NOCXH6RI011_Amendment_One_Attachment_One.pdf

PDF 18 KB Posted

Attached to
Enhanced Defense Financial Management Training (EDFMT)
Solicitation number
NOCXH6RI011
Issued by

About this file

NOCXH6RI011 Amendment One Attachment One

View the file

Other files

File Type Posted
NOCXH6RI011_Amendment_One.pdf PDF
RFQ_NOCXH6RI011.pdf PDF
Redacted_J A_EDFMT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question

Page

RFQ Section or Paragraph Answer

There are four class dates of 1-4 Feb listed on the bottom of the proposed schedule of courses. Is this an obvious typo? Should this not read 1-5 Feb? 54 Appendix B

Yes, this is a typo and the dates for these four classes should read 2/1/16 - 2/5/16.

"The course, licensed and copyrighted by ASMC...shall be presented in an instructor-led format.....". For the past several years, and as is stated in the ASMC issued current license to deliver the EDFMT course, "there shall be two instructors present at all times" during the 40 hour course delivery. It has come to my attention that ASMC, DFAS, DOD Comptroller et al, have been in discussion to change the requirement for two instructors being present at all times to possibly one instructor to teach all five days solely, possibly one instructor teaching the first three days followed by another instructor teaching the final two days (as was the format in the first years of of this course), or some other combination of instructor led course structure. Obviously changing the number of or presence of the instructors will have a significant bearing on the cost of the delivery of the course. 44 Paragraph 1.0

Phara Rodrigue (Director of Certification for ASMC) confirmed that the ASMC requirement is that two instructors remain present at all times for an EDFMT course.

The RFQ states "The contractor shall provide each participant by mail, a certificate of completion within two (2) weeks of the course completion sate in accordance with Paragraph 3.9 of the SOW."

Section 3.9 states "Where possible, an electronic version of the completion certificate shall be delivered via email…" Please confirm electronic and print certificates are acceptable. 47 5.3

Yes, both electronic and print certificates are acceptable.

The RFQ states "At a minimum, this part shall address the quoter’s understanding of the requirement and its ability to meet all of the requirements set forth in the Statement of Work." Does this language pertain to past performance or technical? 3 Past Performance

This language pertains to past performance. Past Performance information will be evaluated to determine how similar or relevant past experience is to the current requirement and how well the quoter has performed such work, which demonstrates the quoter's ability to meet all the requirements set forth in the Statement of Work.

The RFQ states "Quoters should submit up to a maximum of 3 pages of past performance information for previous work experience on similar projects." Does the max of 3 pages include the contract references? 3 Past Performance

Yes, the three page limit includes the contract references.

NOCXH6RI011 Amendment One Attachment One

Page

RFQ Section or Paragraph Answer

NOCXH6RI011 Amendment One Attachment One

For the last contract period of three years, how many actual classes were delivered by the incumbent during the first year (based on the 80 estimate per year) per year. (Year 2, Year 3)? N/A N/A

To request additional information about HQ0423-13-P- 0002 please submit a request to the DFAS Freedom of Information Act (FOIA) Office at the following address:

Indianapolis FOIA/PA Program Manager 8899 East 56th Street Indianapolis, IN 46249-0150 Office: 317-212-4591 Fax: 317-212-8802

The link below contains additional information on the process for submitting a FOIA Request:

http://www.dfas.mil/foia/submitfoiarequest.html

With regards to SAM, our organization is registered and has completed the allowed documentation pertaining to our organization. As a matter of sound record-keeping and alignment with your RFQ, how should we acknowledge/submit any of the “clauses” which may not be required or available for completion in SAM? Or, if something is missing, can it be completed at a later date? N/A N/A

If one of the clauses in the RFQ is not completed in your SAM certification, you may submit a copy of the completed certification(s) with your quote.

Page

RFQ Section or Paragraph Answer

NOCXH6RI011 Amendment One Attachment One

How many personnel/role(s) (I.e., Program Manager, Logistics Coordinator, etc...) are expected or how many have the previous incumbents previously assigned to this contract? N/A N/A

It is the Contractor's responsibility to determine the personnel required to meet the requirements of the Statement of Work and quote accordingly. To request additional information about HQ0423-13-P-0002 please submit a request to the DFAS Freedom of Information Act (FOIA) Office at the following address:

Indianapolis FOIA/PA Program Manager 8899 East 56th Street Indianapolis, IN 46249-0150 Office: 317-212-4591 Fax: 317-212-8802

The link below contains additional information on the process for submitting a FOIA Request:

http://www.dfas.mil/foia/submitfoiarequest.html

Recognizing ASMC aims to update the courseware materials on an annual basis (Aug/Sept timeframe), what is your role/expectation in assisting the implementation of the new version upon release versus allowing for print/ship/training timelines. N/A N/A

The requirement for updating course materials is between ASMC and the vendor. The print/ship/training timelines remain the same.

Electronic Form of Evaluation – Please describe how this process works. Is this a form to be printed/shipped for each student attendee in class? Is the option of deploying an electronic evaluation in the form of a survey allowed? 45 Paragraph 3.8

Quoting SOW 3.8 "An electronic version of the evaluation form with questions acceptable to ASMC will be used at course end to assist in evaluation of the training. The contractor is responsible for coordinating the form with ASMC." The format of the form and the method must be coordinated with ASMC post award.

An electronic or physical copy must be provided to the COR and Program Manager within 3 weeks of course completion per the SOW.

Page

RFQ Section or Paragraph Answer

NOCXH6RI011 Amendment One Attachment One

Can you further explain the training requirements in accordance with current and future National Association of State Boards of Accountancy (NASBA) standards for Continuing Professional Education (CPE). Recognizing the location of these standards points to the main website – www.nasba.org – a clearer definition of this expectation would be appreciated as it’s difficult to identify exactly what is being referenced. 44 Paragraph 3.1

Please contact NASBA regarding their standards for Continuing Professional Education (CPE). EDFMT is currently approved by NASBA for 40 CPE's. The contact information below is also located on NASBA's website: (866) 627-cpe@nasba.org

12 When will all questions and answers be compiled and redistributed? N/A N/A

All questions and answers will be distributed by RFQ Amendment One, dated 7/24/2015, and will be posted to FBO.

File details come from the government source that posted it. Updated .