strict accordance with proposed Contract Documents, including furnishing any and all labor and materials.

3. The undersigned agrees to do all work required to construct and complete said Work in accordance with Contract Documents.

1.3 BID SCHEDULE

A. Base Bid: In case of error in summation, the total of the corrected bid amount shall govern.

B. Submittals and Approvals (Division 01):

_____________________________________Dollars ($______________________)

C. Soils Testing for Hazardous Materials:

D. Mobilization (Division 01):

_____________________________________Dollars ($______________________)

E. Demolition (Section 02 41 20):

F. Layout, Clear and Grub

May 29, 2015 00 41 00 - 2 Bid Form

G. Earthwork, Cut&Fill, Vault excavation, Paths, Parking (Section 31 00

00):

H. Survey, Compaction Testing

I. Base Rock (Section 32 15 50, 32 12 00, 32 16 00)

J. Concrete Paving, Parking (Section 32 16 00)

K. Compacted Aggregate Paving (Section 32 15 50)

L. Bollards, Trash Receptacle (Section 12 93 00)

M. Vault Toilet (Section 12 93 30)

N. Pavement Markings(Section 09 90 90)

O. Signage (Section 10 14 00):

P. Tree Pruning and removals(Section 01 51 00)

Q. Parking Bumpers (Section 32 17 00):

_____________________________________Dollars ($______________________)

R. Demobilization (Division 01):

_____________________________________Dollars ($______________________)

S. All labor, materials, services, and equipment necessary for completion of the Work not otherwise listed, except for items described as "Alternates".

_____________________________________Dollars ($______________________)

T. Bid Summary: Total Bid

May 29, 2015 00 41 00 - 3 Bid Form

1.4 Bid Options

A. Refer to Section 01 23 00 - Alternates for a complete description of work to be included in each alternate.

1. Bid Option Number 1: Remove Easternmost tree and install two standard parking spaces and associated striping and bumpers.

_____________________________________Dollars ($______________________)

1.5 AWARD OF CONTRACT

A. It is understood that Owner reserves right to reject this bid but that it shall remain open and not be withdrawn for a period of sixty calendar days from date prescribed for its opening.

B. Undersigned agrees to execute and deliver Contract to Owner in accordance with this bid if written acceptance is mailed or delivered before bid is withdrawn by written notification to Owner.

1.6 TIME OF COMPLETION

A. The undersigned agrees to commence work under this Contract on or before a date to be specified in a written notice from Owner and to complete project within the following limits:

1. _____ consecutive calendar days after specified date (Contractor to fill in).

1.7 IDENTIFICATION

A. Notice of acceptance, or request for additional information, may be addressed to the undersigned at address set forth below.

B. The names of all persons interested in the foregoing bid as principals are:

1. Important Notice: If a corporation, give legal name of corporation, state where incorporated, and names of president and secretary; if a partnership, give name of firm and names of all individual co-partners composing the firm; if an individual, give first and last names in full.

C. License: Contractor is licensed in accordance with an act for registration of contractors with license number:

D. Business Address:

May 29, 2015 00 41 00 - 4 Bid Form

E. Telephone Number: ______________________________________________

F. Date of Bid: ____________________________________________________

G. Signature of person(s) with legal authority to sign contracts:

1.8 INSURANCE ATTACHMENT

A. Attach copy of Contractor insurance coverage to be provided for

Project.