-Option_Bid_Item-1-Rebuild_Water_Hydrants-WACC.pdf

PDF 8 KB Posted

Attached to
Replace Deficient Lighting Jean Lafitte NHP&P Federal contract opportunity
Solicitation number
P15PS01272
Issued by
Department of the Interior National Park Service

About this file

Optional Bid SOW Hydrants

View the file

Other files for this federal contract opportunity

Other files attached to Replace Deficient Lighting Jean Lafitte NHP&P, newest first.
File Type Posted
Construct_Boat_Storage_Building_at_Jones_Point.pdf PDF
177176-177191-Projects-SOW.pdf PDF
JELA_Lighting_Projects_Clauses_.docx DOCX document
Sol_P15PS01272.pdf PDF
Option_Bid_Item-3-Install_Showers_at_Ed_Center.pdf PDF
The_National_Park_Service_JELA_Lighting.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Interior National Park Service

Jean Lafitte National Historical Park & Preserve Wetlands Acadian Cultural Center

Acadian Cultural Center

REPLACE DEFICIENT PARKING LOT LIGHTING

(OPTIONAL BID ITEM #1)

REBUILD ZURN WATER HYDRANTS - WACC

1 .0 GENERAL

The Wetlands Acadian Cultural Center (WACC), part of the Jean Lafitte National Historical Park and Preserve, has made it its mission to interpret the cultural and natural history of the Mississippi River delta region and make that history accessible to the Thibodaux community. The WACC facilities are located at: 314 St. Mary Street, Thibodaux, LA. 70301.

2. 0 SCOPE

Located on the exterior of the facility building and on the grounds of the facility are antiquated Zurn and Wade model water hydrants that need to be rebuilt in order to make them usable again. It is the intent of this contract to rebuild with new components nine(9) each non-functioning Zurn / Wade model water hydrants located on the exterior of the facility building and on the grounds of the facility.

3.0 REQUIREMENTS

1. The Contractor shall furnish all supervision, labor, materials and equipment necessary to accomplish the work of this contract.

2. Contractor is to rebuild:

1) 1 each post hydrant - Zurn

2) 3 each wall hydrants - Zurn

3) 1 each floor hydrant - Zurn

4) 4 each floor hydrant – Wade Model

3. Contractor will verify that all hydrants are in good working order after repairs are completed.

4. All materials supplied and work performed must meet or exceed industry standards in methods, workmanship and materials used.

5. All plumbing work must be performed by a licensed plumber.

6. Contractor will properly dispose of old replaced materials upon completion.