OMB-MJ0217000003-BP5-specifications Part 2.pdf
PDF 11 MB Posted
- Attached to
- Customs House Renovation and Addition
- Solicitation number
- OMB-MJ0217000003-BP5
- Issued by
- New Castle County, Delaware
About this file
This specification document and general conditions constitute the contract requirements for the Customs House Renovation and Addition project located at 516 N. King Street, Wilmington, Delaware, issued by the State of Delaware under GovTribe ID #MJ0217000003-BP5 with a project date of July 3, 2026. The project involves comprehensive renovation and addition work to an existing customs house structure, with the successful contractor required to furnish all labor, materials, equipment, and services necessary for complete execution and completion of the work in accordance with the contract documents. The contractor must submit a complete Schedule of Values within twenty days of receiving notice to proceed and shall not commence work until receipt of a bonafide State of Delaware Purchase Order. The contract documents include the AIA A232-2019 General Conditions as modified by supplementary conditions, general requirements, wage determination schedules, insurance and bonding requirements, and compliance documentation. Performance and Labor and Material Payment Bonds, each equal to the full contract price, must be furnished within twenty days of contract award by an acceptable bonding company licensed in Delaware.
Prevailing wage rates as determined by the Delaware Department of Labor apply to all laborers and mechanics employed on the project, with contractors required to submit weekly payroll reports to the Department of Labor for contracts exceeding $15,000 for renovation work. The contractor must maintain a two-year warranty on all materials and workmanship from the date of Substantial Completion and shall provide five percent retainage on monthly invoices until project completion, with retainage becoming payable upon receipt of all required closeout documentation. Contractors and subcontractors must implement an Employee Drug Testing Program in accordance with OMB Regulation 4104 for Large Public Works Projects, maintain craft training compliance per Delaware Code Title 29 Chapter 69 Section 6960A, and comply with prevailing wage and labor requirements under Delaware Code Title 29 Chapter 69 Section 6962. Final payment, including the five percent retainage if determined appropriate, shall be made within thirty days after the work is fully completed and all closeout documentation is provided, including evidence of paid payrolls and material bills, release of liens, warranties, as-built drawings, operations and maintenance manuals, and instruction manuals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
516 N. KING ST, WILMINGTON DE 19801 CUSTOMS HOUSE RENOVATION AND ADDITION
JULY 3, 2026 #MJ0217000003-BP5
TEVEBAUGH ARCHITECTURE GENERAL CONDITIONS TO THE CONTRACT
TA PROJECT NO. 21037 00 72 13 - 1
SECTION 00 72 13
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION A201-2017
The General Conditions of this Contract are as stated in the American Institute of Architects Document AIA A232 (2019 Edition) entitled General Conditions of the Contract for Construction as revised by the Supplementary General Conditions and is part of this project manual as if herein written in full.
END OF SECTION
NOT FOR BID
DIN
G PURPOSES
CUSTOMS HOUSE RENOVATION AND ADDITION 516 N. KING ST, WILMINGTON DE 19801
#MJ0217000003-BP5 JULY 3, 2026
GENERAL CONDITIONS TO THE CONTRACT TEVEBAUGH ARCHITECTURE
00 72 13 - 2 TA PROJECT NO. 21037
THIS PAGE LEFT INTENTIONALLY BLANK
NOT FOR BID
TEVEBAUGH ARCHITECTURE SUPPLEMENTARY GENERAL CONDITIONS
TA PROJECT NO. 21037 00 73 13 - 1
SECTION 00 73 13
SUPPLEMENTARY GENERAL CONDITIONS A232-2019
The following supplements modify the “General Conditions of the Contract for Construction, Construction Manager as Advisor Edition.”
AIA Document A232-2019. Where a portion of the General Conditions is modified or deleted by the Supplementary Conditions, the unaltered portions of the General Conditions shall remain in effect.
TABLE OF ARTICLES
1. GENERAL PROVISIONS
2. OWNER
3. CONTRACTOR
4. ARCHITECT AND CONSTRUCTION MANAGER
5. SUBCONTRACTORS
6. CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7. CHANGES IN THE WORK
8. TIME
9. PAYMENTS AND COMPLETION
10. PROTECTION OF PERSONS AND PROPERTY
11. INSURANCE AND BONDS
12. UNCOVERING AND CORRECTION OF WORK
13. MISCELLANEOUS PROVISIONS
14. TERMINATION OR SUSPENSION OF THE CONTRACT
15. CLAIMS AND DISPUTES
NOT FOR BID
SUPPLEMENTARY GENERAL CONDITIONS TEVEBAUGH ARCHITECTURE
00 73 13 - 2 TA PROJECT NO. 21037
ARTICLE 1: GENERAL PROVISIONS
1.1 BASIC DEFINITIONS
1.1.1 THE CONTRACT DOCUMENTS
Delete the last sentence in its entirety and replace with the following:
“The Contract Documents also include Advertisement for Bid, Instructions to Bidder, sample forms, the Bid Form, the Contractor’s completed Bid and the Award Letter.”
1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS
Add the following Paragraphs:
1.2.4 In the case of an inconsistency between the Drawings and the Specifications, or within either document not clarified by addendum, the better quality or greater quantity of work shall be provided in accordance with the Architect’s interpretation.
1.2.5 The word “PROVIDE” as used in the Contract Documents shall mean “FURNISH
AND INSTALL” and shall include, without limitation, all labor, materials, equipment, transportation, services and other items required to complete the Work.
1.2.6 The word “PRODUCT” as used in the Contract Documents means all materials, systems and equipment.
1.5 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF
SERVICE
Delete Paragraph 1.5.1 in its entirety and replace with the following:
“All pre-design studies, drawings, specifications and other documents, including those in electronic form, prepared by the Architect under this Agreement are, and shall remain, the property of the Owner whether the Project for which they are made is executed or not. As for the Project for which the Architect is hired, the Architect still remain liable for any claim relating to the design that arises from the Project.
However, such documents may be used by the Owner to construct one or more like projects without the approval of, or additional compensation to, the Architect. The Contractor, Subcontractors, Sub-subcontractors and Material or Equipment Suppliers are authorized to use and reproduce applicable portions of the Drawings, Specifications and other documents prepared by the Architect and the Architect’s consultants appropriate to and for use in the execution of their Work under the Contract Documents. They are not to be used by the Contractor or any Subcontractor, Sub-subcontractor or Material and Equipment Supplier on other Projects or for additions to this Project outside the scope of the Work without the specific written consent of the Owner, Architect and Architect’s consultants.
The Architect shall not be liable for injury or damage resulting from the re-use of drawings and specifications if the Architect is not involved in the re-use Project.”
NOT FOR BID
TEVEBAUGH ARCHITECTURE SUPPLEMENTARY GENERAL CONDITIONS
TA PROJECT NO. 21037 00 73 13 - 3
1.6 NOTICE
1.6.1 Insert the following sentence at the end of the paragraph:
“Electronic mail, also known as email, is an acceptable form of electronic transmission of notices under this Agreement.”
ARTICLE 2: OWNER
2.1 General
2.1.2 Delete Paragraph 2.1.2 in its entirety.
2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
2.2.1 Delete the second sentence in this paragraph and replace with the following: “The Contractor shall have no obligation to commence the Work until the Owner issues a Purchase Order for the Project.”
2.2.2 Delete the last three sentences in this paragraph.
ARTICLE 3: CONTRACTOR
3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR
3.2.4 Delete the third sentence in Paragraph 3.2.4.
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
3.3.2.1 The Contractor shall immediately remove from the Work, whenever requested to do so by the Owner, any person who is considered by the Owner or Architect to be incompetent or disposed to be disorderly, or who for any reason is not satisfactory to the Owner, and that person shall not again be employed on the Work without the consent of the Owner or the Architect.
3.3.4 The Contractor must provide suitable storage facilities at the Site, or an alternative site as approved by the Owner, for the proper protection and safe storage of their materials.
Consult the Owner and the Architect before storing any materials.
3.3.5 When any room is used as a shop, storeroom, office, etc., by the Contractor or
Subcontractor(s) during the construction of the Work, the Contractor making use of these areas will be held responsible for any repairs, patching or cleaning arising from such use.
NOT FOR BID
00 73 13 - 4 TA PROJECT NO. 21037
3.4 LABOR AND MATERIALS
3.4.1.1 Add a new section 3.4.1.1:
“The Contractor, at their expense shall bear the costs to accurately identify the location of all underground utilities in the area of their excavation and shall bear all cost for any repairs required, out of failure to accurately identify said utilities.”
Add the Following Paragraphs:
3.4.4 Before starting the Work, each Contractor shall carefully examine all preparatory Work that has been executed to receive their Work. Check carefully, by whatever means are required, to insure that its Work and adjacent, related Work, will finish to proper contours, planes and levels. Promptly notify the General Contractor/Construction Manager of any defects or imperfections in preparatory Work which will in any way affect satisfactory completion of its Work. Absence of such notification will be construed as an acceptance of preparatory Work and later claims of defects will not be recognized.
3.4.5 Under no circumstances shall the Contractor’s Work proceed prior to preparatory Work having been completely cured, dried and/or otherwise made satisfactory to receive this Work. Responsibility for timely installation of all materials rests solely with the Contractor responsible for that Work, who shall maintain coordination at all times.
3.5 WARRANTY
3.5.3 The Contractor will warrant all materials and workmanship against original defects, except injury from proper and usual wear when used for the purpose intended, for two years after Substantial Completion of the project in accordance with Section 9.8.4 of this Agreement, and will maintain all items in condition that conforms with the Contract Documents during the period of warranty.
3.5.4 Non-conforming work during the period of warranty will be corrected by the Contractor at its expense upon demand of the Owner, it being required that the Work conforms to the Contract Documents at the expiration of the warranty period.
3.5.5 In addition to the General Warranty there are other warranties required for certain items for different periods of time than the two years as above and are particularly so stated in that part of the specifications referring to same. The said warranties will commence at the same time as the General Warranty.
3.5.6 If the Contractor fails to remedy any failure, defect or damage within a reasonable time after receipt of notice, the Owner will have the right to replace, repair, or otherwise remedy the failure, defect or damage at the Contractor’s expense.
NOT FOR BID
TA PROJECT NO. 21037 00 73 13 - 5
3.11 DOCUMENTS AND SAMPLES AT THE SITE
3.11.1 During the course of the Work, the Contractor shall maintain a record set of drawings on which the Contractor shall mark the actual physical location of all piping, valves, equipment, conduit, outlets, access panels, controls, actuators, including all appurtenances that will be concealed once construction is complete, etc., including all invert elevations.
3.11.2 At the completion of the project, the Contractor shall obtain a set of reproducible drawings from the Architect, and neatly transfer all information outlined in 3.11.1 to provide a complete record of the as-built conditions.
3.11.3 The Contractor shall provide two (2) prints of the as-built conditions, along with the reproducible drawings themselves, to the Owner and one (1) set to the Architect. In addition, attach one complete set to each of the Operating and Maintenance Instructions/Manuals.
3.15 CLEANING UP
3.15.2 Strike sentence in its entirety and replace with the following:
“If the Contractor fails to clean up as provided in the Contract Documents, the Owner, or Construction Manager with the Owner’s approval, may do so and the Owner shall withhold the amount that reflects the cost of the cleanup from any moneys owed the Contractor. If the cost of cleanup exceeds the moneys owed to the Contractor, the Owner shall be entitled to reimbursement from the Contractor for the amount exceeding what is withheld.
3.17 In the second sentence of 3.17, insert “indemnify and” between “shall” and “hold”.
ARTICLE 4: ARCHITECT AND CONSTRUCTION MANAGER
4.2 Administration of the Contract
Delete the first sentence of Paragraph 4.2.11 and replace with the following:
The Architect will review and approve or take other appropriate action upon the Contractor’s submittals such as Shop Drawings, Product Data and Samples for the purpose of checking for conformance with the Contract Documents.
Delete the second sentence of Paragraph 4.2.11 and replace with the following:
The Architect’s action will be taken with such reasonable promptness as to cause no delay in the Work in the activities of the Owner, Contractor or separate Contractors, while allowing sufficient time in the Owner’s professional judgment to permit adequate review.
Add the following to Paragraph 4.2.17:
There will be no full-time Project representative provided by the Owner or Architect on site for this Project.
Add to Paragraph 4.2.20 “and in compliance with all applicable codes, regulations and ordinances.”
to the end of the sentence.
NOT FOR BID
00 73 13 - 6 TA PROJECT NO. 21037
ARTICLE 5: SUBCONTRACTORS
5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK
Delete Paragraph 5.2.3 in its entirety and replace with the following:
5.2.3 If the Owner, Architect or Construction Manager has reasonable objection to a person or entity proposed by the Contractor, the Contractor shall propose another to whom the Owner, Architect or Construction Manager has no reasonable objection, subject to the statutory requirements of 29 Delaware Code § 6962(d)(10)b.3 and 4.
ARTICLE 6: CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
6.1 OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS
6.1.1 Delete “and waiver of subrogation” from the last sentence.
6.1.3 Delete Paragraph 6.1.3 in its entirety and replace with the following:
“When separate contracts are awarded for different portions of the Project or other construction or operations on the site, the term “Contractor” in the Contract Documents in each case shall mean the Constructor who executes each separate Owner-Contractor Agreement.”
6.2 MUTUAL RESPONSIBILITY
6.2.3 In the second sentence, strike the word “shall” and insert the word “may”.
ARTICLE 7: CHANGES IN THE WORK
(SEE ARTICLE 7: CHANGES IN WORK IN THE GENERAL REQUIREMENTS)
ARTICLE 8: TIME
8.2 PROGRESS AND COMPLETION
8.2.1.1 Refer to Specification Section SUMMARY OF WORK for Contract time requirements.
8.2.4 If the Work falls behind the Progress Schedule as submitted by the Contractor, the
Contractor shall employ additional labor and/or equipment necessary to bring the Work into compliance with the Progress Schedule at no additional cost to the Owner.
8.3 DELAYS AND EXTENSION OF TIME
8.3.1 Strike “binding dispute resolution” and insert “remedies at law or in equity”.
Add the following Paragraph:
8.3.2.1 The Contractor shall update the status of the suspension, delay, or interruption of the Work with each Application for Payment. (The Contractor shall report the termination of such cause immediately upon the termination thereof.) Failure to comply with this procedure shall constitute a waiver for any claim for adjustment of time or price based upon said cause.
NOT FOR BID
TA PROJECT NO. 21037 00 73 13 - 7
Delete Paragraph 8.3.3 in its entirety and replace with the following:
8.3.3 Except in the case of a suspension of the Work directed by the Owner, an extension of time under the provisions of Paragraph 8.3.1 shall be the Contractor’s sole remedy in the progress of the Work and there shall be no payment or compensation to the Contractor for any expense or damage resulting from the delay.
8.3.4 By permitting the Contractor to work after the expired time for completion of the project, the Owner does not waive its rights under the Contract.
8.3.5 The parties agree that Paragraph 8.3.3 of the Supplementary General Conditions does not apply to the Construction Manager in the event of a delay caused by a party other than the Construction Manager.
ARTICLE 9: PAYMENTS AND COMPLETION
9.1 CONTRACT SUM
9.1.2 Strike Section 9.1.2 in its entirety.
9.2 SCHEDULE OF VALUES
9.2.1 The Schedule of Values shall be submitted using AIA Document G732, Continuation Sheet to G703.
9.3 APPLICATIONS FOR PAYMENT
9.3.1.3 Application for Payment shall be submitted on AIA Document G732 “Application and Certificate for Payment”, supported by AIA Document G703 “Continuation Sheet”. Said Applications shall be fully executed and notarized.
9.3.4 Until Closeout Documents have been received and outstanding items completed the Owner will pay 95% (ninety-five percent) of the amount due the Contractor on account of progress payments.
9.3.5 The Contractor shall provide a current and updated Progress Schedule to the Architect with each Application for Payment. Failure to provide Schedule will be just cause for rejection of Application for Payment.
9.5 DECISIONS TO WITHHOLD CERTIFICATION
Add the following to 9.5.1:
.8 failure to provide a current Progress Schedule;
.9 a lien or attachment is filed;
.10 failure to comply with mandatory requirements for maintaining Record Documents.
9.6 PROGRESS PAYMENTS
NOT FOR BID
00 73 13 - 8 TA PROJECT NO. 21037
Delete Paragraph 9.6.1 in its entirety and replace with the following:
9.6.1 After the Architect and the Construction Manager have approved and issued a
Certificate for Payment, payment shall be made by the Owner within 30 days after Owner’s receipt of the Certificate for Payment.
9.6.8 Strike “Provided the Owner has fulfilled its payment obligations under the Contract
Documents, the” and replace with “The”.
9.7 FAILURE OF PAYMENT
In first sentence, strike the first reference to “seven” and insert “thirty (30)”. Also strike “binding dispute resolution” and insert “remedies at law or in equity”.
9.8 SUBSTANTIAL COMPLETION
9.8.5 In the second sentence, strike “shall” and insert “may”.
ARTICLE 10: PROTECTION OF PERSONS AND PROPERTY
10.1 SAFETY PRECAUTIONS AND PROGRAMS
10.1.1 Each Contractor shall develop a safety program in accordance with the Occupational Safety and Health Act of 1970. A copy of said plan shall be furnished to the Owner and Architect prior to the commencement of that Contractor’s Work.
10.1.2 Each Contractor shall appoint a Safety Representative. Safety Representatives shall be someone who is on site on a full-time basis. If deemed necessary by the Owner or Architect, Contractor Safety meetings will be scheduled. The attendance of all Safety Representatives will be required. Minutes will be recorded of said meetings by the Contractor and will be distributed to all parties as well as posted in all job offices/trailers etc.
10.2 SAFETY OF PERSONS AND PROPERTY
10.2.4.1 As required in the Hazardous Chemical Act of June 1984, all vendors supplying any material that may be defined as hazardous must provide Material Safety Data Sheets for those products. Any chemical product should be considered hazardous if it has a caution warning on the label relating to a potential physical or health hazard, if it is known to be present in the workplace, and if employees may be exposed under normal conditions or in foreseeable emergency situations. Material Safety Data Sheets shall be provided directly to the Owner or its designee, along with the shipping slips that include those products.
10.3 HAZARDOUS MATERIALS
Delete Paragraph 10.3.3 in its entirety.
Delete Paragraphs 10.3.6 in its entirety.
TEVEBAUGH ARCHITECTURE SUPPLEMENTARY GENERAL CONDITIONS
TA PROJECT NO. 21037 00 73 13 - 9
ARTICLE 11: INSURANCE AND BONDS
11.1 CONTRACTOR’S INSURANCE AND BONDS
11.1.1 Strike “Owner,” at the beginning of the third sentence.
11.1.2 Add the following sentence at the end of the paragraph: “The bonds will conform to those forms approved by the Office of Management and Budget.”
11.2 OWNER’S INSURANCE
Delete Paragraph 11.2 in its entirety and replace with the following:
11.2 The Owner will not provide Builder’s All Risk Insurance for the Project. The Construction Manager will provide Builder’s All Risk Insurance for the Project. The Contractor and all Subcontractors shall provide coverage for materials, fixtures and/or equipment being used in the construction or renovation of a building or structure should those items sustain physical loss or damage from a covered cause.
11.3 WAIVERS OF SUBROGATION
Delete Paragraph 11.3 and its subparagraphs in their entirety. Substitute the following:
The Construction Manager and Contractor waive all rights against (1) each other and any of their subcontractors, sub-subcontractors, agents, consultants and employees, each of the other; (2) the Architect and Architect’s consultants; (3) other Contractors and any of their subcontractors, sub-subcontractors, agents, and employees; and (4) Separate Contractors, if any, and any of their subcontractors, sub-subcontractors, agents, and employees, for damages caused by fire, or other causes of loss, to the extent those losses are covered by property insurance required by the Agreement or other property insurance applicable to the Project, except such rights as they have to proceeds of such insurance. The policies of insurance purchased and maintained by each person or entity agreeing to waive claims pursuant to this Article shall not prohibit this waiver of subrogation.
This waiver of subrogation shall be effective as to a person or entity (1) even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, (2) even though that person or entity did not pay the insurance premium directly or indirectly, or (3) whether or not the person or entity had an insurable interest in the damaged property. For clarity, the Owner does not waive any of its subrogation rights.
11.4 LOSS OF USE, BUSINESS INTERRUPTION, AND DELAY IN COMPLETION INSURANCE
Delete Paragraph 11.4 in its entirety.
11.5 ADJUSTMENT AND SETTLEMENT OF INSURED LOSS
Delete Paragraph 11.5 in its entirety. Substitute the following:
A loss insured under the property insurance required by the Agreement shall be adjusted by the Construction Manager and made payable to the Construction Manager. The Construction Manager shall pay the Architect and Contractor their just shares of insurance proceeds received by the Construction Manager, and by appropriate agreements the Architect and Contractor shall make payments to their consultants and Subcontractors in similar manner. Prior to settlement of an insured loss, the Construction Manager shall notify the Contractor of the terms of the proposed settlement as well as the proposed allocation of the insurance proceeds. The Contractor shall have 14 days from receipt of notice to object to the proposed settlement or allocation of the proceeds. If the Contractor does not object, the Construction Manager shall settle the loss and the Contractor shall be bound by the settlement and allocation. If the Contractor timely objects to either the terms of the proposed settlement or the allocation of the proceeds, the Construction Manager may proceed to settle the insured loss, and any dispute between the Construction Manager and Contractor arising out of the settlement or allocation of the proceeds shall be resolved pursuant remedies at law and in equity. For
NOT FOR BID
SUPPLEMENTARY GENERAL CONDITIONS TEVEBAUGH ARCHITECTURE
00 73 13 - 10 TA PROJECT NO. 21037
clarity, the Owner shall be listed as an Additional Insured to protect the Owner’s property interest on the Project under the Builder’s Risk Insurance.
ARTICLE 12: UNCOVERING AND CORRECTION OF WORK
12.2.2 AFTER SUBSTANTIAL COMPLETION
12.2.2.1 In the first sentence, strike “within one year after the date of Substantial Completion of the
Work or designated portion thereof” and replace with “within two years after the date of Substantial Completion of the Project in accordance with Section 9.8.4 of this Agreement or designated portion thereof”.
12.2.2.1 In the third sentence of the paragraph, strike “one year period” and replace it with “two year period”.
Add the following Paragraph:
12.2.2.1.1 At any time during the progress of the Work, or in any case where the nature of the defects will be such that it is not expedient to have corrected, the Owner, at its option, will have the right to deduct such sum, or sums, of money from the amount of the Contract as it considers justified to adjust the difference in value between the defective work and that required under contract including any damage to the structure.
12.2.2.2 Strike “one” and insert “two”.
12.2.2.3 Strike “one” and insert “two”.
12.2.5 In second sentence, strike “one” and insert “two”.
ARTICLE 13: MISCELLANEOUS PROVISIONS
13.1 GOVERNING LAW
13.1 Strike the second sentence in its entirety.
13.5 INTEREST
13.5 Strike 13.5 in its entirety and replace with the following:
"Payments are due 30 days after receipt of a valid Application for Payment. After that 30 day period, interest may be charged at the rate of 1% per month not to exceed 12% per annum."
13.6 CONFLICTS WITH FEDERAL STATUTES OR REGULATIONS
13.6.1 If any provision, specifications or requirement of the Contract Documents conflict or is inconsistent with any statute, law or regulation of the government of the United State of America, the Contractor shall notify the Architect and Owner immediately upon discovery.
ARTICLE 14: TERMINATION OR SUSPENSION OF THE CONTRACT
14.4 TERMINATION BY THE OWNER FOR CONVENIENCE
NOT FOR BID
TA PROJECT NO. 21037 00 73 13 - 11
Delete Paragraph 14.4.3 in its entirety and replace with the following:
14.4.3 In case of such termination for the Owner’s convenience, the Contractor shall be entitled to receive payment for Work executed, and cost incurred by reason of such termination along with reasonable overhead.
ARTICLE 15: CLAIMS AND DISPUTES
15.1.2 TIME LIMITS ON CLAIMS.
15.1.2 Strike “in accordance with the requirements of the binding dispute resolution method selected in the Agreement and” from the first sentence.
Strike the second sentence in its entirety.
15.1.4 CONTINUING CONTRACT PERFORMANCE
15.1.4.2 Strike in its entirety.
15.1.7 CLAIMS FOR CONSEQUENTIAL DAMAGES
Delete Paragraph 15.1.7 and its subparagraphs in their entirety.
15.2 INITIAL DECISION
15.2.1 Delete “and binding dispute resolution”
15.2.5 Delete in its entirety and replace with the following:
15.2.5 The Architect will approve or reject Claims by written decision, which shall state the reasons therefore and shall notify the parties of any change in the Contract Sum or Contract Time or both. The approval or rejection of a Claim by the Architect shall be subject to mediation and other remedies at law or in equity.
Delete Paragraph 15.2.6 and its subparagraphs in their entirety.
15.3 MEDIATION
15.3.1 Strike “binding dispute resolution” and insert “any or all remedies at law or in equity”.
15.3.2 In the first sentence, delete “administered by the American Arbitration Association in accordance with its Construction Industry Mediation Procedure in effect on the date of the Agreement,”. Also strike “binding dispute resolution” and insert “remedies at law and in equity”.
15.3.3 Strike in its entirety.
15.4 ARBITRATION
Delete Paragraph 15.4 and its subparagraphs in their entirety.
END OF SECTION
00 73 13 - 12 TA PROJECT NO. 21037
THIS PAGE LEFT INTENTIONALLY BLANK
516 N. KING ST, WILMINGTON DE 19801 CUSTOM HOUSE RENOVATION AND ADDITION
TEVEBAUGH ARCHITECTURE WAGE DETERMINATION SCHEDULE
TA PROJECT NO. 21037 00 73 43 - 1
SECTION 00 73 46
WAGE DETERMINATION SCHEDULE
1. SUMMARY
A. In accordance with Delaware Code, Title 29, Chapter 69, Section 6912, all laborers and mechanics of the Contractor and all subcontractors employed to perform work directly upon the site of the work shall be paid unconditionally and not less often than once a week and without subsequent deduction or rebate on any account the full amounts accrued at the time of payment computed at wage rates not less than those determined by the Division of Industrial Affairs, Department of Labor, State of Dela-ware, as the prevailing rates in this area.
B. This approved scale of wages must be posted by the Contractor in a prominent and easily accessible place at the site of the work.
C. It is further stipulated that there may be withheld from the Contractor such accrued payment as may be considered necessary by the contracting officer to pay laborers and mechanics employed by the Contractor or any subcontractors on the work the difference between the rates of wages required and the rate of wages received by such laborers and mechanics and not refunded to the Contractor, subcontractor or their agents.
D. Where wage rates are published in this Manual they are issued by the State Depart-ment of Labor on the date indicated and are included for the convenience of Bidders.
The Owner, the Architect, and the Construction Manager, accept no responsibility for the accuracy or applicability of any rates included herein. The actual wage rate de-terminations which will apply to the work will be those in effect on the first day of pub-lic advertisement for bids as determined by the State Department of Labor. It will be the responsibility of each bidder to contact the State Department of Labor and to in-corporate these rates in his bid.
E. "In accordance with Delaware Code, Title 29, Section 6912, as amended July 5, 1994, contractors shall furnish sworn payroll information to the Department of Labor on a weekly basis for each contract which exceeds $15,000 for renovation work and $100,000 for new construction. The construction contract amount is based on a cu-mulative total of all contracts bid for a specific project. Payroll forms for submission may be obtained from the Department of Labor."
1. A Payroll Report, available from the Department of Labor is to be used to provide this information.
F. A copy of the Prevailing Wages for the project is attached hereto.
CUSTOM HOUSE RENOVATION AND ADDITION 516 N. KING ST, WILMINGTON, DE 19801
WAGE DETERMINATION SCHEDULE TEVEBAUGH ARCHITECTURE
00 73 43 - 2 TA PROJECT NO. 21037
516 N. KING ST, WILMINGTON DE 19801 CUSTOM HOUSE RENOVATION AND ADDITION
TEVEBAUGH ARCHITECTURE WAGE DETERMINATION SCHEDULE
TA PROJECT NO. 21037 00 73 43 - 3
CUSTOM HOUSE RENOVATION AND ADDITION 516 N. KING ST, WILMINGTON, DE 19801
WAGE DETERMINATION SCHEDULE TEVEBAUGH ARCHITECTURE
00 73 43 - 4 TA PROJECT NO. 21037
THIS PAGE INTENTIONALLY LEFT BLANK
TEVEBAUGH ARCHITECTURE GENERAL REQUIREMENTS
TA PROJECT NO. 21037 00 81 13 - 1
SECTION 00 81 13
GENERAL REQUIREMENTS
TABLE OF ARTICLES
1. GENERAL
2. OWNER
3. CONTRACTOR
4. ADMINISTRATION OF THE CONTRACT
5. SUBCONTRACTORS
6. CONSTRUCTION BY OWNER OR SEPARATE CONTRACTORS
7. CHANGES IN THE WORK
8. TIME
9. PAYMENTS AND COMPLETION
10. PROTECTION OF PERSONS AND PROPERTY
11. INSURANCE AND BONDS
12. UNCOVERING AND CORRECTION OF WORK
13. MISCELLANEOUS PROVISIONS
14. TERMINATION OR SUSPENSION OF THE CONTRACT
GENERAL REQUIREMENTS TEVEBAUGH ARCHITECTURE
00 81 13 - 2 TA PROJECT NO. 21037
ARTICLE 1: GENERAL
1.1 CONTRACT DOCUMENTS
1.1.1 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary and what is required by one shall be as binding as if required by all. Performance by the Contractor shall be required to an extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results.
1.1.2 Work including material purchases shall not begin until the Contractor is in receipt of a bonafide State of Delaware Purchase Order. Any work performed or material purchases prior to the issuance of the Purchase Order is done at the Contractor’s own risk and cost.
1.2 EQUALITY OF EMPLOYMENT OPPORTUNITY ON PUBLIC WORKS
1.2.1 For Public Works Projects financed in whole or in part by state appropriation the Contractor agrees that during the performance of this contract:
1. The Contractor will not discriminate against any employee or applicant for employment because of race, creed, sex, color, sexual orientation, gender identity or national origin. The Contractor will take positive steps to ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, sex, color, sexual orientation, gender identity or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places available to employees and applicants for employment notices to be provided by the contracting agency setting forth this nondiscrimination clause.
2. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed, sex, color, sexual orientation, gender identity or national origin.”
(NO ADDITIONAL GENERAL REQUIREMENTS – SEE SUPPLEMENTARY GENERAL
CONDITIONS)
3.1 Schedule of Values: The successful Bidder shall within twenty (20) days after receiving notice to proceed with the work, furnish to the Owner a complete schedule of values on the various items comprising the work.
3.2 Subcontracts: Upon approval of Subcontractors, the Contractor shall award their Subcontracts as soon as possible after the signing of their own contract and see that all material, their own and those of their Subcontractors, are promptly ordered so that the work will not be delayed by failure of materials to arrive on time.
TEVEBAUGH ARCHITECTURE GENERAL REQUIREMENTS
TA PROJECT NO. 21037 00 81 13 - 3
3.3 Before commencing any work or construction, the General Contractor is to consult with the Owner as to matters in connection with access to the site and the allocation of Ground Areas for the various features of hauling, storage, etc.
3.4 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention.
The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions.
3.5 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them.
3.6 The Contractor warrants to the Owner that materials and equipment furnished will be new and of good quality, unless otherwise permitted, and that the work will be free from defects and in conformance with the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved, may be considered defective. If required by the Owner, the Contractor shall furnish evidence as to the kind and quality of materials and equipment provided.
3.7 Unless otherwise provided, the Contractor shall pay all sales, consumer, use and other similar taxes, and shall secure and pay for required permits, fees, licenses, and inspections necessary for proper execution of the Work.
3.8 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations, and lawful orders of public authorities bearing on performance of the Work. The Contractor shall promptly notify the Owner if the Drawings and Specifications are observed to be at variance therewith.
3.9 The Contractor shall be responsible to the Owner for the acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under contract with the Contractor.
3.10 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work the Contractor shall remove from and about the Project all waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. The Contractor shall be responsible for returning all damaged areas to their original conditions.
3.11 STATE LICENSE AND TAX REQUIREMENTS
3.11.1 Each Contractor and Subcontractor shall be licensed to do business in the State of Delaware and shall pay all fees and taxes due under State laws. In conformance with Section 2503, Chapter 25, Title 30, Delaware Code, "the Contractor shall furnish the Delaware Department of Finance within ten (10) days after entering into any contract with a contractor or subcontractor not a resident of this State, a statement of total value of such contract or contracts together with the names and addresses of the contracting parties.”
3.12 The Contractor shall comply with all requirements set forth in Section 6962, Chapter 69, Title 29 of the Delaware Code.
3.13 During the contract Work, the Contractor and each Subcontractor, shall implement an Employee
Drug Testing Program in accordance with OMB Regulation 4104 - “Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on “Large Public Works Projects”.
“Large Public Works” is based upon the current threshold required for bidding Public Works as set by the Purchasing and Contracting Advisory Council.
GENERAL REQUIREMENTS TEVEBAUGH ARCHITECTURE
00 81 13 - 4 TA PROJECT NO. 21037
ARTICLE 4: ADMINISTRATION OF THE CONTRACT
4.1 CONTRACT SURETY
4.1.1 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND
4.1.2 All bonds will be required as follows unless specifically waived elsewhere in the Bidding Documents.
4.1.3 Contents of Performance Bonds – The bond shall be in the form approved by the Office of
Management and Budget. The bond shall be conditioned upon the faithful compliance and performance by the successful bidder of each and every term and condition of the contract and the proposal, plans, specifications, and bid documents thereof. Each term and condition shall be met at the time and in the manner prescribed by the Contract, Bid documents and the specifications, including the payment in full to every person furnishing materiel or performing labor in the performance of the Contract, of all sums of money due the person for such labor and materiel. (The bond shall also contain the successful bidder’s guarantee to indemnify and save harmless the State and the agency from all costs, damages and expenses growing out of or by reason of the Contract in accordance with the Contract.)
4.1.4 Invoking a Performance Bond – The agency may, when it considers that the interest of the State so requires, cause judgement to be confessed upon the bond.
4.1.5 Within twenty (20) days after the date of notice of award of contract, the Bidder to whom the award is made shall furnish a Performance Bond and Labor and Material Payment Bond, each equal to the full amount of the Contract price to guarantee the faithful performance of all terms, covenants and conditions of the same. The bonds are to be issued by an acceptable Bonding Company licensed to do business in the State of Delaware and shall be issued in duplicate.
4.1.6 Performance and Payment Bonds shall be maintained in full force (warranty bond) for a period of two
(2) years after the date of the Certificate for Final Payment. The Performance Bond shall guarantee the satisfactory completion of the Project and that the Contractor will make good any faults or defects in his work which may develop during the period of said guarantees as a result of improper or defective workmanship, material or apparatus, whether furnished by themselves or their Sub- Contractors. The Payment Bond shall guarantee that the Contractor shall pay in full all persons, firms or corporations who furnish labor or material or both labor and material for, or on account of, the work included herein. The bonds shall be paid for by this Contractor. The Owner shall have the right to demand that the proof parties signing the bonds are duly authorized to do so.
4.2 FAILURE TO COMPLY WITH CONTRACT
4.2.1 If any firm entering into a contract with the State, or Agency that neglects or refuses to perform or fails to comply with the terms thereof, the Agency which signed the Contract may terminate the Contract and proceed to award a new contract in accordance with this Chapter 69, Title 29 of the Delaware Code or may require the Surety on the Performance Bond to complete the Contract in accordance with the terms of the Performance Bond. Nothing herein shall preclude the Agency from pursing additional remedies as otherwise provided by law.
NOT FOR BID
TEVEBAUGH ARCHITECTURE GENERAL REQUIREMENTS
TA PROJECT NO. 21037 00 81 13 - 5
4.3 CONTRACT INSURANCE AND CONTRACT LIABILITY
4.3.1 In addition to the bond requirements stated in the Bid Documents, each successful Bidder shall purchase adequate insurance for the performance of the Contract and, by submission of a Bid, agrees to indemnify and save harmless and to defend all legal or equitable actions brought against the State, any Agency, officer and/or employee of the State, for and from all claims of liability which is or may be the result of the successful Bidder’s actions during the performance of the Contract.
4.3.2 The purchase or nonpurchase of such insurance or the involvement of the successful Bidder in any legal or equitable defense of any action brought against the successful Bidder based upon work performed pursuant to the Contract will not waive any defense which the State, its agencies and their respective officers, employees and agents might otherwise have against such claims, specifically including the defense of sovereign immunity, where applicable, and by the terms of this section, the State and all agencies, officers and employees thereof shall not be financially responsible for the consequences of work performed, pursuant to said contract.
4.4 RIGHT TO AUDIT RECORDS
4.4.1 The Owner shall have the right to audit the books and records of a Contractor or any
Subcontractor under any Contract or Subcontract to the extent that the books and records relate to the performance of the Contract or Subcontract.
4.4.2 Said books and records shall be maintained by the Contractor for a period of seven (7) years from the date of final payment under the Prime Contract and by the Subcontractor for a period of seven (7) years from the date of final payment under the Subcontract.
ARTICLE 5: SUBCONTRACTORS
5.1 SUBCONTRACTING REQUIREMENTS
5.1.1 All contracts for the construction, reconstruction, alteration or repair of any public building (not a road, street or highway) shall be subject to the following provisions:
1. A contract shall be awarded only to a Bidder whose Bid is accompanied by a statement containing, for each Subcontractor category, the name and address (city or town and State only – street number and P.O. Box addresses not required) of the subcontractor whose services the Bidder intends to use in performing the Work and providing the material for such Subcontractor category.
2. A Bid will not be accepted nor will an award of any Contract be made to any Bidder which, as the Prime Contractor, has listed itself as the Subcontractor for any Subcontractor unless:
A. It has been established to the satisfaction of the awarding Agency that the Bidder has customarily performed the specialty work of such Subcontractor category by artisans regularly employed by the Bidder’s firm;
B. That the Bidder is duly licensed by the State to engage in such specialty work, if the State requires licenses; and
C. That the Bidder is recognized in the industry as a bona fide Subcontractor or Contractor in such specialty work and Subcontractor category.
GENERAL REQUIREMENTS TEVEBAUGH ARCHITECTURE
00 81 13 - 6 TA PROJECT NO. 21037
5.1.2 The decision of the awarding Agency as to whether a Bidder who list itself as the Subcontractor for a Subcontractor category shall be final and binding upon all Bidders, and no action of any nature shall lie against any awarding agency or its employees or officers because of its decision in this regard.
5.1.3 After such a Contract has been awarded, the successful Bidder shall not substitute another
Subcontractor for any Subcontractor whose name was set forth in the statement which accompanied the Bid without the written consent of the awarding Agency.
5.1.4 No Agency shall consent to any substitution of Subcontractors unless the Agency is satisfied that the
Subcontractor whose name is on the Bidders accompanying statement:
A. Is unqualified to perform the work required;
B. Has failed to execute a timely reasonable Subcontract;
C. Has defaulted in the performance on the portion of the work covered by the Subcontract;
or
D. Is no longer engaged in such business.
5.1.5 Should a Bidder be awarded a contract, such successful Bidder shall provide to the agency the taxpayer identification license numbers of such subcontractors. Such numbers shall be provided on the later of the date on which such subcontractor is required to be identified or the time the contract is executed. The successful Bidder shall provide to the agency to which it is contracting, within 30 days of entering into such public works contract, copies of all Delaware Business licenses of subcontractors and/or independent contractors that will perform work for such public works contract.
However, if a subcontractor or independent contractor is hired or contracted more than 20 days after the Bidder entered the public works contract the Delaware Business license of such subcontractor or independent contractor shall be provided to the agency within 10 days of being contracted or hired.
5.1.6 The Contractor may employ additional Subcontractors on the jobsite only after submitting a copy of the Subcontractor’s Employee Drug Testing Program to the Owner for approval. A Contractor or Subcontractor shall not commence work until the Owner has concluded its review and determined that the submitted Employee Drug Testing Program complies with OMB Regulation 4104.
5.2 PENALTY FOR SUBSTITUTION OF SUBCONTRACTORS
5.2.1 Should the Contractor fail to utilize any or all of the Subcontractors in the Contractor’s Bid statement in the performance of the Work on the public bidding, the Contractor shall be penalized in the amount of (project specific amount*). The Agency may determine to deduct payments of the penalty from the Contractor or have the amount paid directly to the Agency. Any penalty amount assessed against the Contractor may be remitted or refunded, in whole or in part, by the Agency awarding the Contract, only if it is established to the satisfaction of the Agency that the Subcontractor in question has defaulted or is no longer engaged in such business. No claim for the remission or refund of any penalty shall be granted unless an application is filed within one year after the liability of the successful Bidder accrues. All
NOT FOR BID
TEVEBAUGH ARCHITECTURE GENERAL REQUIREMENTS
TA PROJECT NO. 21037 00 81 13 - 7
penalty amounts assessed and not refunded or remitted to the contractor shall be reverted to the State.
*one (1) percent of contract amount not to exceed $10,000
5.3 ASBESTOS ABATEMENT
5.3.1 The selection of any Contractor to perform asbestos abatement for State-funded projects shall be approved by the Office of Management and Budget, Division of Facilities Management pursuant to Chapter 78 of Title 16.
5.4 STANDARDS OF CONSTRUCTION FOR THE PROTECTION OF THE PHYSICALLY
HANDICAPPED
5.4.1 All Contracts shall conform with the standard established by the Delaware Architectural
Accessibility Board unless otherwise exempted by the Board.
5.5 CONTRACT PERFORMANCE
5.5.1 Any firm entering into a Public Works Contract that neglects or refuses to perform or fails to comply with its terms, the Agency may terminate the Contract and proceed to award a new Contract or may require the Surety on the Performance Bond to complete the Contract in accordance with the terms of the Performance Bond.
ARTICLE 6: CONSTRUCTION BY OWNER OR SEPARATE CONTRACTORS
6.1 The Owner reserves the right to simultaneously perform other construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other Projects at the same site.
6.2 The Contractor shall afford the Owner and other Contractors reasonable opportunity for access and storage of materials and equipment, and for the performance of their activities, and shall connect and coordinate their activities with other forces as required by the Contract Documents.
ARTICLE 7: CHANGES IN THE WORK
7.1 The Owner, without invalidating the Contract, may order changes in the Work consisting of Additions, Deletions, Modifications or Substitutions, with the Contract Sum and Contract completion date being adjusted accordingly. Such changes in the Work shall be authorized by written Change Order signed by the Professional, as the duly authorized agent, the Contractor and the Owner.
7.2 The Contract Sum and Contract Completion Date shall be adjusted only by a fully executed Change
Order.
7.3 The additional cost, or credit to the Owner resulting from a change in the Work shall be by mutual agreement of the Owner, Contractor and the Architect. In all cases, this cost or credit shall be based on the ‘DPE’ wages required and the “invoice price” of the materials/equipment needed.
7.3.1 “DPE” shall be defined to mean “direct personnel expense”. Direct payroll expense includes prevailing wage rates plus a maximum multiplier of 1.35 times DPE. For example, if the prevailing wage rate is $50/hour, the DPE would be $67.50/hour (50 x 1.35).
7.3.2 “Invoice price” of materials/equipment shall be defined to mean the actual cost of materials and/or equipment that is paid by the Contractor, (or subcontractor), to a material distributor, direct factory vendor, store, material provider, or equipment leasing entity. Rates for equipment that is leased
NOT FOR BID
GENERAL REQUIREMENTS TEVEBAUGH ARCHITECTURE
00 81 13 - 8 TA PROJECT NO. 21037
and/or owned by the Contractor or subcontractor(s) shall not exceed those listed in the latest version of the “Means Building Construction Cost Data” publication.
7.3.3 In addition to the above:
7.3.3.1 The General Contractor is allowed a fifteen percent (15%) markup for overhead and profit for additional work performed by the General Contractor’s own forces.
7.3.3.2 For additional subcontractor work, the Subcontractor is allowed a fifteen (15) percent overhead and profit on change order work above and beyond the direct costs stated previously. To this amount, the General Contractor will be allowed a mark-up not exceeding seven- and one-half percent (7.5%) on the subcontractor’s work.
7.3.3.3 Where the Third Tier Contractor is going to be completing the additional work, the Third-Tier contractor will be allowed a markup of fifteen percent (15%) overhead and profit on changes order work above and beyond the direct costs stated previously. To this amount, the Subcontractor will be allowed a markup not to exceed seven and one-half percent (7.5%) on the Third-Tier Contractor’s work and the General Contractor will be allowed a markup not to exceed seven and one-half percent (7.5%) of the amount of the Subcontractor’s markup.
7.3.3.4 No additional costs shall be allowed for changes related to the Contractor’s onsite superintendent/staff, or project manager, unless a change in the work changes the project duration and is identified by the CPM schedule. There will be no other costs associated with the change order.
7.3.3.5 These markups shall include all costs including, but not limited to: overhead, profit, bonds, insurance, supervision, etc.
ARTICLE 8: TIME
8.1 Time limits, if any, are as stated in the Project Manual. By executing the Agreement, the Contractor confirms that the stipulated limits are reasonable, and that the…