SOW_Appendix_E_SCWI-8715-0008.pdf

PDF 708 KB Posted

Attached to
Electric Monorail Hoist Federal contract opportunity
Solicitation number
NNS16574041Q
Issued by
National Aeronautics and Space Administration Stennis Space Center

About this file

SOW Appendix E - SCWI-8715-0008

View the file

Other files for this federal contract opportunity

Other files attached to Electric Monorail Hoist, newest first.
File Type Posted
Amendment_0002_signed.pdf PDF
Amendment_0001.pdf PDF
NNS16574041Q_-_Site_Visit.pdf PDF
NNS16574041Q_-_Request_For_Quote_(RFQ).pdf PDF
Attachment_5_Price_Schedule.xlsx XLSX spreadsheet
Attachment_1_Statement_of_Work_(SOW).pdf PDF
SOW_Appendix_B_SWI-8834-0001_Rev_5-3.pdf PDF
SOW_Appendix_A_NASA_STD_8719.9A.pdf PDF
Attachment_6_Wage_Determination_2005-2301_Rev_17.pdf PDF
Attachment_4_Past_Performance_Form.docx DOCX document
SOW_Appendix_D_200GD-GM04.pdf PDF
SOW_Appendix_C.1_Thru_C.4_Specs_for_20-Ton_Hoist.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Aeronautics and Space Administration John C. Stennis Space Center Stennis Space Center, MS 39529-6000

SCWI-8715-0008

Rev. F

March 2015

John C. Stennis Space Center

Construction Safety and Health Program

RELEASED - Printed documents may be obsolete; validate prior to use.

bcollymo Typewritten Text bcollymo Typewritten Text NNS16574041Q - Electric Monorail Hoist SOW Appendix E bcollymo Typewritten Text

Stennis

Common

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

Responsible Office: QA00/Safety and Mission Assurance Directorate

SUBJECT: Construction Safety and Health Program

Approved By:

Signature on File 03/12/15

Freddie Douglas III Date

Director, Safety and Mission Directorate

Document History Log

Status/Change/

Revision

Change

Date

Originator/

Phone Description

Basic 10/15/09

Mike Rewis/

8-2663

Initial release. Program reformatting and modification from SSP-8715-0001, Safety and Health Handbook. Introduction of a revised Contractor Qualification form and evaluation. Included all safety and health requirements formally stated in the

Contractor Specifications.

Rev A 10/15/10

Mike Rewis/

8-2663

Changes were made to: change the mishap category criteria; emphasize the need for

Construction Project Hazard Analysis to be approved before initiation of work; require a Traffic Control Plan in concert with the

Manual of Traffic Control Device

(MUTCD) for certain specific activities;

soils to be considered type C unless otherwise adjudicated; change the name from Greater New Orleans Industrial

Education Council (GNOIEC) to the Gulf

Coast Safety Council (GCSC); emphasize the need for Stennis Safety Orientation in addition to the Basic Orientation Plus, remove of Appendix A – Emergency

Numbers, owing to the rate of change of these numbers, (as well as the practice of handing the numbers out at the construction precons.). General admin changes.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

Revision

Change

Date

Originator/

Phone Description

Rev B 10/15/11

Mike Rewis/

8-2663

Changes were made to: Better define applicability; define documentation precedence; strike all references to “near miss”; better define the requirements for daily inspection, and add reference to a daily inspection form; better organize safety plan requirements; require high visibility apparel when working close to SSC thoroughfares; clarify requirements following an excavation related incident;

reference the use of vacuum excavator trucks; add a section on ladder safety; and define consultant.

Rev C R. Gargiulo/

8-3842

Modified Paragraph 9.3 to require high visibility shirt/vest/garments for construction crews. Added paragraph 9.32 sanitation requirements and 9.33 powered industrial trucks.

Rev D. 02/25/13 M. Rewis

Added to 9.25.2 Excavations that expose buried slip joint PVC pipes require the contractor to shore the buried pipe for the protection of the pipe from undermining and lateral movement.

Rev E. 11/22/13 M. Murray/

8-1402

Changes were made to the document to allow for agreement with OSHA’s final rule on the Globally Harmonized System of

Hazard Communication. Additionally, guidelines were added for the application of dedicated safety support on construction projects.

Rev E.1 04/22/14 K. Robinson 6.3.2.a clarified to say OSHA authorized trainer. Admin change

Rev F 11/21/14 M. Rewis

3.0, added reference to Heat Stress Work

Instruction; 4.3.8, added language requiring line level employees to participate in inspections; 4.7 added language requiring employees to follow manufacturer’s instructions; 6.7.2, added “Five Why’s” as a means to derive accident Root Causes; 6.7.4 added language requiring annual data rollup

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

Revision

Change

Date

Originator/

Phone Description for the Mishap Exposure Report; 9.5, added language clarifying fire watch duties;

9.16.1, added language requiring hazard assessment of roll off containers before human entry; 9.16.4, added language to prohibit the crushing of aerosol cans.

General change to “contracting officer’s representative from “contracting officer’s technical representative; 9.35 added Heat

Stress Prevention Section

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

Table of Contents

1.0 PURPOSE

2.0 APPLICABILITY

3.0 REFERENCES

4.0 ROLES AND RESPONSIBILITIES

4.1 NASA SSC Construction Contractors

4.2 NASA SSC Onsite Prime Contractors

4.3 Safety and Mission Assurance Directorate

4.4 Office of Center Operations

4.5 Project Contracting Officer’s Representative (COR)

4.6 Office of Procurement

4.7 All Employees

5.0 SELECTION AND ANALYSIS

5.1 Solicitation Bid

5.2 Analysis Process

5.3 Revision and Safety Plan (Post Award)

5.4 Disclaimer

6.0 MANAGEMENT AND OVERSIGHT

6.1 Management

6.2 Expectations

6.3 Minimum Construction Training Requirements

6.3.1 Employee SSC Orientation

6.3.2 Regulatory (Minimum Requirements)

6.3.3 Regulatory (Asbestos, Lead, PSM, Radiation)

6.4 Construction Project Hazard Analysis

6.4.1 Basic Requirements

6.4.2 Format

6.5 Activity Hazard Analysis

6.5.1 Basic Requirements

6.5.2 Format

6.6 Required Meetings

6.6.1 Preconstruction Meetings

6.6.2 Preparatory Meetings

6.6.3 Monthly Meetings

6.6.4 Weekly Meetings

6.6.5 Daily Stair Step Meeting

6.7 Mishap Reporting

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

6.7.1. Basic Mishap Reporting Requirements

6.7.2 Investigation Process

6.7.3 Close Call Investigations

6.7.4 Statistical Information and Reporting (Monthly Requirement)

6.8 Inspections

6.8.1 Daily Inspection

6.8.2 Construction Contractor Site Manager Weekly Inspection

6.8.3 Equipment Pre-Use Inspections

6.8.4 Action Tracking Systems

6.9 Activities Requiring a “Competent Person”

6.10 Medical Treatment

7.0 MEASUREMENT AND EVALUATION

7.1 Inspections

7. 2 Audits

7. 3 Post-Audit Actions

8.0 SAFETY AND HEALTH PROVISIONS

8.1 Contractor's General Safety and Health Plan

8.2 Plan Contents

8.2.1 Compliance, Enforcement and Disciplinary Action

8.2.2 Subcontractor Safety and Health Plans

8.2.3 Changes to Safety and Health Plans

9.0 SPECIFIC REQUIREMENTS OVERVIEW

9.1 Lockout/Tagout

9.2 Confined Space Entry

9.3 Personal Protective Equipment

9.4 Fire Prevention and Protection

9.5 Welding, Cutting and Melting

9.6 Use of Explosives

9.7 Electrical Safety

9.8 Outside Areas

9.9 Fall Protection

9.10 High Noise Level Protection

9.11 Hazard Communication

9.12 Safety Data Sheets (SDS)

9.13 Severe Storm Plan

9.14 Exposure Monitoring

9.15 Spill Prevention and Response

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

9.16 Waste Management, Recycling, and Sustainable Acquisition

9.16.1 Hazardous Waste Disposal

9.16.2 Solid Waste Disposal

9.16.3 Universal Waste

9.16.4 Painting Operations Waste

9.16.5 Recycling

9.16.6 Sustainable Acquisition

9.17 Storm Water Pollution Prevention and Permitting (SWPPP)

9.18 Wastewater Disposal

9.19 PCB Management

9.20 Removal of Equipment or Systems Containing Chlorofluorocarbons (CFC)

9.21 Cranes

9.22 Building Modifications within Occupied Facilities

9.22.1 General Requirements

9.22.1 Specific Requirements

9.23 Safety in Concrete and Masonry Construction

9.23.1 General Requirements

9.23.2 Specific Requirements – Concrete Finishing Equipment

9.23.3 Specific Requirements for Cast-in-Place Concrete

9.24 Diving/Underwater Work

9.24.1 General Requirements

9.24.2 Specific Requirements

9.25 Excavation and Trenching

9.25.1 General Requirements

9.25.2 Excavation

9.26 Pile Driving Operations

9.26.1 Responsibilities

9.26.2 General Requirements

9.27 Safety Requirements Related to Roofing Jobs at SSC

9.28 Scaffolding

9.29 Steel Erection

9.30 Earth Drilling Operations

9.31 Ladder Safety

9.32 Sanitation

9.33 Powered Industrial Trucks

9.34 Barricades

9.35 Heat Stress Prevention

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

10.0 Records and Forms

Appendix A – Definitions

Appendix B - Acronyms and Abbreviations

Tables

Table 1 - Diving/Underwater Work Less Than 33 Feet in Depth

Table 2 - Diving/Underwater Work Over 33 Feet in Depth

Figures

Figure 1. SSC LO/TO Tag (Form SSC-808)

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

1.0 PURPOSE

This John C. Stennis Space Center (SSC) Common Work Instruction (SCWI) communicates and specifies the requirements of the National Aeronautics and Space Administration (NASA) SSC

Construction Safety and Health Program.

This SCWI is to be used in conjunction with all Federal, State, and local safety and health regulations applicable to a contractor’s scope of work.

2.0 APPLICABILITY

1. This SCWI shall be applicable to all construction contractors and subcontractors.

2. This SCWI shall be applicable to onsite prime contractors that perform construction-type work or other work as specified within this document.

3. This SCWI is applicable to service contractors of all tiers engaged in construction-type activities.

4. This SCWI shall not be applicable to consultants (performing non-construction-type activities), third-party establishments, such as utility and municipal services, and visitors (to include, delivery vehicle drivers).

3.0 REFERENCES

The following publications form a part of these specifications to the extent indicated by their references. The exclusion of a publication from this section shall not relieve the contractor from complying with the publication reference elsewhere. All references are assumed to be the latest version unless otherwise indicated.

1. American National Standard Institute ANSI B 15.1-1958, Safety Code for Mechanical Power

Transmission Apparatus

2. 14 CFR, Aeronautics and Space

3. 29 CFR 1904, Occupational Injury and Illness Recording and Reporting Requirements

4. 29 CFR 1910, Occupational Safety and Health Standards

5. 29 CFR 1926, Safety and Health Regulations for Construction

6. 40 CFR 7, Nondiscrimination in Programs or Activities Receiving Federal Assistance from the Environmental Protection Agency

7. 40 CFR 82, Protection of Stratospheric Ozone

8. 40 CFR 112, Oil Pollution Prevention

9. 40 CFR 122, The National Pollutant Discharge Elimination System

10. 40 CFR 257, Criteria for Classification of Solid Waste Disposal Facilities and Practices

11. 40 CFR 258, Criteria for Municipal Solid Waste Landfills

12. 40 CFR 261, Identification and Listing of Hazardous Waste

13. 40 CFR 273, Standards for Universal Waste Management

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

14. 40 CFR 761, Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in

Commerce, and Use Prohibitions

15. 40 CFR 763, Asbestos

16. 43 CFR 7, Protection of Archaelogical Resources

17. Manual on Uniform Traffic Control Devices (MUTCD)

18. NFPA 70E National Electrical Code

19. NPR 8621.1, NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping

20. NPR 8715.3, NASA General Safety Program Requirements

21. SPR 8715.1, Safety and Health Program Requirements

22. SPR 1400.1, Document Preparation, Numbering, and Management

23. SPR 1440.1, Records Management Program Requirements

24. SSP-8715-0001, Safety and Health Handbook

25. SSP-1740-0057, Flammable Liquid Storage Cabinets

26. ANSI B15.1-1958, Safety Standard for Mechanical Power Transmission Apparatus

27. E.O. 13423, Strengthening Federal Environmental, Energy, and Transportation Management

28. NFPA 70E, Standard for Electrical Safety in the Workplace

29. SSTD-8070-0119-MISC, Standard for Dig Permit

30. SCWI-8500-0004, Hazardous Materials, Hazardous Waste and Solid Waste Plan

31. SCWI-1800-0005, Hazard Communication

32. SCWI-8500-0019-ENV, Asbestos Hazard Control Plan

33. SCWI-8500-0020-ENV, Integrated Contingency Plan

34. SCWI-8715-0003, Fall Protection Program

35. SCWI-8715-0004, Confined Space Entry Program

36. SCWI-8715-0005, Safety, Health, Housekeeping and Essential Item Inspections

37. SCWI-8715-0006, Electrical Safety Program

38. SCWI-8715-0010, Process Safety Management Program

39. SCWI-8715-0012, Work in Hazard Classification Areas

40. SCWI-8715-0013, Control of Hazardous Energy Lockout/Tagout and Non-

Service/Maintenance Hazardous Energy Isolation

41. SCWI-8715-0014 Heat Stress Program

42. SWI-8834-0001, Lifting Devices and Equipment Management Instructions

43. SOI-8080-0040, Test Area Access Control

44. U.S. Environmental Protection Office. 1976. Resource Conservation and Recovery Act. 42

U.S.C. §6901 et seq.

https://ssctdstennis.ssc.nasa.gov/smweb/dtsisapi.dll?FIELD1=SM_DOC_NUMBER&TEXT1=SCWI-8715-0014&JOIN1TO2=AND&FIELD2=SM_TEXT&TEXT2=&JOIN2TO3=AND&FIELD3=SM_TEXT&TEXT3=&MAX_RESULTS=100&LAYUP=standard

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

4.0 ROLES AND RESPONSIBILITIES

4.1 NASA SSC Construction Contractors

Construction contractors at SSC shall:

1. Understand and comply with the requirements and expectations of the NASA SSC

Construction Safety and Health Program, which is required under NASA SSC SPR 8715.1.

2. Understand the construction related elements of the Occupational Safety and Health

Administration (OSHA) Voluntary Protection Program (VPP).

3. Maintain safety and health programs to a level where OSHA compliance responsibilities are achieved and not compromised.

4. Provide the NASA SSC Safety and Mission Assurance (SMA) Directorate all required documentation requested in the NASA SSC Contract Specifications.

5. Address safety and health findings in a timely manner and meet target dates set by NASA

SSC.

6. Ensure at least one (1) employee is trained in the Mishap Investigation Board Orientation

(posted to the Construction Safety Site at http://constructionsafety.ssc.nasa.gov/) per contract. This course shall be taken within five (5) working days after being named to perform or support an accident investigation.

7. Manage all subcontractors in a manner consistent with this NASA SSC SCWI.

8. Audit/inspect contractor activities for safety and health compliance at least weekly throughout the duration of the work. During the weekly audits/inspections include representative workers/craftsmen from each prime and subcontractor on the construction site/project. (Line level personnel will be required to participate in weekly inspections, to promote hazard recognition and reporting. During these sessions, employees will be asked about the use of new tools or PPE that might help them do their job safer and easier.)

9. Implement the safety and health provisions of this specification so that:

a. All employees involved in a project go home as healthy as they arrived.

b. The construction work site is free of recognizable hazards as well as OSHA and NASA violations. In cases of conflicting statements between the OSHA and NASA Standards, the contractor shall follow the more stringent of the conflicting statements.

c. Mishaps are minimized to the greatest extent possible with the ultimate goal of zero.

4.2 NASA SSC Onsite Prime Contractors

NASA SSC Onsite Prime contractors shall:

1. Comply with the applicable sections of this SCWI when employees or their contractors engage in construction type work as identified in 29 CFR 1926.

2. Establish effective selection and evaluation systems for contractors of all tiers that perform construction type work.

http://constructionsafety.ssc.nasa.gov/

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

3. Ensure that contractor employees have the appropriate background and orientation training specified in this SCWI.

4. Perform weekly inspections of construction contractors or construction type work performed and complete corrective actions–suspend the job until all OSHA compliance or imminent danger findings are effectively corrected or mitigated.

5. Ensure that at least one (1) supervisory employee per contractor is trained in the course

“Intro to Mishap Investigations” per contract. This course shall be taken within five (5) working days after being named to perform or support an accident investigation.

6. Maintain safety and health programs to a level where OSHA compliance responsibilities are achieved and not compromised.

7. Manage all subcontractors in a manner consistent with NASA SSC and with this SCWI.

4.3 Safety and Mission Assurance Directorate

SMA shall:

1. Update and maintain this SCWI in accordance with SPR 1400.1.

2. Ensure compliance with applicable sections of NPR 8715.3.

3. Evaluate and make recommendations on applying construction safety and health programs to be used during the contractor selection process.

4. Provide the Contracting Officer (CO) with useful evaluation data and facts that can be used to assist in the selection of contractors.

5. Provide feedback to selected contractors on their performance concerning safety and health requirements.

6. Identify actions necessary to improve the safety and health programs or plans prior to starting work onsite.

7. Assure the appropriate mishap and close call reporting investigating and evaluation criteria are incorporated into contracts.

8. Meet requirements of NPR 8621.1, section 1.4.23, regarding Mishap Investigations.

9. Audit/inspect contractor activities for safety and health compliance at least weekly throughout the duration of the work. During the weekly audits/inspections, include representative workers/craftsmen from each prime and subcontractor on the construction site/project. (Line level personnel will be required to participate in weekly inspections, to promote hazard recognition and reporting. During these sessions, employees will be asked about the use of new tools or PPE that might help them do their job safer and easier.)

10. Measure and evaluate contractor performance and compliance.

11. Maintain an action tracking system for follow-up and recordkeeping purposes.

12. Develop annual contractor safety and health goals to promote continuous improvement.

13. Maintain the SSC Construction Safety Web Site at http://constructionsafety.ssc.nasa.gov/

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

4.4 Office of Center Operations

The NASA SSC Center Operations Directorate Environmental Lead shall:

1. Participate with SMA in performing a thorough evaluation of construction contractor safety and health evaluations.

2. Assist in the audit of construction contractor activities when necessary to evaluate safety and health compliance.

3. Maintain an action tracking system for followup and recordkeeping purposes.

4.5 Project Contracting Officer’s Representative (COR)

The NASA SSC Contracting Officer’s Representative shall:

1. Obtain all necessary safety and health evaluation information and facts for inclusion in the contractor selection process.

2. Ensure safety and health evaluation results are given emphasis in the selection of a contractor.

3. Meet requirements of NPR 8621.1, section 1.4.29, regarding Mishap Investigations.

4. Provide appropriate follow-up actions acceptable to NASA SMA Directorate and Center

Operations Directorate Environmental Management Staff for any modifications or additional requirements that vary from the original contract scope of work.

4.6 Office of Procurement

The Office of Procurement shall:

1. Ensure compliance with applicable sections of NPR 8715.3.

2. Ensure contract compliance with contract terms and conditions for NASA SSC safety and health policies and procedures.

3. Serve as the primary contact for resolution of contractual issues concerning safety and health requirements.

4. Participate in the Configuration Control Board (CCB) for construction.

4.7 All Employees

All employees shall:

1. Use the “Close Call” process to report safety and health violations and risks involving observed actions of contractors.

2. Stay away from construction areas and be cognizant of tags, signs, barricades, and other postings, unless granted proper authority and Personal Protective Equipment (PPE).

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

3. Follow all safety and health requirements necessary to complete a job safely.

4. Report injuries and illnesses immediately to their respective supervisor.

5. Follow manufacturer’s requirements and/or instructions on the proper storage, inspection and use of equipment, fall protection (active and passive), products, tools, and personal protective equipment.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

5.0 SELECTION AND ANALYSIS

NASA SSC is dedicated to the OSHA VPP. This dedication will manifest itself in compliance with OSHA regulations and safety and health management systems that will result in discovery of deficiencies and an expectation of safety success. Activities or conditions that may be acceptable in other organizations may not be acceptable at NASA SSC. It is imperative, and in the best interest of the contractor, to read and understand this SCWI and the associated requirements prior to the start of any projects.

1. NASA SSC shall maintain a comprehensive review process that all contractors are required to undergo regardless of the type of contract. The extent of each analysis is dependent upon the scope of work, type of activities, and risks involved. To facilitate the process, NASA

SMA shall utilize form SSC-882 to record the review of each construction contractor’s solicitation submittals and present those findings to the NASA Office of Procurement.

2. At NASA SSC, construction contractors that hire subcontractors shall maintain an equally effective selection and analysis process. This includes, but is not limited to, the use of Safety and Health specifications, review of injury/illness statistics, and training.

3. Prior to completing a solicitation bid, the contractor shall obtain:

a. A copy of this SCWI.

b. Specific NASA SSC SCWIs as applicable through the NASA SSC Construction Safety

Web page at http://constructionsafety.ssc.nasa.gov.

4. The process used to select and analyze contractors by Onsite Prime Contractors shall be as effective as the NASA SSC process.

5.1 Solicitation Bid

At the time of solicitation, the following information shall be submitted to the Procurement

Office for review by NASA SSC SMA:

1. All requested documents identified within the Safety and Health Specifications.

2. All related documents listed in the NASA SSC Safety and Health Specifications under SD-01

(Preapproval Submittals), SD-03 (Product Data), SD-07 (Certificates), and SD-11 (Closeout

Submittals).

5.2 Analysis Process

NASA SSC uses an evaluation process to determine the status and condition of a contractor’s safety and health program. The results of the evaluation help NASA SSC ascertain if the contractor has an acceptable understanding of managing an effective safety and health program.

1. The SSC SMA Directorate shall review all the specification submittals by the contractor to determine if the correct information was submitted and what, if any, deficiencies exist. A

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020 rating system will be utilized to rank the contractor’s safety and health program along with other performance metrics. This information is forwarded to the Contracting Officer on form

SSC-882 (Contractor Safety and Health Evaluation).

2. All contractors shall be required to submit safety and health information listed in the specifications.

3. After a contractor has been awarded a contract, revision of their safety and health program may still be necessary to ensure a state of readiness for the project. This requirement is also applicable to all contractors. See Section 5.3.

4. The contractor shall make all reasonable changes to meet NASA and OSHA requirements. It is expected that the revised actions strengthen the overall injury and illness prevention effort for the current project and any future work.

5.3 Revision and Safety Plan (Post Award)

1. When necessary, NASA SSC SMA will request additional work by the contractor to address program deficiencies, OSHA noncompliance, or critical improvements deemed necessary for the project. During this period, the contractor can schedule a meeting with SMA to clarify expectations. When the contractor believes they have addressed the critical deficiencies, they can request a second analysis by NASA SSC SMA.

2. Safety and health “revision” requirements shall be achieved to the satisfaction of SMA before a contractor is allowed to work in the field or mobilize onsite.

5.4 Disclaimer

NASA SSC SMA is not responsible for regulatory compliance and other safety and health deficiencies that are not disclosed or discovered, or that are misunderstood, during the evaluation process. It is the responsibility of the contractor to read and understand all of the safety and health policies and procedures provided, and to fully understand and comply with applicable governmental regulations related to their business and the project. NASA will not be liable to reimburse or increase funding to cover expenses incurred by discoveries of noncompliance or unforeseen and/or misunderstood compliance responsibilities of the contractor.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

6.0 MANAGEMENT AND OVERSIGHT

SPR 8715.1 provides the management and oversight structure for contracts issued to contractors performing work at NASA SSC. This structure defines the role of the Contracting Officer (CO), COR, SMA, and the contractor.

6.1 Management

1. NASA SSC, onsite prime contractors, and construction contractors shall manage their contractors so that safety and health accountability is maintained and contractor employees are provided the same level of protection as NASA civil service employees.

2. Construction contractors shall use this SCWI as the primary document to reference NASA

SSC requirements. Depending upon the type of contract, construction contractors may also be asked to reference other NASA SSC safety and health work instructions that are applicable to their type of work.

3. All contractors shall understand the OSHA requirements applicable to the work being performed and all OSHA regulatory requirements, as well as, performance standards that are incorporated by reference, applicable to their business.

4. Where NASA SSC takes a more stringent position on compliance or safety and health practice, the contractor is expected to achieve equivalent compliance to remain in good standing.

5. The SMA Directorate shall assign individuals to be responsible for construction safety.

NASA SSC SMA may utilize the services of outside consultants to assist in auditing and program development.

6. Contractors shall provide a management and oversight process to all of their subcontractors so that regulatory compliance is achieved and injury/illness performance goals are exceeded.

7. At all times during performance of a construction contract and until the work is completed and accepted, the Contractor shall assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the

Contractor.

6.2 Expectations

1. The contractor shall take all necessary safety and health measures in performing under the contract and its specifications and shall submit all required documents.

2. The contractor shall be subject and adhere to:

a. All applicable Federal, State, and local laws, regulations, ordinances, codes, and orders relating to safety and health in effect on the date of the contract.

b. Compliance with safety and health standards, specifications, issuances, reporting requirements, and provisions in SPR 8715.1 and in this SCWI. The contractor may be

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020 required to comply with additional, specific NASA SSC safety and health work instructions as applicable.

3. During the performance of work under a contract, the contractor shall comply with prescribed procedures for the control and safety of persons visiting the project site. The contractor is responsible for protecting personnel and for familiarizing each subcontractor with safety and health requirements.

4. The contractor shall advise the CO or designee of any special safety restrictions established so that government personnel can be notified of these restrictions.

5. The CO or designee will notify the contractor formally in writing of any noncompliance with the provisions of this work instruction and will specify corrective action to be taken. Further, the contractor shall take other such safety and health measures as directed by the CO.

6. The contractor shall immediately take corrective action after receipt of notice from the CO or designee concerning any noncompliance.

7. If the contractor fails or refuses to institute prompt corrective action in accordance with the above, the CO may invoke the provisions of the clause in the contract entitled "Stop Work," or may invoke whatever other rights are available to the Government under the terms and conditions of this contract or at common law to remedy such failure or refusal to institute prompt corrective action.

8. The contractor shall ensure authorized Government representatives of the CO have access to examine the sites or areas where work under this contract is being performed to determine the adequacy of the contractor's safety and health measures.

9. Corrective actions shall immediately be implemented and documented in writing by the prescribed target dates resulting from investigation, inspection, audit, and/or close call reports.

10. The contractor shall maintain copies of the following so they are onsite and readily available for review by all employees, subcontractors, the CO, and the Government’s safety and health representatives:

a. The contractor’s general safety and health plan.

b. Revised sections of the safety and health plan.

c. Each subcontractor's safety and health plans, permits, Safety Data Sheets (SDS), OSHA regulations (29 CFR 1910 and 1926), and other safety and health program documents.

11. The contractor shall ensure:

a. Each new employee receives safety and health orientation specific to the construction site prior to starting assigned work activities on that site.

b. All employees are initially and regularly trained in job safety and health.

c. All employees that demonstrate unsafe work practices or have returned to the construction site after an extended period receives a refresher training/orientation.

d. All training shall be documented and copies filed on the construction site for review.

12. The contractor’s personnel shall attend all OSHA required safety and health training applicable to the project/task/work.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

13. All employees and subcontractors have the authority and responsibility to stop any work, job, or process that is judged to be immediately dangerous to life and health (IDLH).

6.3 Minimum Construction Training Requirements

6.3.1 Employee SSC Orientation

1. All construction project managers, superintendents, supervisors (i.e., foremen, crew chiefs), and construction employees shall complete the Basic Orientation Plus program presented by the Gulf Coast Safety Council (GCSC). This program can be attended at any of the twenty-six (26) Safety Councils throughout the United States that are associated with the GCSC.

Contact with the council can be made at http://gulfcoastsafetycouncil.com.

2. If it is not possible to attend the GCSC Basic Orientation program, an equivalent program shall be required (i.e., OSHA ten (10) hour for contractor employees and thirty (30) hour training for Managers, Supervisors, and Safety and Health professionals). In addition to the above Basic Orientation Plus, all contractor employees, regardless of position, are required to participate in the NASA SSC Safety and Health Orientation. This orientation can be provided by the GCSC or through the NASA SSC project coordinator. Exception: NASA onsite prime contractor employees are excluded from this requirement.

3. All contractor and subcontractor employees shall receive this orientation training prior to starting work. Documentation of the orientation must be available at the job site for auditing.

4. Access control requirements for SSC Propulsion test facilities and test support areas require that prior to working in A, B or E test facilities, personnel must also complete a safety orientation for that facility. Each facility safety orientation is approximately one hour in duration and is provided at no expense to the contractor employees. These orientations will be coordinated through the construction project COR or designee. Upon completion of the orientation, a test complex badge shall be issued by NASA Security or designees and must be worn at all times, unless prevented by safety concerns. For more information on test complex access and training, refer to SOI-8080-0400 (SSC Test Access Control).

6.3.2 Regulatory (Minimum Requirements)

1. Contractors shall maintain evidence that additional applicable OSHA required training and task specific training has been completed prior to working on the jobsite. The ability to provide this information to show compliance with this section must be presented upon request. Acceptable evidence of training includes any or all of the following:

a. Current (within two (2) years) OSHA card showing course topic signed by an OSHA authorized trainer.

b. Current (within two (2) years) attendance records for training performed by a qualified representative of the contractor.

c. Current (within two (2) years) attendance records for training performed by a qualified third-party organization/person.

http://gulfcoastsafetycouncil.com/

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

2. Training records shall include the subject, date, length of training, instructor, course name, and outline of the training.

3. OSHA training frequencies shall be maintained.

4. Where unspecified by OSHA, the contractor shall establish training frequency and maintain necessary documentation.

6.3.3 Regulatory (Asbestos, Lead, PSM, Radiation)

1. Portions of several buildings located at SSC contain asbestos spray-applied insulation on the underside of the roof structure, in intermediate floors, in mechanical equipment rooms, and in many piping/duct systems. Work performed in these areas that involves the removal of ceiling tiles and/or work in these ceiling spaces must be performed in accordance with asbestos work requirements established in SCWI-8500-0019-ENV and 40 CFR 763. Any disturbance of these insulating systems must be performed in accordance with SCWI-8500-

0019-ENV and applicable regulatory requirements. If work in, adjacent to, or involving any of these insulating systems/areas should become necessary as part of the performance of this contract, notify the CO for prior clearance and to verify whether asbestos is involved.

2. The contractor shall submit documents showing that employees performing any OSHA Class

I, Class II, or Class III asbestos work at NASA SSC have a current medical examination and a current respirator fit test.

3. The contractor shall submit documents showing that employees who perform asbestos abatement activities, such as management planners, project designers, inspectors, contractors, supervisors, workers, and air monitors, are trained to the requirements of the OSHA Asbestos

Standard, 29 CFR 1926.1101, and certified by the Mississippi Department of Environmental

Quality (MDEQ).

4. Safe work practices must be utilized when conducting work on lead-based materials.

Contractors are required to comply with 29 CFR 1910.1025 and 29 CFR 1926.62. The contractor shall submit documents showing that employees performing work involving lead-containing materials are trained to the requirements of the OSHA Lead Standards, have a current respirator fit test, and hold a valid certificate from the Commission on Environmental

Quality.

5. Training documentation shall be submitted to the CO for review prior to start of any lead or asbestos abatement work.

6. Documentation of asbestos training, lead abatement training, and all other required safety and health training shall be maintained onsite by the contractor and be made available for review by the CO.

7. Contractor employees who will be working in Process Safety Management (PSM) covered processes shall comply with the applicable sections of SCWI-8715-0010, Process Safety

Management and undergo PSM overview training, which is available by the responsible

NASA SSC onsite prime contractor.

8. Contractors who work in PSM covered areas are also subject to the requirements of SCWI-

8715-0012, Work in Hazard Classification Areas.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

9. Individuals performing source radiography must have a radiography license issued or recognized by the State of Mississippi to perform such work at the SSC. The contractor’s work plan and Radiation Safety Program will be reviewed and approved by the Facility

Operating Services Contractor (FOSC) Non Destructive Evaluations Assistant Radiation

Safety Officer. Construction engineering companies may also use portable density gauges containing radiation sources, usually Cesium-137, Americium-241, or Radium-226. The latter two (2) radioisotopes may be combined with beryllium metal, resulting in a neutron-emitting source that could be used for measuring moisture density in a material such as soil.

Gauge users are required to have a radioactive materials license issued or recognized by the

Nuclear Regulatory Commission of the State of Mississippi. The construction contractor is responsible for the safe use and storage of the density gauge. When not in use, the device should be secured in an area away from heavy equipment to minimize the chance of a construction vehicle accidentally crushing or damaging the shielding such that the source becomes exposed or dislodged.

10. Contractors using Type III and IV construction lasers shall have established written procedures that address:

a. Restriction of laser use to “qualified” persons.

b. The methods undertaken to minimize direct eye potential (e.g., verifying beam path prior to firing, consideration of beam termination, not positioning at eye level, prohibiting intentional direct viewing).

c. Prohibited times of use (i.e., dusk or night).

11. The contractor’s laser-use procedure shall be included in the safety plan written for the involved construction task. The contractor should also provide the OSHA-required proof of qualification for their construction laser operator(s) with the proposed safety plan.

6.4 Construction Project Hazard Analysis

6.4.1 Basic Requirements

1. A Construction Project Hazard Analysis (CPHA) shall be completed and approved by the

COR (or designee) prior to any work commencing on all projects.

2. The CPHA shall include details on the specific scope of work under the contract and shall be revised and resubmitted whenever conditions change (e.g., job scope). The CPHA is not to replace the daily AHA, as defined below.

3. The CPHA shall be included in the contractor’s Safety and Health Plan for review and acceptance by the contractor’s designated safety and health professional.

6.4.2 Format

1. The CPHA shall conform to Form SSC-853, SSC Construction Project Hazard Analysis.

2. If another form of CPHA is used, it shall contain the following information:

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

a. Name of contractor or subcontractor conducting construction activities.

b. General description of construction activity (e.g., pile-driving, pouring foundation, structural assembly of building).

c. Description of the task and basic job steps.

d. Date of Project Hazard Analysis.

a. Location of construction activity (e.g., Stennis Space Center (Project) Area).

b. Estimated start date of construction activities at SSC.

c. Numerical identification for each phase of work.

d. Description of each phase of work associated with each individual position (e.g., arc welding, electric hand tools, acetylene and oxygen cutting, painting, fuel-powered hand tools, compressed air, excavation, and backfill).

e. Description of all of the hazards to which the employee or other employees in the area are exposed for each phase of work (e.g., flammability, falls from heights, fumes, paint spills, electric shock, maintenance of the leads).

f. Description of the precautionary action taken to ensure the identified hazard does not cause an accident; for example:

(a). Storing hazardous material in well-ventilated area free from excessive heat, sparks, open flames, or direct rays of the sun.

(b). Inspecting electrical cord before use and using ground fault circuit interrupter.

(c). Storing excavated material and retaining it at least two (2) feet 600 mm from the edge of the excavation and at a distance to prevent excessive loading on the face of the excavation.

g. Contractor/subcontractor signature.

6.5 Activity Hazard Analysis

6.5.1 Basic Requirements

1. An Activity Hazard Analysis (AHA) shall be completed prior to commencement of daily work activities.

2. Specific safety and health measures necessary to mitigate hazards identified by the AHA shall be documented on the AHA form.

3. All construction workers shall review and sign off on the AHA before task initiation.

4. The AHA shall be updated as conditions or the job scope change.

6.5.2 Format

1. The AHA shall conform to Form SSC-814.

2. If another form of Activity Hazard Analysis is used, it shall contain the following information:

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

a. Name of contractor or subcontractor conducting construction activities

b. Date of Activity Hazard Analysis

c. A definable feature of work/description of construction activity (e.g., pile-driving, pouring foundation, structural assembly of building)

d. Description of the task and basic job steps

e. Description of the potential hazards and corrective actions to be taken

f. Responsibility of the person(s) who will take corrective action

g. Location of construction activity (e.g., Stennis Space Center (Project) Area)

h. Estimated start date of construction activities at SSC

i. Identification for each definable feature of work

j. Permits required, Fire Protection precautions, PPE required

k. Barricades needed, Electrical Hazards identified, Work Platforms required

l. Emergency procedures

m. Each contractor/subcontractors’ employee signature

n. Special instructions

6.6 Required Meetings

6.6.1 Preconstruction Meetings

Preconstruction meetings will be held by the Office of Procurement to review all necessary information related to the project, including safety and health plans.

6.6.2 Preparatory Meetings

1. The contractor shall meet with their subcontractors prior to the project start date to discuss safety and health plans/procedures and implementation. Discussions will include hazard assessments, AHA, procedures, training, permits, emergencies, and other requirements.

2. Occasionally either party may call subsequent conferences/meetings to confirm mutual understandings, to discuss changes to the contractor’s safety and health plans, and/or to address deficiencies in the safety and health program or procedures, any of which require corrective action. Minutes of these meetings and action plans shall be recorded. All Safety and Health Program changes need to be submitted in writing using the NASA SSC transmittal process for acceptance by the SSC SMA Construction Safety Manager.

6.6.3 Monthly Meetings

1. The project superintendent or equivalent, and a designated safety representative is required to attend a mandatory safety meeting held on the first Thursday of each month. These meetings will be used to address various safety topics.

2. The project superintendent or designated safety representative shall ensure attendance is documented.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

3. Location of these monthly meetings will be communicated during the preconstruction meeting process.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

6.6.4 Weekly Meetings

1. Construction contractor management shall support safety program initiatives. The contractor shall meet with their employees on a weekly basis to discuss all applicable safety and health lessons learned, challenges for the coming week, audit findings, and any other pertinent safety and health topics and issues.

2. Attendance of these meetings will be taken and records maintained for NASA SSC review.

Attendance forms should at least contain the names, date, meeting topic, and leader’s name.

6.6.5 Daily Stair Step Meeting

1. Communication from management to the employees performing the work is critical to safety and health. Therefore, NASA SSC will require the use of a “Stair Step” method of communication. This communication starts with the contractor management and ends with the contractor’s employees and subcontractor employees.

2. Construction and subcontractor management shall hold daily meetings to discuss the safety and health issues related to the day’s activities. This discussion is encouraged as the starting point of business/project meetings. This is a perfect forum to discuss and review the daily

Activity Hazard Analyses for that day.

3. The results of the daily meeting and critical communication shall be stepped forward to supervision and construction employees during the Daily Safety and Health Review

(“toolbox”) meetings. These toolbox talks should focus on topics that relate to work activities or safety observations and concerns.

4. Each work crew shall conduct Daily Safety and Health Review meetings. These toolbox type meetings shall be held before the start of each crew’s work shift activities or before the start of a new task/activity during a work shift.

5. Toolbox meetings shall be led by the work activity/craft supervisor, foreman, or crew chief and include:

a. Communication from daily management meetings that is pertinent to safety and health

b. Basic job steps for the task/activity

c. Potential hazards and corrective actions for each job step

d. AHA reminders

e. Coordination between multiple activities and organizations.

f. Precautions, permits, PPE, barricades, energy isolation, work platforms, and abatements necessary for the activity

g. Other pertinent topics and issues

6. An attendance form shall be used to document attendees and action items from these meetings. Attendance forms should contain the names, date, meeting topic and leaders name at a minimum.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

6.7 Mishap Reporting

6.7.1. Basic Mishap Reporting Requirements

1. The contractor shall immediately report by telephone, to the NASA SSC point of contact, the

CO, and SMA Construction Safety all mishaps (accidents or incidents) including any spill or release of oil or hazardous substance that fall into the following categories:

a. Type A - Mishaps causing an occupational injury or illness that resulted in a fatality or permanent total disability and/or damage to equipment or property equal to or greater than $2 million.

b. Type B - Mishaps causing permanent partial disability, or resulting in hospitalization for inpatient care of three or more people within thirty (30) workdays of the mishap, or damage to equipment or property equal to or greater than $500,000 but less than $2 million.

c. Type C - Mishaps causing a nonfatal occupational injury or illness that result in days away from work, restricted work, or transfer to another job not including the day or shift in which it occurred, or hospitalization for inpatient care of one (1) or two (2) people within thirty (30) workdays of the mishap, or damage to equipment or property equal to or greater than $50,000 but less than $500,000.

d. Type D - Mishaps causing any nonfatal OSHA recordable occupational injury or illness that does not meet the definition of a Type C, or damage to equipment or property greater than $20,000 but less than $50,000.

e. Mission Failure - Any event that prevents the accomplishment of a majority of the primary mission objectives.

2. Immediately after any incident, the contractor shall notify the NASA SSC SMA

Construction Safety Manager, the Contracting Officer and Security.

3. Within twenty-four (24) hours, the contractor will complete NASA SSC Form 1627 (NASA

Mishap Report). This report is required to be submitted via email or fax to the appropriate configuration coordinator, the Contracting Officer and the SMA Directorate.

4. Written documentation of corrective action is required to be submitted within ten (10) days of the mishap, and the CO and SSC SMA shall be given a copy of the report.

5. Instructions for completion of the NASA Form 1627 are printed on the reverse of the form.

Blocks 1–22, 27–28, and 33 shall be filed with the CO within twenty-four (24) hours of the mishap.

6.7.2 Investigation Process

All mishaps associated with NASA SSC contracts are required to be investigated in accordance with the procedures outlined in NPR 8621.1. The purpose is to assess the causes and develop measures to prevent the incident from occurring again on that construction project as well as across the SSC site. Accident investigation is not for the purpose of assessing blame or fault.

The following section defines the basic expectations.

Work

Instruction

SCWI-8715-0008 Rev F Number Rev.1

Effective Date: March 17, 2015

Expiration Date: March 17, 2020

1. Immediately following the incident, the area shall be…

This is the start of the file's text. The full file is on GovTribe.