P-85407 BOA Fully Executed Industrial Mechanical Inc. Redacted.pdf
PDF 456 KB Posted
- Contract number
- 26-416CMS-BOPM4-P-85407
- Issued by
- Illinois
About this file
This document is a Basic Ordering Agreement (BOA) for the State of Illinois, specifically involving the CMS Department of Central Management Services located in Springfield, Illinois. The contract is with an unnamed vendor and is associated with the Illinois Department of Transportation (IDOT) in Effingham, Illinois. The contract reference number is 26-416CMS-BOPM4-R-85407, and it was initiated upon execution with an end date of 11/28/2025.
The BOA covers a total cost of $58,960.00 for equipment, materials, and labor to replace restroom sewer drainpipe at the IDOT Building D0700 located at 400 W. Wabash in Effingham. The scope of work includes demolition of existing flooring and patch parking lot, as well as installing new sewer lines, flooring, and parking lot lines. The procurement method is classified as a Small Purchase, using state fiscal year 2026 funding. The contract utilizes the Illinois Procurement Gateway Certifications and Disclosures system, specifically the IPG Certifications and Disclosures including the IPG Active Registered Vendor Disclosure.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .