QA_8_March_21.pdf

PDF 80 KB Posted

Attached to
OR DOT 140(3), Mitigation Site for OR 140 Federal contract opportunity
Solicitation number
69056721B000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains questions and answers regarding Federal Contract Opportunity Number 69056721B000002 for mitigation site construction services for Oregon Department of Transportation Project Number OR DOT 140(3). The solicitation is a total small business set-aside for bids due on March 21, 2021. There will be no pre-bid conference, and an Erosion Control Supervisor is required to be present but not at all times. Partnering will be utilized on the project, with the government agreeing to pay up to $5,000 of direct partnering costs such as facilities, facilitation and copying fees. All questions should be directed to the email address provided rather than contacting the listed project manager directly.

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 140(3), Mitigation Site for OR 140, newest first.
File Type Posted
Bid Opening Summary_OR DOT 140(3).pdf PDF
QA_16_march_21.pdf PDF
QA_15_march_21.pdf PDF
QA_11_March_21.pdf PDF
QA_4_March_21.pdf PDF
GR10-17 OR-140 Prelim Geotech Charact Report.pdf PDF
or-14003 DITCH D HA-VA.pdf PDF
or-14003 DITCH E HA-VA.pdf PDF
GR27-18 Final Geotech Report OR DOT 140(1) Klamath County Boat Marina to Lakeshore Dr.pdf PDF
GM44-19 OR-140 MItigation Site Geotech Memo.pdf PDF
or-14003 DITCH B HA-VA.pdf PDF
or-14003 BERM HA-VA.pdf PDF
or-14003 DITCH C HA-VA.pdf PDF
or-14003_Control-Sheet.xlsx XLSX spreadsheet
Finalized or-14003_plans.pdf PDF
Compiled OR 140 Mitigation digiESCPFinal.pdf PDF
or-14003 DITCH A HA-VA.pdf PDF
IFB_OR DOT 140(3).pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. OR DOT 140(3) Project: Mitigation Site for OR 140

# General Technical Question Answer Date

1 X Who is the project manager for this project? Helen Oppenheimer. See Bottom left hand side of sheet A.1 of the plan set. 4-Mar-21

2 X Is there going to be a pre-bid conference? No. See The notice to Bidders

4-Mar-21

3 X

Is there a prequalification to bid this project? This Project is a Total Small Business Set- Aside. See Classification for this project on the Beta.Sam solicitation information. 4-Mar-21

4 X

Is the Erosion Control Supervisor (ECS) required t No, the ECS is required to be present on the project to perform the required duties as stipulated in Section 157 of the FP-14 and the SCR’s

8-Mar-21

5 X specification 103.05 Partnering. I have read through the spec but do not feel confident that I understand it completely. Can you explain the Formal Partnering or do I need to talk to Helen Oppenheimer

FORMAL PARTNERING as used in section

103.05 the Government has agreed to pay for a portion of the direct costs (UP TO $5,000.00) that may be associated with the Partnering process. Which may include the partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings.

Please do not contact Helen Oppenheimer regarding question concerning this project.

Instead contact wfl.plans-spec:

mailto:wfl.plans-spec@dot.gov

8-Mar-21

Check General or Technical