North Wing HVAC Replacements ITB Addendum 1.pdf

PDF 105 KB Posted

Attached to
TVWD ITB 20260204 North Wing HVAC Replacements
Solicitation number
S-R34750-00015937
Issued by
Washington County, Barlow City, Oregon

About this file

This is an Invitation to Bid Addendum No. 1 for the Tualatin Valley Water District (TVWD) located in Beaverton, Oregon, within Washington County and Barlow City jurisdictions. The addendum modifies the original ITB issued February 4, 2026, for the North Wing HVAC Replacements project (Project No. C12640), which includes replacement of 13 rooftop air conditioning units, upgraded HVAC digital controls, minor HVAC alterations to the data room, and replacement of ceiling supply diffusers. The optional pre-bid conference will be held on February 10, 2026, at 11:00 a.m. in both virtual format via Microsoft Teams and in-person at TVWD's Headquarters (1850 SW 170th Ave, Beaverton, Oregon). Bidders requesting virtual attendance must email bidsandproposals@tvwd.org by 3:00 p.m. on February 9, 2026. In-person attendees will have the opportunity to conduct a site walk-through following the presentation; Owner staff will attempt to extend the Teams presentation to cover the walk-through, but technical transmission is not guaranteed and Owner reserves the right to discontinue virtual coverage if technical difficulties arise. Sealed bids are due February 18, 2026, by 2:00 p.m. with public opening and reading to follow on a conference call.

Qualified bidders must comply with Oregon Revised Statutes (ORS 279) public work requirements, provide a Statement of Bidder's Qualifications, confirm prevailing wage compliance, provide resident bidder status documentation, and demonstrate Oregon Construction Contractors Board registration. All bids must be accompanied by bid security equal to five percent of the bid amount as a certified check or bid bond, with First Tier Subcontractor Disclosure Forms submitted within two hours of bid closing and original bid security within five business days. The Engineer's estimate is $850,000. The District reserves the right to reject all non-compliant bids and award to the qualified lowest responsive and responsible bidder. No specific set-asides for disadvantaged enterprises are identified. The District intends to issue a Limited Notice to Proceed to order materials upon contract execution, with a Notice to Proceed date no later than June 1, 2026. Bid documents are available electronically through Bid Locker or in electronic or hard copy format from Plan Center Northwest.

View the file

Other files

File Type Posted
North Wing HVAC Replacements Advertisement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid Addendum No. 1 North Wing HVAC Replacements, Project No. C12640 v1.2 Page 1 of 1

TUALATIN VALLEY WATER DISTRICT

INVITATION TO BID FOR NORTH WING HVAC REPLACEMENTS, PROJECT NO. C12640

FIRST ADDENDUM

Tualatin Valley Water District’s (Owner) Invitation to Bid for North Wing HVAC Replacements, Project No. C12640 issued February 4, 2026 (ITB) is amended as follows.

This addendum must be acknowledged as indicated in the Instructions to Bidders. Failure to acknowledge this addendum may result in the bid being rejected as non-responsive. Any changes made by this addendum to the ITB documents will supersede the previous documents released, and all information and specifications not so changed will remain in full force. It is the responsibility of all bidders to conform to this addendum.

1. The optional Pre-Bid Conference will be held BOTH virtually and in-person beginning at 11:00 a.m., February 10, 2026. Virtual attendance will be via Microsoft Teams and a calendar invitation must be requested from bidsandproposals@tvwd.org by 3:00 p.m. on February 9, 2026. Those attending in-person at Owner’s Headquarters at 1850 SW 170th Ave, Beaverton, Oregon, will have the opportunity to follow up the presentation with a site walk-through. Owner staff will attempt to continue the Teams presentation for the walk-through but connection capabilities are not guaranteed and Owner is not responsible for any failure of video or audio transmission of the electronic site walk-through information and reserves the right to end the virtual presentation if there are technical difficulties. A secondary site-walk through is not planned. All references to the Pre-Bid Conference are deemed to reflect this date and location.

Except as modified in this Addendum, the ITB will remain in effect as originally written.

Dated February 6, 2026 mailto:bidsandproposals@tvwd.org

FIRST Addendum

File details come from the government source that posted it. Updated .