P09-QASP- Elevator.docx
DOCX document 32 KB Posted
- Attached to
- J099--Syracuse VAMC Elevator Maintenance Federal contract opportunity
- Solicitation number
- 36C24220Q0724
About this file
This document includes a Quality Assurance Surveillance Plan (QASP) and related federal contract opportunity for elevator maintenance services at the Syracuse VA Medical Center. The QASP outlines performance standards and monitoring methods for tasks including routine maintenance, cleaning, adjustments, record keeping, inspections, emergency response times and safety compliance. The federal contract opportunity is a request for quote to provide annual preventative maintenance for elevators at the Syracuse VAMC facility from July 2020 to June 2025 with pricing for a base year and four option years. Quotes are due by July 13, 2020 with award based on best value. The scope requires compliance with all standards and specifications in the attached Performance Work Statement including maintaining emergency on-site response within two hours.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P09-QASP- Elevator Syracuse.docx | DOCX document | |
| 36C24220Q0724 0001_1.docx | DOCX document | |
| Price Schedule.docx | DOCX document | |
| P07 WD 1967-0484 Elevator Repairer.pdf | ||
| Performance Work Statement Elevator Service (FR).docx | DOCX document | |
| 36C24220Q0724.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For: Syracuse VAMC Elevator Service Maintenance Agreement
Contract Number: < Upon award, Government will enter contract number>
Contract Description: The contractor must be able to provide and maintain services for the Syracuse elevators, per the scope of work, for the period of July 1, 2020 to June 30, 2025, with 4 option years available.
Contractor’s name: <Enter your company name.> (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: <Upon award, Government will enter name.> Organization or Agency: Department of Veterans Affairs, - fill in
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: <Upon award, Government will enter name.>
c. Other Key Government Personnel - <Upon award, Government will enter name, if applicable. This may include Performance Monitors, Clinical Quality experts, etc. who act on behalf of the COTR to monitor performance.>
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager - <Enter name.>
b. Other Contractor Personnel - <Enter name(s) or delete these lines if not applicable> Title: <Enter title(s) or delete these lines if not applicable.>
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
5. INCENTIVE
The incentive for all tasks will be the exercising of option periods and past performance.
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Cleaning, Lubrication, and Adjustment Services |
| 1 |
| Routine care, lubrication, and repacking in accordance with manufacturers’ service manuals. |
| In accordance with manufacturer’s service manuals |
| 100% |
| Direct Observation and random inspection (auditing) |
| 2 |
| Hoist motor and generator brushes shall be checked for wear at least every two weeks. Accumulated carbon dust shall be removed from commutators, brush rigs and windings at the same time. |
| In accordance with sections B.4.2.1 and B.4.6 |
| 100% |
| Direct Observation and random inspection (auditing) |
| Cleaning Services |
| 3 |
| Guide rails, overhead sheaves and beams, counterweight frames, tops of cars, bottom of platforms and machine room floors shall be brushed clean at least every three months. All accumulated rubbish shall be removed from the pits at least once every three months. |
| In accordance with sections B.4.2.1 and B.4.6 |
| 95% |
| Inspection |
| 4 |
| A complete cleaning of the entire installation including all machine room equipment, hoist way, equipment, machine room floors, hoist way, supporting structures, etc., |
| In accordance with sections B.4.2.1 and B.4.6 |
| 95% |
| Inspection |
| Adjustment Services |
| 5 |
| All adjustment services in accordance with manufacturer’s recommendations and as necessary based upon inspection |
| In accordance with manufacturer’s service manuals |
| 100% |
| Direct Observation and random inspection (auditing) |
Furnish, install, repair parts
| 6 |
| Furnish, install, or repair OEM parts |
| In accordance with section B.4.2.3 |
| 100% |
| Inspection |
| Record Maintenance |
| 8 |
| Maintain a complete, orderly and chronological file, including drawings, complete parts lists and copies of all reports as required by these specifications. A record of all call backs and repairs shall be kept by the Contractor indicating any difficulty experienced and the corrective measures taken to eliminate these difficulties. |
| In accordance with section B.4.3 |
| 100% |
| Periodic sampling and inspection |
| 9 |
| Written report upon completion of service |
| In accordance with section B.4.3 |
| 100% |
| Analysis of contractor's progress reports. |
| Performance |
| 10 |
| Elevators performance and uptime. |
| In accordance with section B.4.2.6 |
| 95% |
| Direct Observation |
| 11 |
| Emergency Service |
| 2 hour response time |
| 95% |
| Direct Observation |
Inspections/ Safety
| 12 |
| Inspection of passenger and service elevators |
| In accordance with sections B.4.2.2 |
| 100% |
| Observation and random inspection (auditing) |
| 11 |
| Compliance to safety standard |
| Compliance; no stop work orders |
| 100% |
| Direct Observation |
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
c. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)
e. 100% INSPECTION. (Evaluates all outcomes.)
f. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)
g. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.
h. Progress or status meetings.
i. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
PASS – Met the standard FAIL – Did not meet the standard
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COTR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
<After award, both the contractor’s Program Manager and the COR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
SAMPLE QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
| Random Inspection | 100% Inspection | Periodic Sampling | Observation |
| Analysis of contractor’s reports |
LEVEL OF SURVEILLANCE (Check):
| Monthly | Quarterly | Semi-Annual | As needed/required | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (Check): | Meets Standards (PASS) |
| Does Not Meet Standards (FAIL) |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________