QA_15_march_21.pdf

PDF 106 KB Posted

Attached to
OR DOT 140(3), Mitigation Site for OR 140 Federal contract opportunity
Solicitation number
69056721B000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains answers to technical questions regarding Federal Highway Administration Solicitation Number 69056721B000002 for the OR DOT 140(3) Mitigation Site for OR 140 project. Key details include that the project manager is Helen Oppenheimer, there is no prebid conference scheduled, the project has a total small business set-aside classification, and the Erosion Control Supervisor is not required to be on-site full-time. Testing requirements include maximum theoretical density and moisture content per specifications. The contractor is responsible for aquatic life salvage and rescue. Seeding is required for water and swell areas per the NPDES permit despite water level fluctuations, and all bare areas must be covered.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 140(3), Mitigation Site for OR 140, newest first.
File Type Posted
Bid Opening Summary_OR DOT 140(3).pdf PDF
QA_16_march_21.pdf PDF
QA_11_March_21.pdf PDF
QA_8_March_21.pdf PDF
QA_4_March_21.pdf PDF
GR10-17 OR-140 Prelim Geotech Charact Report.pdf PDF
or-14003 DITCH D HA-VA.pdf PDF
or-14003 DITCH E HA-VA.pdf PDF
Compiled OR 140 Mitigation digiESCPFinal.pdf PDF
or-14003 DITCH A HA-VA.pdf PDF
IFB_OR DOT 140(3).pdf PDF
GR27-18 Final Geotech Report OR DOT 140(1) Klamath County Boat Marina to Lakeshore Dr.pdf PDF
GM44-19 OR-140 MItigation Site Geotech Memo.pdf PDF
or-14003 DITCH B HA-VA.pdf PDF
or-14003 BERM HA-VA.pdf PDF
or-14003 DITCH C HA-VA.pdf PDF
or-14003_Control-Sheet.xlsx XLSX spreadsheet
Finalized or-14003_plans.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. OR DOT 140(3) Project: Mitigation Site for OR 140

# General Technical Question Answer Date

1 X Who is the project manager for this project? Helen Oppenheimer. See Bottom left hand side of sheet A.1 of the plan set.

4‐Mar‐21

2 X Is there going to be a pre‐bid conference? No. See The notice to Bidders

4‐Mar‐21

3 X Is there a prequalification to bid this project? This Project is a Total Small Business Set‐Aside. See Classification for this project on the Beta.Sam solicitation information. 4‐Mar‐21

4 X Is the Erosion Control Supervisor (ECS) required to be on the project site full time?

No, the ECS is required to be present on the project to perform the required duties as stipulated in Section 157 of the FP‐14 and the SCR’s

8‐Mar‐21

5 X specification 103.05 Partnering. I have read through the spec but do not feel confident that I understand it completely. Can you explain the Formal Partnering or do I need to talk to Helen Oppenheimer

FORMAL PARTNERING as used in section 103.05 the Government has agreed to pay for a portion of the direct costs (UP TO $5,000.00) that may be associated with the Partnering process. Which may include the partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings.

Please do not contact Helen Oppenheimer regarding question concerning this project. Instead contact wfl.plans‐spec: mailto:wfl.plans‐ spec@dot.gov

8‐Mar‐21

6 X Referencing Section 107.08:

If a contractor is licensed and certified by DEQ to abate asbestos; is the HAZWOPER still required?

YES 11‐Mar‐21

7 X Referencing Section 107.08:

IS HAZWOPER required for other portions of the project too? Or just the concrete rubble removal

The HAZWOPER requirement information is provided in section 107.08, Bid accordingly

11‐Mar‐21

Check General or Technical

8 X

1. Testing – What kind of testing is Fed Hwy looking for and in what areas? Are you looking for maximum theoretical density of the embanked material or are you looking for moisture testing? Some insight to the testing would be really helpful.

See FP‐14 section 204 Excavation and Embankment, Sub‐section 204.11 Compaction. AND Special Contract Requirements (SCR’s) Sub‐Section 204.10A(b)(1), (2) and (3). Bid accordingly

15‐Mar‐21

9 X

Aquatic Life Savage and Rescue – There is noting on the Bid Schedule that calls out for hours for Aquatic Life Savage. Is this something that ODFW will be taking care of or is this on the Contractor?

Contractors Responsibility. Bid Accordingly 15‐Mar‐21

10a X

18.8 Acres of Turf Establishment and Bare Areas –

a. With the lake dropping 2‐4’ during the summer is there a reason we are seeding water areas and the swells? Also the spec calls for not leaving any bare areas.

Please see Special Contract Requirements (SCR’s) Sub‐Section 625.03.

NPDES permit requires covering bare areas. Government provided seed is a native mix suited for wetlands. Bid Accordingly.

15‐Mar‐21

10b X

18.8 Acres of Turf Establishment and Bare Areas –

Continued:

b. Wouldn’t it be realistic to seed the whole project at the end of the project as the summer months would require a temporary sprinkler system and the temperatures would not allow the seed to germinate?

Please see Special Contract Requirements (SCR’s) Sub‐Section 625.03. Bid Accordingly

15‐Mar‐21