or-14003_Control-Sheet.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
OR DOT 140(3), Mitigation Site for OR 140 Federal contract opportunity
Solicitation number
69056721B000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This document package includes survey control point data sheets and related federal contract opportunity details. The opportunity is for bid documents to support mitigation work for Oregon State Route 140, solicited by the Department of Transportation Federal Highway Administration under solicitation number 69056721B000002. The survey control point sheets provide location and coordinate data for 38 survey points to support project work in Klamath County, Oregon. Response and award dates, pricing terms, and other contract specifics are not included in this document package.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 140(3), Mitigation Site for OR 140, newest first.
File Type Posted
Bid Opening Summary_OR DOT 140(3).pdf PDF
QA_16_march_21.pdf PDF
QA_15_march_21.pdf PDF
QA_11_March_21.pdf PDF
QA_8_March_21.pdf PDF
QA_4_March_21.pdf PDF
GR10-17 OR-140 Prelim Geotech Charact Report.pdf PDF
or-14003 DITCH D HA-VA.pdf PDF
or-14003 DITCH E HA-VA.pdf PDF
Compiled OR 140 Mitigation digiESCPFinal.pdf PDF
or-14003 DITCH A HA-VA.pdf PDF
IFB_OR DOT 140(3).pdf PDF
GR27-18 Final Geotech Report OR DOT 140(1) Klamath County Boat Marina to Lakeshore Dr.pdf PDF
GM44-19 OR-140 MItigation Site Geotech Memo.pdf PDF
or-14003 DITCH B HA-VA.pdf PDF
or-14003 BERM HA-VA.pdf PDF
or-14003 DITCH C HA-VA.pdf PDF
Finalized or-14003_plans.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information

Information
1.This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear.
2.If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location.
Common Sheet Information
Insert the following values. They will appear on every sheet.
State:ORNote: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines.
Project:DOT 140(1)
NPS PMIS /

Drawing No:

Designed by:ODOT
Date:1/1904
Checked by:ODOT
Date:1/1904
First sheet #:D.102.0
Title block text:SURVEY CONTROL
Show Totals?TRUE
Data location:Page 1Worksheet found
Data begins in col:A
Min. rows/table53.0
Base sheet name:Sheet43rows w/dataOK - no spaces in data
Max. row/table4043data rowsWarnings:
38rows/table
PROJECT : OR140 Klamath Falls Marina Mitigation site

FIELD WORK BY ODOT

PROJECT UNITS : International foot

COORDINATE SYSTEM : Oregon, OCRS Bend-Klamath zone VERTICAL DATUM :Orthometric elevations based on the NAVD88 GEOIS12a

EPOCH DATE :2010.00000

Sheet Names
Input the names of the worksheets in the order you would like the sheets numbered.
Worksheet NameSheetHeader rowSheet NumberNotes
SheetD.10310OK
Sheet (2)D.114111OK
Sheet (3)UndefinedFALSE11
Sheet (4)UndefinedFALSE11
Sheet (5)UndefinedFALSE11
Sheet (6)UndefinedFALSE11
Sheet (7)UndefinedFALSE11
Sheet (8)UndefinedFALSE11
Sheet (9)UndefinedFALSE11
Sheet (10)UndefinedFALSE11
Sheet (11)UndefinedFALSE11
Sheet (12)UndefinedFALSE11
Sheet (13)UndefinedFALSE11
Sheet (14)UndefinedFALSE11
Sheet (15)UndefinedFALSE11
Sheet (16)UndefinedFALSE11
Sheet (17)UndefinedFALSE11
Sheet (18)UndefinedFALSE11
Sheet (19)UndefinedFALSE11
Sheet (20)UndefinedFALSE11
Total Sheets:20sheets missing

Revised: 15 June 2015

Sheet

Sheet Information
Sheet num:D.10Filename0
Sheet name:SheetC:\MyFiles\Projects_2020\Oregon\OR140\New folder\[OR140_mitigation_Control.xlsx]Sheet
Reference:Sheet 1 of 2Time
23-Jun-2020 8:52 AM
Begin Column:ABCDEFGHI

PROJECT : OR140 Klamath Falls Marina Mitigation site

FIELD WORK BY ODOT

PROJECT UNITS : International foot COORDINATE SYSTEM : Oregon, OCRS Bend-Klamath zone

STATE PLANE COORDINATESGEO COORDINATES
3.0POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
1000184937.534249871.4904213.12042° 15' 26.57583" N121° 47' 47.46132" W4138.68581.00000237FD 2-1/2" ALUMINUM CAP "T38S R9E S18,17,19,20 ODOT 2004"1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
1001187107.723245522.2844152.48242° 15' 47.98209" N121° 48' 45.30569" W4077.99521.00000542FD YPC "LS58985"
1002187084.061245577.7604152.06542° 15' 47.74880" N121° 48' 44.56784" W4077.57941.00000544FD RPC "ADKIN CONSULT ENG LLC"
1004187068.736245613.9974151.44442° 15' 47.59771" N121° 48' 44.08586" W4076.95821.00000547FD YPC "LS58985"
1005186979.709245797.2324155.24242° 15' 46.71975" N121° 48' 41.64865" W4080.75881.00000528FD YPC "LS58985"
1006186908.288245924.5544157.84842° 15' 46.01527" N121° 48' 39.95507" W4083.36641.00000515FD YPC "RHINE CROSS GROUP LLC"
1007186716.184246210.0794152.79242° 15' 44.11996" N121° 48' 36.15686" W4078.31321.00000538FD RR SPIKE
1008186582.839246376.9394152.07542° 15' 42.80415" N121° 48' 33.93703" W4077.59631.00000541FD RR SPIKE
1009186316.638246622.9024144.43642° 15' 40.17671" N121° 48' 30.66426" W4069.95841.00000576FD YPC "RHINE CROSS GROUP LLC"
1010186314.239246467.9934143.23942° 15' 40.15196" N121° 48' 32.72389" W4068.75791.00000583FD 5/8" REBAR
1011186313.100246390.5964144.31142° 15' 40.14018" N121° 48' 33.75294" W4069.82841.00000578FD 5/8" REBAR LEANING SOUTHERLY
1012186428.358246250.0944143.86742° 15' 41.27755" N121° 48' 35.62213" W4069.38311.00000581FD YPC "RHINE CROSS GROUP LLC"
1013186557.116246089.0334144.17442° 15' 42.54810" N121° 48' 37.76480" W4069.68941.0000058FD YPC "RHINE CROSS GROUP LLC"
1014186789.747245727.6734146.02542° 15' 44.84310" N121° 48' 42.57169" W4071.53681.00000572FD 5/8" REBAR
1015186790.422245513.2444145.56542° 15' 44.84822" N121° 48' 45.42279" W4071.07221.00000575FD YPC "RHINE CROSS GROUP LLC"
1016186804.058245477.2924145.48742° 15' 44.98264" N121° 48' 45.90095" W4070.9941.00000576FD RPC "ADKIN CONSULT ENG LLC"
1017187231.970245195.9144150.60142° 15' 49.20683" N121° 48' 49.64647" W4076.11041.00000552FD YPC "RHINE CROSS GROUP LLC"
1018187395.578244765.7704162.71642° 15' 50.81947" N121° 48' 55.36751" W4088.22031.00000496FD 5/8" REBAR
1019187412.540244578.1264156.90942° 15' 50.98556" N121° 48' 57.86270" W4082.40951.00000525FD RPC "ADKIN CONSULT ENG LLC"
1020187639.089243986.2084152.14142° 15' 53.21845" N121° 49' 05.73557" W4077.6381.0000055FD RPC "ADKIN CONSULT ENG LLC"
1021187642.423243978.1664152.06742° 15' 53.25132" N121° 49' 05.84253" W4077.56341.0000055FD YPC "RHINE CROSS GROUP LLC"
1022187642.961243476.6224156.94742° 15' 53.25260" N121° 49' 12.51140" W4082.43481.00000529FD YPC "RHINE CROSS GROUP LLC"
1023187342.380244063.7824153.56742° 15' 50.28863" N121° 49' 04.70094" W4079.05681.00000543FD YPC "RHINE CROSS GROUP LLC"
1024187342.284244044.6234154.83542° 15' 50.28754" N121° 49' 04.95569" W4080.32391.00000537FD YPC "RHINE CROSS GROUP LLC"
1025185506.518247610.9704158.23442° 15' 32.18209" N121° 48' 17.52006" W4083.76131.00000507FD YPC "RHINE CROSS GROUP LLC"
1026185429.232247547.6534156.02842° 15' 31.41838" N121° 48' 18.36122" W4081.55271.00000518FD YPC "RHINE CROSS GROUP LLC"
1027185264.561246657.8194146.07542° 15' 29.78616" N121° 48' 30.19042" W4071.57911.00000569FD YPC "RHINE CROSS GROUP LLC"
1028185257.610247876.5634167.64542° 15' 29.72543" N121° 48' 13.98679" W4093.17331.00000461FD 5/8" REBAR BENT NORTHERLY, TIED SPINHOLE
1029185191.138247801.5684164.64242° 15' 29.06846" N121° 48' 14.98331" W4090.16771.00000476FD YPC, DAMAGED AND LEANING WESTERLY
1030184964.427248079.9384172.19442° 15' 26.83109" N121° 48' 11.28043" W4097.72091.00000439FD YPC "RHINE CROSS GROUP LLC"
1031184917.692247991.4944164.41642° 15' 26.36897" N121° 48' 12.45592" W4089.94091.00000476FD RR SPIKE "LS 58985"
1032184935.794247877.7674164.28942° 15' 26.54704" N121° 48' 13.96809" W4089.81211.00000477FD RR SPIKE "LS 58985"
1033184649.624248221.2424182.94842° 15' 23.72281" N121° 48' 09.39919" W4108.47221.00000387FD YPC "RHINE CROSS GROUP LLC"
1034184015.559248323.0714183.58742° 15' 17.46112" N121° 48' 08.04021" W4109.10211.00000384FD YPC "RHINE CROSS GROUP LLC"
1035183669.962248439.0314190.32442° 15' 14.04853" N121° 48' 06.49578" W4115.83471.00000351FD YPC "RHINE CROSS GROUP LLC"
1036184935.821248094.5144165.84642° 15' 26.56049" N121° 48' 11.01237" W4091.3731.00000469FD YPC "RHINE CROSS GROUP LLC"
1037184935.999248150.7024166.18942° 15' 26.56382" N121° 48' 10.26536" W4091.71751.00000467FD YPC "RHINE CROSS GROUP LLC"
1038186317.766246700.3444153.74342° 15' 40.18837" N121° 48' 29.63460" W4079.26621.00000532FD RR SPIKE

Sheet (2)

Sheet Information
Sheet num:D.11Filename0
Sheet name:Sheet (2)C:\MyFiles\Projects_2020\Oregon\OR140\New folder\[OR140_mitigation_Control.xlsx]Sheet (2)
Reference:Sheet 2 of 2Time
23-Jun-2020 8:52 AM
Begin Column:ABCDEFGHI

PROJECT : OR140 Klamath Falls Marina Mitigation site

FIELD WORK BY ODOT

PROJECT UNITS : International foot COORDINATE SYSTEM : Oregon, OCRS Bend-Klamath zone

STATE PLANE COORDINATESGEO COORDINATES
41.0POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
7000187052.393245612.9314151.26742° 15' 47.43629" N121° 48' 44.09988" W4076.7841.00000548PREMARK1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
7001186544.270245412.1954147.53342° 15' 42.41638" N121° 48' 46.76393" W4073.0361.00000566PREMARK
7002185930.489245182.1514148.68342° 15' 36.35271" N121° 48' 49.81649" W4074.171.00000562PREMARK
7003186958.684245844.1734156.74842° 15' 46.51243" N121° 48' 41.02431" W4082.2671.0000052PREMARK
7004186740.003246169.3084153.20742° 15' 44.35493" N121° 48' 36.69917" W4078.7281.00000536PREMARK
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000

PROJECT : OR140 Klamath Falls Marina Mitigation site

FIELD WORK BY ODOT

PROJECT UNITS : International foot

COORDINATE SYSTEM : Oregon, OCRS Bend-Klamath zone

STATE PLANE COORDINATESGEO COORDINATES
POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTION
1000184937.534249871.4904213.12042° 15' 26.57583" N121° 47' 47.46132" W4138.6861.00000237FD 2-1/2" ALUMINUM CAP "T38S R9E S18,17,19,20 ODOT 2004"
1001187107.723245522.2844152.48242° 15' 47.98209" N121° 48' 45.30569" W4077.9951.00000542FD YPC "LS58985"
1002187084.061245577.7604152.06542° 15' 47.74880" N121° 48' 44.56784" W4077.5791.00000544FD RPC "ADKIN CONSULT ENG LLC"
1004187068.736245613.9974151.44442° 15' 47.59771" N121° 48' 44.08586" W4076.9581.00000547FD YPC "LS58985"
1005186979.709245797.2324155.24242° 15' 46.71975" N121° 48' 41.64865" W4080.7591.00000528FD YPC "LS58985"
1006186908.288245924.5544157.84842° 15' 46.01527" N121° 48' 39.95507" W4083.3661.00000515FD YPC "RHINE CROSS GROUP LLC"
1007186716.184246210.0794152.79242° 15' 44.11996" N121° 48' 36.15686" W4078.3131.00000538FD RR SPIKE
1008186582.839246376.9394152.07542° 15' 42.80415" N121° 48' 33.93703" W4077.5961.00000541FD RR SPIKE
1009186316.638246622.9024144.43642° 15' 40.17671" N121° 48' 30.66426" W4069.9581.00000576FD YPC "RHINE CROSS GROUP LLC"
1010186314.239246467.9934143.23942° 15' 40.15196" N121° 48' 32.72389" W4068.7581.00000583FD 5/8" REBAR
1011186313.100246390.5964144.31142° 15' 40.14018" N121° 48' 33.75294" W4069.8281.00000578FD 5/8" REBAR LEANING SOUTHERLY
1012186428.358246250.0944143.86742° 15' 41.27755" N121° 48' 35.62213" W4069.3831.00000581FD YPC "RHINE CROSS GROUP LLC"
1013186557.116246089.0334144.17442° 15' 42.54810" N121° 48' 37.76480" W4069.6891.00000580FD YPC "RHINE CROSS GROUP LLC"
1014186789.747245727.6734146.02542° 15' 44.84310" N121° 48' 42.57169" W4071.5371.00000572FD 5/8" REBAR
1015186790.422245513.2444145.56542° 15' 44.84822" N121° 48' 45.42279" W4071.0721.00000575FD YPC "RHINE CROSS GROUP LLC"
1016186804.058245477.2924145.48742° 15' 44.98264" N121° 48' 45.90095" W4070.9941.00000576FD RPC "ADKIN CONSULT ENG LLC"
1017187231.970245195.9144150.60142° 15' 49.20683" N121° 48' 49.64647" W4076.1101.00000552FD YPC "RHINE CROSS GROUP LLC"
1018187395.578244765.7704162.71642° 15' 50.81947" N121° 48' 55.36751" W4088.2201.00000496FD 5/8" REBAR
1019187412.540244578.1264156.90942° 15' 50.98556" N121° 48' 57.86270" W4082.4101.00000525FD RPC "ADKIN CONSULT ENG LLC"
1020187639.089243986.2084152.14142° 15' 53.21845" N121° 49' 05.73557" W4077.6381.00000550FD RPC "ADKIN CONSULT ENG LLC"
1021187642.4229243978.16644152.066842° 15' 53.25132" N121° 49' 05.84253" W4077.56341.00000550FD YPC "RHINE CROSS GROUP LLC"
1022187642.9608243476.62244156.947342° 15' 53.25260" N121° 49' 12.51140" W4082.43481.00000529FD YPC "RHINE CROSS GROUP LLC"
1023187342.3797244063.78244153.567142° 15' 50.28863" N121° 49' 04.70094" W4079.05681.00000543FD YPC "RHINE CROSS GROUP LLC"
1024187342.2841244044.62334154.834642° 15' 50.28754" N121° 49' 04.95569" W4080.32391.00000537FD YPC "RHINE CROSS GROUP LLC"
1025185506.5176247610.97044158.233742° 15' 32.18209" N121° 48' 17.52006" W4083.76131.00000507FD YPC "RHINE CROSS GROUP LLC"
1026185429.2322247547.65334156.027842° 15' 31.41838" N121° 48' 18.36122" W4081.55271.00000518FD YPC "RHINE CROSS GROUP LLC"
1027185264.561246657.81874146.075242° 15' 29.78616" N121° 48' 30.19042" W4071.57911.00000569FD YPC "RHINE CROSS GROUP LLC"
1028185257.6098247876.56334167.644742° 15' 29.72543" N121° 48' 13.98679" W4093.17331.00000461FD 5/8" REBAR BENT NORTHERLY, TIED SPINHOLE
1029185191.1379247801.56834164.641942° 15' 29.06846" N121° 48' 14.98331" W4090.16771.00000476FD YPC, DAMAGED AND LEANING WESTERLY
1030184964.427248079.93794172.193542° 15' 26.83109" N121° 48' 11.28043" W4097.72091.00000439FD YPC "RHINE CROSS GROUP LLC"
1031184917.692247991.49394164.416242° 15' 26.36897" N121° 48' 12.45592" W4089.94091.00000476FD RR SPIKE "LS 58985"
1032184935.7944247877.76664164.289442° 15' 26.54704" N121° 48' 13.96809" W4089.81211.00000477FD RR SPIKE "LS 58985"
1033184649.6238248221.24194182.947642° 15' 23.72281" N121° 48' 09.39919" W4108.47221.00000387FD YPC "RHINE CROSS GROUP LLC"
1034184015.5591248323.07124183.58742° 15' 17.46112" N121° 48' 08.04021" W4109.10211.00000384FD YPC "RHINE CROSS GROUP LLC"
1035183669.9615248439.03134190.323542° 15' 14.04853" N121° 48' 06.49578" W4115.83471.00000351FD YPC "RHINE CROSS GROUP LLC"
1036184935.8214248094.51444165.845742° 15' 26.56049" N121° 48' 11.01237" W4091.3731.00000469FD YPC "RHINE CROSS GROUP LLC"
1037184935.9994248150.70164166.18942° 15' 26.56382" N121° 48' 10.26536" W4091.71751.00000467FD YPC "RHINE CROSS GROUP LLC"
1038186317.7656246700.34434153.742642° 15' 40.18837" N121° 48' 29.63460" W4079.26621.00000532FD RR SPIKE
7000187052.393245612.9314151.26742° 15' 47.43629" N121° 48' 44.09988" W4076.7841.00000548PREMARK
7001186544.27245412.1954147.53342° 15' 42.41638" N121° 48' 46.76393" W4073.0361.00000566PREMARK
7002185930.489245182.1514148.68342° 15' 36.35271" N121° 48' 49.81649" W4074.171.00000562PREMARK
7003186958.684245844.1734156.74842° 15' 46.51243" N121° 48' 41.02431" W4082.2671.00000520PREMARK
7004186740.003246169.3084153.20742° 15' 44.35493" N121° 48' 36.69917" W4078.7281.00000536PREMARK

File details come from the government source that posted it. Updated .