NSN Services Final RFP.pdf
PDF 935 KB Posted
- Attached to
- Near Space Network Services - Final RFP Federal contract opportunity
- Solicitation number
- 80GSFC22R0029
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
B.2 SUPPLIES AND/OR SERVICES TO BE PROVIDED
B.3 GSFC 52.216-92 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES (FIXED
PRICE) (APR 2008)
B.4 SUPPLEMENTAL TASK ORDERING PROCEDURES
B.5 GSFC 52.217-90 OPTION TO EXTEND (SEP 2013)
B.6 GSFC 52.232-99 DELIVERY PAYMENT SCHEDULE (FIXED PRICE) (SEP 2019)
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER SOFTWARE
(MAR 2008)
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ) (AUG 2013)
SECTION D - PACKAGING AND MARKING
D.1 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN
2011)
SECTION E - INSPECTION AND ACCEPTANCE
SECTION E CLAUSES INCORPORATED BY REFERENCE
E.1 52.246-4 INSPECTION OF SERVICES - FIXED-PRICE (AUG 1996)
E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
E.3 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)
E.4 GSFC 52.246-93 ACCEPTANCE—LOCATION(S) (SEP 2013)
E.5 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
SECTION F - DELIVERIES OR PERFORMANCE
SECTION F CLAUSES INCORPORATED BY REFERENCE
F.1 52.242-15 STOP-WORK ORDER (AUG 1989)
F.2 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
F.3 52.247-34 F.O.B. DESTINATION (JAN 1991)
F.4 GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)
F.5 GSFC 52.237-92 PLACE OF PERFORMANCE – SERVICES (NOV 2013)
F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION G CLAUSES INCORPORATED BY REFERENCE
G.1 52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEP 2019)
G.2 1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)
G.3 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.4 1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY (AUG 2015)16
G.5 1852.227-70 NEW TECHNOLOGY- OTHER THAN A SMALL BUSINESS FIRM OR
NONPROFIT ORGANIZATION (APR 2015) (Not Applicable Where The Place Of Performance Is Outside The United States)
G.6 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT
REPRESENTATIVE (APR 2015) (Not Applicable Where The Place Of Performance Is Outside The United States)
G.7 1852.227-85 INVENTION REPORTING AND RIGHTS- FOREIGN (APR 2015) (Only applies when work is to be performed outside the United States by contractors that are not domestic firms)
G.8 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
G.9 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)
G.10 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS (JAN 2017)
G.11 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR
52.245-1 (JAN 2011)
G.12 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS (DEC 2014)
G.13 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA PROPERTY IN
THE CUSTODY OF CONTRACTORS (JUN 2019)
G.14 ORDERING PROCEDURES
G.15 NSN SERVICES ON-RAMPING
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION H CLAUSES INCORPORATED BY REFERENCE
H.1 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)
H.2 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002) – ALT I (FEB 2006)27
H.3 1852.228-76 CROSS-WAIVER OF LIABILITY FOR INTERNATIONAL SPACE STATION
ACTIVITIES (OCT 2012)
H.4 1852.225-70 EXPORT LICENSES (FEB 2000)
H.5 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989)
H.6 [RESERVED]
H.7 GSFC 52.219-90 SMALL BUSINESS SUBCONTRACTING PLAN AND REPORTS (NOV 2016)
H.8 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA – SPECIAL WORKS (MAR 2008)30
H.9 GSFC 52.227-99 RIGHTS IN DATA (NOV 2018)
H.10 SUBCATEGORY 2.2 CAPABILITY VALIDATION TASK ORDERS - ORDERING
PROCESS AND FIRM FIXED PRICES
H.11 PERFORMANCE-BASED PAYMENTS/REDUCTIONS MATRIX
SECTION I - CONTRACT CLAUSES
SECTION I CLAUSES INCORPORATED BY REFERENCE
I.1 52.202-1 DEFINITIONS (JUN 2020)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN
2020)
I.5 52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (JUN 2020)
I.9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)
I.10 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
I.11 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
I.12 52.204-2 SECURITY REQUIREMENTS (MAR 2021)
I.13 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT
PAPER (MAY 2011)
I.14 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
I.15 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
I.16 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-
DELIVERY CONTRACTS (OCT 2016)
I.17 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG
2020)
I.18 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
I.19 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (NOV 2021)
I.20 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING
WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV
2021)
I.21 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
I.22 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (NOV 2015)
I.23 52.210-1 MARKET RESEARCH (NOV 2021)
I.24 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
I.25 52.215-2 AUDIT AND RECORDS – NEGOTIATION (JUN 2020)
I.26 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997)
I.27 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA –
MODIFICATIONS (JUN 2020)
I.28 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
I.29 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT
BENEFITS (PRB) OTHER THAN PENSIONS (JUL 2005)
I.30 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
I.31 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR OTHER
THAN CERTIFIED COST OR PRICING DATA – MODIFICATIONS (NOV 2021)
I.32 52.217-2 CANCELLATION UNDER MULTIYEAR CONTRACTS (OCT 1997)
I.33 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
I.34 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL
BUSINESS CONCERNS (OCT 2022)
I.35 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2022)
I.36 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)
I.37 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (SEP 2021)
I.38 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT
2022)
I.39 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I.40 52.222-3 CONVICT LABOR (JUN 2003)
I.41 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.42 52.222-26 EQUAL OPPORTUNITY (SEP 2016)
I.43 52.222-29 NOTIFICATION OF VISA DENIAL (APR 2015)
I.44 52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
I.45 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
I.46 52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
I.47 52.222-53 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR
STANDARDS TO CONTRACTS FOR CERTAIN SERVICES - REQUIREMENTS (MAY 2014) 48
I.48 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)
I.49 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.50 52-223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING (JUN 2020)
I.51 52.225-1 BUY AMERICAN ACT – SUPPLIES (OCT 2022)
I.52 52.225-8 DUTY-FREE ENTRY (OCT 2010)
I.53 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
I.54 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
I.55 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (JUN 2020)
I.56 52.227-11 PATENT RIGHTS—OWNERSHIP BY THE CONTRACTOR (MAY 2014) AS
MODIFIED BY NFS 1852.227-11 (APR 2015)
I.57 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.58 52.229-6 TAXES—FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
I.59 52.232-1 PAYMENTS (APR 1984)
I.60 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I.61 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)
I.62 52.232-11 EXTRAS (APR 1984)
I.63 52.232-17 INTEREST (MAY 2014)
I.64 52.232-18 AVAILABILITY OF FUNDS (APR 1984)
I.65 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.66 52.232-25 PROMPT PAYMENT (JAN 2017)
I.67 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
I.68 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
I.69 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (NOV 2021)
I.70 52.233-1 DISPUTES (MAY 2014) - ALTERNATE I (DEC 1991)
I.71 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.72 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.73 52.237-3 CONTINUITY OF SERVICES (JAN 1991)
I.74 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
I.75 52.242-13 BANKRUPTCY (JUL 1995)
I.76 52.243-1 CHANGES - FIXED-PRICE (AUG 1987) – ALTERNATE I (APR 1984)
I.77 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (OCT 2022)
I.78 52.245-1 GOVERNMENT PROPERTY (SEP 2021)
I.79 52.245-9 USE AND CHARGES (APR 2012)
I.80 52.246-25 LIMITATION OF LIABILITY – SERVICES (FEB 1997)
I.81 52.246-26 REPORTING NONCONFORMING ITEMS (NOV 2021)
I.82 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012)
I.83 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
I.84 52.251-1 GOVERNMENT SUPPLY SOURCES (APR 2012)
I.85 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.86 1852.203-70 DISPLAY OF INSPECTOR GENERAL HOTLINE POSTERS (JUN 2001)
I.87 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(AUG 2014)
I.88 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION
TECHNOLOGY RESOURCES (JAN 2011)
I.89 1852.215-84 OMBUDSMAN (NOV 2011)
I.90 1852.219-75 INDIVIDUAL SUBCONTRACTING REPORTS (APR 2015)
I.91 1852.219-77 NASA MENTOR- PROTÉGÉ PROGRAM (APR 2015)
I.92 1852.219-79 MENTOR REQUIREMENTS AND EVALUATION (APR 2015)
I.93 1852.223-74 DRUG-AND ALCOHOL-FREE WORKFORCE (NOV 2015)
I.94 1852.237-72 ACCESS TO SENSITIVE INFORMATION (JUN 2005)
I.95 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.96 1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION (APR 2001)
I.97 52.204-1 APPROVAL OF CONTRACT (DEC 1989)
I.98 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS (NOV 2021)
I.99 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA – MODIFICATIONS
(JUN 2020)
I.100 52.216-18 ORDERING (AUG 2020)
I.101 52.216-19 ORDER LIMITATIONS (OCT 1995)
I.102 52.216-22 INDEFINITE QUANTITY (OCT 1995)
I.103 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
I.104 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
I.105 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) 57
I.106 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
I.107 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014)—ALTERNATE II (DEC 2007) AND
ALTERNATE III (DEC 2007) as modified by NASA FAR SUPPLEMENT 1852.227-14 (APR 2015)60
I.108 1852.204-75 SECURITY CLASSIFICATION REQUIREMENTS (SEP 1989)
I.109 52.227-17 RIGHTS IN DATA-SPECIAL WORKS (DEC 2007)
I.110 [RESERVED]
I.111 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.112 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
I.113 1852.216-80 TASK ORDERING PROCEDURE (OCT 1996) -- ALTERNATE II (APR 2018)71
I.114 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (DEVIATION) (FEB
2012)
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)
Near Space Network Services
RFP #80GSFC22R0029
SECTION B - SUPPLIES OR SERVICES AND PRICES
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is $ To Be Negotiated Under Each Task Order.
(End of clause)
B.2 SUPPLIES AND/OR SERVICES TO BE PROVIDED
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the services in accordance with the Statement of Work (SOW) incorporated in Section J as Exhibit A and in accordance with task orders issued in accordance with I.113, TASK ORDERING
PROCEDURE.
Except as otherwise provided in this contract, the price of data to be furnished or of data to be delivered under the authority of other sections (clauses/statement of work) are included in the price of this contract.
A. Contract Line Item Numbers (CLINs)
CLIN DESCRIPTION Ordering Period Contract IDIQ
Maximum Value 0001 Base Period: The Government will order services for SOW Category 1 under this CLIN by issuance of Firm Fixed Price Task Orders pursuant to Task Ordering Procedures (NFS 1852.216-80).
5 years
0001 and 0002
$584,897,500
(Maximum Value) 0002 Base Period: The Government will order services for SOW Category 2 under this CLIN by issuance of Firm Fixed Price Task Orders pursuant to Task Ordering
1001 Option Period One: The Government will order services for SOW Category 1 under this CLIN by issuance of Firm Fixed Price Task Orders pursuant to Task Ordering
1001 and 1002
$4,235,102,500
(Maximum Value)
1002 Option Period One: The Government will order services for SOW Category 2 under this CLIN by issuance of Firm Fixed Price Task Orders pursuant to Task Ordering Procedures (NFS 1852.216-80).
This is a multiple award contract and NASA anticipates ordering no more than this total maximum amount under all the contracts combined during the ordering period of the contract.
B. Deliverables, Not Separately Priced
Description Reference Schedule Delivery Method/ Addressee(s)
Services and Deliverables in accordance with Attachment A, SOW Category 1 and Task Orders Issued
As Defined in Attachment A, SOW and Task Orders Issued
As Defined in Attachment A, SOW and Task Orders Issued
As Defined in Attachment A, SOW and Task Orders Issued
Services and Deliverables in accordance with Attachment A, SOW Category 2 and Task Orders Issued
As Defined in Attachment A, SOW and Task Orders Issued
As Defined in Attachment A, SOW and Task Orders Issued
As Defined in Attachment A, SOW and Task Orders Issued
Task Plans Section I
NFS 1852.216-80
As Required in Clause
NFS 1852.216-80
NASA Task Order Management System (TOMS)
Reports of Work Section C
GSFC 52.235-90
As Required in Clause
GSFC 52.235-90
As specified in Clause GSFC 52.235-90
Organizational Conflicts of Interest (OCI) Plan
NFS 1852.237-72 If Addendum required, to be submitted with the Task Order Proposal
Electronic Format/CO
Reporting of Inventions
Section G
NFS 1852.227-
70; Section G
NFS 1852.227-
72;
Section I
FAR 52.227-11
(This clause only applies to small business firms or
Interim Reports Every 12 Months (or sooner to preserve Patent Rights) and Final Report within 3 Months after Contract Completion
(Required at the Task Order (TO) Level)
Electronic or Hard Copy Format/New Technology Representative or Patent Representative nonprofit organizations.)
Reporting of Inventions - Foreign
Section G 1852.227-85 (This clause only applies when work is to be performed outside the United States by contractors that are not domestic firms.)
Prompt reporting to the Contracting Officer of each invention made in the performance of work under this contract. Final report due upon completion of the contract work and prior to final payment.
(Required at the TO Level)
Electronic or Hard Copy Format to Contracting Officer.
Financial Report of NASA Property in the Custody of Contractors (NF 1018)
Section G
NFS 1852.245-73
Annual Report by October 15th and Final Report
(Required at the TO Level, if applicable)
NF 1018 Electronic Submission System (NESS)
Supplemental Financial Report of NASA Property in the Custody of Contractors
Section G
GSFC 52.245-99
Monthly By the 21st of each Month and Final Report
(Required at the TO Level, if applicable)
Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov
Physical Inventory of Capital Personal Property Reporting
Section G
NFS 1852.245-78
Within 10 Days of Annual Physical Inventory
Property Administrator
Small Business Subcontracting Plan Reporting
(Does not apply to small businesses.
For all others, reporting only required at the TO level)
Section H
GSFC 52.219-90
Section I
NFS 1852.219-75
ISR–Semi-Annual (April 30th and October 30th) and Final SSR–Annual (October 30th)
Electronic Format/ Electronic Subcontract Reporting System (eSRS) http://www.esrs.gov
Safety & Health Reporting
Section H
NFS 1852.223-75
As required Electronic Format/CO
IT Security Management Plan
Section I
NFS 1852.204-76
30 Days after Contract Effective Date
Equal Opportunity Reports
Section I
FAR 52.222-26
As Specified by FAR 52.222-26
Electronic Format/CO & Code 120
Service Contract Reporting
Section I
FAR 52.204-15
Annually by October 31 and Revisions, if needed, by November https://www.sam.gov
Diversity, Equity, Inclusion and Accessibility (DEIA) Plan
NFS Appendix C- C-202.2 and Attachment H.1
30 Days after Contract Award and updated annually
NOTES: Unless otherwise specified, “day” means “calendar day”.
Except as otherwise provided in this contract, the cost of data to be furnished in response to the DRL attached to this contract or of data to be delivered under the authority of other sections (clauses/statement of work) are included in the price of this contract/Task order(s).
(End of clause)
B.3 GSFC 52.216-92 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES
(FIXED PRICE) (APR 2008)
(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is: (see below table).
Category Minimum Guarantee per Awarded Sub-Category (i.e., 1.1, 1.2, 1.3, 2.1, 2.2, 2.3)
Operational Services Minimum Guarantee* per Awarded Sub-Category (i.e., 1.1, 1.2, 1.3, 2.1, 2.2, 2.3) 1 “Near Space Direct to Earth
(DTE) Services”
1.1 $50,000 $45,000
1.2 $500,000 $250,000
1.3 $50,000 $45,000
2 “Near Space Relay Services”
2.1 $500,000 $120,000
2.2 $5,000,000 $50,000,000
2.3 $1,000,000 $120,000
*Operational services are only guaranteed upon successful completion and acceptance of all Capability Validation activities.
The maximum amount of supplies or services that may be ordered during the effective period of this contract is $584,897,500, which is inclusive of both Categories 1 and 2.
(b) All orders placed under this contract will be applied to the minimum and maximum specified above.
(End of clause)
B.4 SUPPLEMENTAL TASK ORDERING PROCEDURES
When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its proposed price required to perform the task order requirements. For unclassified task orders, the Contractor shall use only those appropriate contract price per minute rates, which may be less than but shall not exceed the rates found in Attachment B, to calculate the proposed price for all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract. For classified task orders or other mission unique task orders, the contractor shall prepare proposals based on its current price estimates, in accordance with the “Task Ordering Procedure” clause and the “Ordering Procedures” text of this contract.
This clause shall not apply to the Subcategory 2.2 Capability Validation task orders, for which procedures and pricing are specified in H.10.
(End of Text)
B.5 GSFC 52.217-90 OPTION TO EXTEND (SEP 2013)
In accordance with FAR clause 52.217-9, "Option to Extend the Term of the Contract" of this contract, the Contracting Officer may exercise the following option(s) by issuance of a unilateral contract modification. Options exercised shall be in accordance with the following:
Option Effective Ordering Period IDIQ Maximum
Five (5)* years commencing at the end of the base contract period for a total effective ordering period of ten (10)* years.
Increased by $4,235,102,500 for a Total
Maximum Limitation Amount of $4.82B.
* The ordering period start date will be based on the first awarded Category (either Category 1 or 2, whichever occurs first). For contracts under the last awarded Category (either Category 1 or 2, whichever occurs later), the effective ordering period will be adjusted to align with the contract end date for the first awarded Category.
The following clause only applies to Capability Validation and/or Mission Integration and Special Studies Task Orders:
B.6 GSFC 52.232-99 DELIVERY PAYMENT SCHEDULE (FIXED PRICE) (SEP 2019)
(a) Subject to other limitations and conditions specified in this contract, delivery payments shall be made to the Contractor upon delivery and acceptance of the items described under paragraph (b). Contractor is authorized to invoice at the unit price indicated and up to the quantity stated.
(b) The following payment schedule shall be used:
(c) The Contractor may submit requests for payment not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the Contracting Officer, all delivery - payments in any period for which payment is being requested shall be included in a single request, appropriately itemized and totaled.
(d) The Contractor shall not be entitled to payment of a request for delivery payment prior to successful accomplishment and acceptance of the item by the Government. The Contracting Officer shall determine whether the item for which payment is requested has been successfully accomplished and accepted by the Government in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the acceptable performance of the services provided or supplies delivered.
[END OF SECTION B]
Item No. Description Unit Qty Unit
Price Total Amount
TBD at the Task Order Level
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachments A; Organizational Conflict Of Interest (OCI) Data Requirements Description (DRD), Attachment C.1; OCI Plan, Attachment C.2; Diversity, Equity, Inclusion, and Accessibility (DEIA) Plan DRD, Attachment H.1; DEIA Plan, Attachment H.2; and Task Orders issued hereunder.
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER
SOFTWARE (MAR 2008)
In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following:
NONE
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ) (AUG 2013)
(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance.
Reports shall address the accomplishments and progress of all work performed under each Task Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.
(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed Task Order that summarizes the results of the entire Task Order, including conclusions based on the experience and results obtained. The Final Task Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order.
(c) Submission. The Contractor shall submit the reports required by this clause as follows:
Copies Report Type Addressee Mail Code
1 M,F Contracting Officer (CO) 176 1 M,F Contracting Officer's Representative (COR) 457 1 M,F Task Monitor See Task Order
[M=Monthly Report, F=Final Report]
(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order.
[END OF SECTION C]
SECTION D - PACKAGING AND MARKING
D.1 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
Goddard Space Flight Center Building 35, Code 279 Greenbelt, MD 20771
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
[END OF SECTION D]
SECTION E - INSPECTION AND ACCEPTANCE
SECTION E CLAUSES INCORPORATED BY REFERENCE
E.1 52.246-4 INSPECTION OF SERVICES - FIXED-PRICE (AUG 1996)
E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
The Contractor shall comply with either of the higher-level quality standard(s) listed below.
TITLE NUMBER DATE
ISO 9001 Q9001 2015
AS9100 AS9100D 2018
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require—
(i) Control of such things as design, work operations, in-process control, testing, and inspection;
or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
E.3 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS
(OCT 1988)
In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:
Item Quality Assurance Function Location
TBD To be specified at the TO level, where applicable. TBD
The following clause is applicable at the TO level:
E.4 GSFC 52.246-93 ACCEPTANCE—LOCATION(S) (SEP 2013)
The Contracting Officer or authorized representative will accomplish acceptance at the following location(s):
Deliverable Item No. Location Authorized Representative
TBD TBD TBD
The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.
If this is a fixed price type contract, acceptance shall be deemed to have occurred constructively- -for the sole purpose of computing an interest penalty that might be due the Contractor under the Prompt Payment Act--on the 7th day after the Contractor has delivered the supplies or services in accordance with the terms and conditions of the contract. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the date of the actual acceptance.
E.5 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract and the Task Order.
[END OF SECTION E]
SECTION F - DELIVERIES OR PERFORMANCE
SECTION F CLAUSES INCORPORATED BY REFERENCE
F.1 52.242-15 STOP-WORK ORDER (AUG 1989)
F.2 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
F.3 52.247-34 F.O.B. DESTINATION (JAN 1991)
F.4 GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)
The effective ordering period of this contract shall be for a period of 5* years from the contract effective date of TBD.
* The ordering period start date will be based on the first awarded Category (either Category 1 or 2, whichever occurs first). For contracts under the last awarded Category (either Category 1 or 2, whichever occurs later), the effective ordering period will be adjusted to align with the first Category award end date.
(End of clause)
F.5 GSFC 52.237-92 PLACE OF PERFORMANCE – SERVICES (NOV 2013)
The services to be performed under this contact shall be performed at the following location(s):
Contractor’s facility. Alternate places of performance may be specified in individual task orders issued.
F.6 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)
Shipments of the items required under this contract shall be to:
Receiving Officer Goddard Space Flight Center Building 35, Code 279 Greenbelt, Maryland 20771
Marked for:
Technical Officer: Camille Thurston, Code 457 Building: 12 Room: N223 Contract No.: TBD Item(s) No.: 0001, 0002, 1001, 1002, Reports of Work
Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.
If this is a fixed price type contract, delivery--for purposes of the Prompt Payment Act--must be through the above shipping address unless another location has been authorized by the Contracting Officer. If delivery is made to other than the Receiving Officer listed above and shipment to that other location has not been authorized by the Contracting Officer, a delivery for the purposes of the Prompt Payment Act has not occurred and no interest penalty under the Act shall result. Shipment to other than Receiving Officer listed above will be construed as contract noncompliance.
[END OF SECTION F]
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION G CLAUSES INCORPORATED BY REFERENCE
G.1 52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEP 2019)
G.2 1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)
G.3 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
G.4 1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY
(AUG 2015)
G.5 1852.227-70 NEW TECHNOLOGY- OTHER THAN A SMALL BUSINESS FIRM
OR NONPROFIT ORGANIZATION (APR 2015) (Not Applicable Where The Place Of Performance Is Outside The United States)
G.6 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND
PATENT REPRESENTATIVE (APR 2015) (Not Applicable Where The Place Of Performance Is Outside The United States)
G.7 1852.227-85 INVENTION REPORTING AND RIGHTS- FOREIGN (APR 2015) (Only applies when work is to be performed outside the United States by contractors that are not domestic firms)
G.8 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)
G.9 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR
2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:
https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this contract.
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices
(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
The following clause applies at the TO level:
G.10 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE
CUSTODY OF CONTRACTORS (JAN 2017)
(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by
NASA.
(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.
(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address:
Goddard Space Flight Center, Supply and Equipment Management Branch, Code 273, Greenbelt, MD 20771, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.
(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors' procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention.
Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period. Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.
(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the contractor has a value of $10 million or more, the contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.
(4) The Contracting Officer may, in NASA's interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.
(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.
G.11 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO
FAR 52.245-1 (JAN 2011)
For performance of work under this contract, the Government will make available Government property identified in orders awarded under this contract, if applicable, on a no-charge-for-use basis pursuant to the clause at FAR 52.245-1, Government Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at the contractor’s facility and at other location(s) as may be approved by the Contracting Officer.
Under FAR 52.245-1, the Contractor is accountable for the identified property.
Item Description
Acquisition Date
Acquisition Cost
Quantity If equipment
Manufacturer Model Serial Number
TO BE SPECIFIED IN EACH TASK ORDER, IF APPLICABLE
No Government furnished property will be provided at the master contract level. In the event that Government Property is furnished, it will be identified at the task order level.
G.12 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS (DEC 2014)
The following personnel are authorized to issue Task Orders under this contract. All designated personnel are employed by the Federal Government unless otherwise indicated:
Contracting Officer, Code 176
The following clause applies at the TO level, if applicable:
G.13 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA
PROPERTY IN THE CUSTODY OF CONTRACTORS (JUN 2019)
(a) In addition to the annual 1018 reporting required under clause NFS 1852.245-73 of this contract, the Contractor shall submit monthly property financial reports as described below if, at either award or any time during contract performance, the cumulative amount of NASA property is $10 million or more.
(1) Monthly property financial reports shall be submitted including item-level supporting data for all items acquired/fabricated/modified where the total acquisition cost of the item is $500,000 or more, in the contractor’s or its subcontractors’ possession. This data shall be submitted for all items in the property classifications of real property, equipment, special test equipment, special tooling, and agency peculiar property.
(2) Monthly data shall also be submitted for items of any acquisition cost in the classifications of materials and contract work-in-process (WIP). Specifically, itemized monthly data is required for materials and WIP line items when the estimated total acquisition cost of any item at completion will be $500,000 or more.
(b) The monthly reports shall be electronically submitted using the Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov using the format described in the CHATS user’s manual.
(c) Acquisition costs shall be developed using actual costs to the greatest extent possible, especially costs directly related to fabrication such as labor and materials. Supporting documentation shall be maintained and available for all amounts reported, including any amounts developed using estimating techniques.
(d) All adjustments shall be thoroughly explained and directly related to a specific Government Fiscal Year (GFY). If the GFY cannot be determined, the default shall be the previous GFY.
(e) Work Breakdown Structures (WBS) shall be provided for all Contractor acquired property (CAP), WIP, and any new materials acquired. The format shall be a five digit numerical level.
(i.e., 803-10). If the WBS is not identifiable, contact the NASA GSFC Property Office for further guidance, as provided in paragraph (f)(4) below.
(f)(1) The data required for the monthly submission is due the 21st day after the close of the month.
e.g., August 21 for the month ending July 31 September 21 for the month ending August 31 October 21 for the month ending September 30
(2) The monthly property financial reports required by this clause are separate from, and in addition to the annual NF 1018 reports.
(3) Both the NF 1018 report data and the September monthly report data are as of September 30.
Corrections in monthly report data shall be handled as adjustments in the next monthly report after discovery of the error. (e.g., Errors in the September monthly report shall be reported as adjustments in the October monthly report. The NF 1018 shall reflect the corrected numbers and the contractor shall provide a note regarding the corrected monthly report error under Comments in the NF 1018.) Errors in the NF1018 found after the November 30 submission shall be reported as adjustments in the NF 1018 for the next reporting year, unless immediate correction and resubmission are directed by NASA.
(4) Questions may be directed to the following individuals of the NASA GSFC Property Office:
Angela King, (301) 286-3543, email angela.c.king@nasa.gov Timothy Kelly (301) 286-8819, email: timothy.e.kelly@nasa.gov
G.14 ORDERING PROCEDURES
In accordance with FAR Subpart 16.505(b)(1), the Contracting Officer (CO) will give each NSN Services Contractor within a category a “fair opportunity to be considered” for each order in excess of the Simplified Acquisition Threshold, unless one of the conditions in 16.505(b)(2) applies. Procedures and selection factors to be considered for each Task Order (TO) providing for a “fair opportunity to be considered” are set forth below. The CO decision to issue a TO to a particular contract holder shall be based on the criteria stated below.
The Government reserves the right to issue a Request For Offer (RFO) for the delivery of the requirements under the NSN Services contract. The Government plans to issue task order awards without holding discussions with the Offerors. Therefore, the Offeror’s initial offer should contain the Offeror’s best terms. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Each task order solicitation will be a Request for Offer (RFO) and does not constitute authority to proceed or to incur any cost associated with contract performance. No legal liability shall reside on the part of the Government for any amount until a task order is signed by the Contracting Officer.
The following procedures define the process by which (a) Task Orders will be competed and (b) Task Orders will be awarded.
(a) Task Order Competition Procedures:
RFO Contents: When Contractor submission of proposals is necessary, the Government will issue an RFO.
(1) Each RFO will include the following information:
• Date of the RFO;
• Description, Task Order Statement of Work, and other documentation upon which the Task Order price is to be based;
• Delivery or performance date(s);
• Government Furnished Equipment, if applicable;
• Use of NASA facilities, if applicable;
• Specific instructions and the evaluation criteria that will be utilized for award of the Task Order and specific instructions regarding the level of detail contractors shall include in its offer for the Task Order.
• Funding profile, if applicable; and
• Due date for submission of Offer.
(2) Each RFO will require the following information be submitted:
(A) Past Performance
Each RFO may require specific Past Performance to be requested for the purpose of evaluating Past Performance.
(B) Small Business Subcontracting Plan
This applies ONLY to large businesses. (Applicable if the subcontracting possibilities are expected to exceed the threshold establish under FAR 19.702(a)(1), unless the contract, together with all of its subcontracts, will be performed entirely outside of the United States and its outlying areas.)
The contract includes FAR clause 52.219-9, “Small Business Subcontracting Plan and its Alternate II”. A Small Business Subcontracting Plan is not required at the Master Contract level. However, the following small business subcontracting goals have been established for Task Orders with a value of greater than $50M.
Small Disadvantaged Business 2.6% Women Owned 2.0% HUBZone 0.4% Veteran-Owned 1.3% Service-Disabled Veteran Owned 0.9%
Total Small Business
12.8%
(NOTE: FOR PURPOSES OF THE SUBCONTRACTING PLAN, THE PROPOSED
GOALS MUST BE STATED AS A PERCENT OF TOTAL SUBCONTRACTS, NOT
AS A PERCENT OF TASK ORDER VALUE)
These goals will be applicable to Task Orders awarded under the NSN Services contracts with a value of $50M or above. The contractor is encouraged to propose goals that are equivalent or greater than those recommended by the Contracting Officer. However, contractors should perform an independent assessment. The goals included in the submitted Subcontracting Plan for the Task Orders may be higher, lower, or the same as the goals stated above, depending upon the contractor’s independent assessment.
With regard to any goals stated above, contractors are advised that a proposal will not be rejected solely because the submitted Plan does not meet the NASA recommended goals.
For Task Orders with a value of between $750K to $50M, contractors will be required to submit a small business subcontracting plan with their own recommended goals based on their own independent assessment. The goals included in the submitted Subcontracting .Plan for the Task Orders may be higher, lower, or the same as the goals stated above, depending upon the contractor’s independent assessment.
(NOTE: FOR PURPOSES OF THE SUBCONTRACTING PLAN, THE PROPOSED
GOALS MUST BE STATED AS A PERCENT OF TOTAL SUBCONTRACTS, NOT
AS A PERCENT OF TASK ORDER VALUE)
(C) Government Property
The contract contains NASA FAR Supplement (NSF) provisions 1852.245-80, “Government Property Management Information” and 1852.245-81, “List of Available Government Property.” The first provision requires the submittal of certain information regarding the contractor’s Government property management procedures. The second provision requires.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .