Optional Bid SOW Hydrants
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Construct_Boat_Storage_Building_at_Jones_Point.pdf | ||
| 177176-177191-Projects-SOW.pdf | ||
| JELA_Lighting_Projects_Clauses_.docx | DOCX document | |
| Sol_P15PS01272.pdf | ||
| Option_Bid_Item-3-Install_Showers_at_Ed_Center.pdf | ||
| The_National_Park_Service_JELA_Lighting.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Interior National Park Service
Jean Lafitte National Historical Park & Preserve Wetlands Acadian Cultural Center
Acadian Cultural Center
REPLACE DEFICIENT PARKING LOT LIGHTING
(OPTIONAL BID ITEM #1)
REBUILD ZURN WATER HYDRANTS - WACC
1 .0 GENERAL
The Wetlands Acadian Cultural Center (WACC), part of the Jean Lafitte National Historical Park and Preserve, has made it its mission to interpret the cultural and natural history of the Mississippi River delta region and make that history accessible to the Thibodaux community. The WACC facilities are located at: 314 St. Mary Street, Thibodaux, LA. 70301.
2. 0 SCOPE
Located on the exterior of the facility building and on the grounds of the facility are antiquated Zurn and Wade model water hydrants that need to be rebuilt in order to make them usable again. It is the intent of this contract to rebuild with new components nine(9) each non-functioning Zurn / Wade model water hydrants located on the exterior of the facility building and on the grounds of the facility.
3.0 REQUIREMENTS
1. The Contractor shall furnish all supervision, labor, materials and equipment necessary to accomplish the work of this contract.
2. Contractor is to rebuild:
1) 1 each post hydrant - Zurn
2) 3 each wall hydrants - Zurn
3) 1 each floor hydrant - Zurn
4) 4 each floor hydrant – Wade Model
3. Contractor will verify that all hydrants are in good working order after repairs are completed.
4. All materials supplied and work performed must meet or exceed industry standards in methods, workmanship and materials used.
5. All plumbing work must be performed by a licensed plumber.
6. Contractor will properly dispose of old replaced materials upon completion.
File details come from the government source that posted it. Updated .