Over Haul Description 3950-01-566-3921_RD.pdf
PDF 8 KB Posted
- Attached to
- WINCH, DRUM, POWER OPERATED
- Solicitation number
- 70Z08522Q49051B00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR Clauses.pdf | ||
| JOTFOC.pdf | ||
| Solicitation.pdf | ||
| R-583-0222 HU40 winches.doc | DOC document | |
| Appendix A.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME WINCH,DRUM,POWER OPOPERATED
STOCK NUMBER 3950-01-566-3921
PART NUMBER HU40
USED ON WLIC & WLR
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
***REFER TO SPEC R-583-0222 REV. E FOR THE PURCHASE AND REPAIR OF HU40, HU40-
9.5, AND HU-40REMAN WINCHES.*******
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X
A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
3950-01-566-3921
WINCH,DRUM,POWER OPOPERATED
HU40
PRESERVATION / PACKAGING:
A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
X B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
File details come from the government source that posted it. Updated .