NPS_Jewel_Cave_Amendment__2_04032015.docx

DOCX document 102 KB Posted

Attached to
Jewel Cave NM - Book Store Addition
Solicitation number
P15PS00486
Issued by

About this file

NPS Jewel Cave Amendment 2 04032015

View the file

Other files

File Type Posted
Sol_P15PS00486_Amd_000002.pdf PDF
AX-001 _Amendment_2.pdf PDF
NPS_Jewel_Cave_Amendment__1_040115.docx DOCX document
Sol_P15PS00486_Amd_000001.pdf PDF
Bid_Schedule.docx DOCX document
P15PS00486_0001_Amendment.docx DOCX document
Site_Visit_Sign_In_Sheet.pdf PDF
Existing_Carpet_-_Spec_Sheet.pdf PDF
Sol_P15PS00486.pdf PDF
Custer_County_Wage_Determinations.docx DOCX document
Jewel_Cave_Visitor_Center_Drawing_Set.pdf PDF
NPS_Jewel_Cave_Final_Specifications_SFS_121814.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT #2

TO DOCUMENTS TITLED: Jewel Cave Expand Exhibit Space and Bookstore 11149 US Highway 16 B-12 Custer, South Dakota 57730

DATED: 04/03/2015

The Contract Documents for the above referenced project and the work covered thereby are modified as described herein.

DRAWING REVISIONS:

1. A321 – Wall Sections

a. Insert the typical connection detail for mansard framing to LVL roof structure as shown on attached Drawing AX-001.

SPECIFICATION REVISIONS:

1. Section 015000 Paragraph 2.1 B. Amendment #1 was incorrect, orange construction fencing is NOT acceptable in the primary construction area. Please use portable chain-link as originally specified.

2. Section 014000 Paragraph 1.6 A through F are DELETED.

Attachments:

AX-001 – LVL CONNECTION

Q&A:

Ref: 014000, part 1.6 A; 033000, part 3.9A; 051200 Part 2.9A. Section 014000 states the contractor is responsible for engaging a testing agency, which contradicts the quality control requirements in sections 033000 & 051200? Please clarify the testing responsibilities for the owner & contractor. Section 014000 paragraph 1.6 A-F are removed. The cost for concrete testing is the contractor’s cost. That is the only testing that the NPS is requiring.