Construct_Boat_Storage_Building_at_Jones_Point.pdf

PDF 151 KB Posted

Attached to
Replace Deficient Lighting Jean Lafitte NHP&P Federal contract opportunity
Solicitation number
P15PS01272
Issued by
Department of the Interior National Park Service

About this file

Optional Bid SOW BOat Shelter

View the file

Other files for this federal contract opportunity

Other files attached to Replace Deficient Lighting Jean Lafitte NHP&P, newest first.
File Type Posted
177176-177191-Projects-SOW.pdf PDF
-Option_Bid_Item-1-Rebuild_Water_Hydrants-WACC.pdf PDF
JELA_Lighting_Projects_Clauses_.docx DOCX document
Sol_P15PS01272.pdf PDF
Option_Bid_Item-3-Install_Showers_at_Ed_Center.pdf PDF
The_National_Park_Service_JELA_Lighting.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Interior National Park Service

Jean Lafitte National Historical Park & Preserve Wetlands Acadian Cultural Center

Acadian Cultural Center

REPLACE DEFICIENT PARKING LOT LIGHTING

(OPTIONAL BID ITEM #2)

CONSTRUCT METAL BOAT STORAGE BUILDING AT JONES POINT

1 .0 GENERAL

The Barataria Preserve, part of the Jean Lafitte National Historical Park and Preserve, protects significant examples of the rich natural and cultural resources of Louisiana's Mississippi River Delta region. The preserve has trails and canoe tours through bottomland hardwood forests, swamps, and marsh. An education center provides curriculum-based programming for school groups and the visitor center has film and static exhibits. The facilities are located at: 6588 Barataria Boulevard, Marrero, LA. 70072.

Jones Point is also part of the Barataria Preserve.

2. 0 SCOPE

The park has the need to place a metal boat storage building on its property at the Jones Point location.

The pre-engineered steel metal boat storage building will be an open-bay type construction with a concrete slab floor, metal roof and truss, metal end-wall panels, with a wind velocity rating of at least 150 mph.

3.0 REQUIREMENTS

1. The Contractor shall furnish all supervision, labor, materials and equipment necessary to accomplish the work of this contract.

2. The contractor is responsible for field-verification of any drawings that are provided by the government that indicate quantitative or dimensional data.

3. All work must meet or exceed industry standards in methods, workmanship and materials used.

4. The contractor will reference state and local building codes to ensure compliance.

5. All electrical work shall be performed by a licensed electrician and comply with national electric code.

6. The contractor must prepare ground placement area to remove any vegetation, debris, obstacles and to ensure proper drainage and compaction of building site.

7. Contractor is to construct a steel metal boat storage building comprised of:

1) 31’ wide x 76’ long overall building dimensions.

2) Minimum vertical clearance in each bay area of 13’.

3) Minimum roof and wall panel thickness of 26 gauge.

4) Equipped to properly channel and disburse rain run-off.

5) Utilize Fixed Based Structural Support Columns.

6) Minimum wind velocity rating of 150 mph.

7) Reinforced concrete slab floor of at least 6” in thickness.

8) Building metal structural supports will be coated with a gray metal primer.

9) Metal roof and end panels will be coated with forest brown color paint.

10) A minimum of 6 each 120 volt, 20 amp GFCI electrical convenience outlets will be evenly distributed throughout the building as to provide electrical access.

11) The interior of the building shall be equipped and illuminated with LED light fixtures that are properly rated for the environmental conditions of the open-bay building structure. The quantity and distribution of the fixtures shall be installed so that OSHA illumination standards met.

12) Lighting circuit switches shall be placed within the building in such a manner to be able to control approximately one third of the lights at a time.

13) The exterior top corners of the building and over the center bay area shall be equipped with a double LED type flood light fixtures for physical security purposes.

14) A 60 amp electrical service panel shall be placed within the building connecting all new electrical circuits to appropriately sized breakers.

8. Electrical service to the building shall be ran in conduit underground from the main electrical power feed panel on the compound to the building location.

4.0 REFERENCE MAPS AND BUILDING SITE LOCATION

The following page contains references to help communicate conceptually the tasks that are to be executed by the contractor. They are provided for reference only and not intended to be to scale, highly accurate or absolute.

Jones Point General Location Reference

Boat Storage Building General Location Reference