About this file

Enclosure 3

View the file

Other files for this federal contract opportunity

Other files attached to Facilities Construction Engineering and Technical Services, newest first.
File Type Posted
FaCETS_III_Final_RFP_NNG16557109R_Section_B-M.pdf PDF
FaCETS_III_Final_RFP_NNG16557109R_Section_B-M.pdf PDF
Amendment_5.pdf PDF
Appendix_3.pdf PDF
Amendment_4_doc.pdf PDF
ATTACHMENT_R_IDIQ_Fixed_Price_Rate_Matrix__Revised_9-27-16_(001).pdf PDF
Appendix_5.pdf PDF
Appendix_7.pdf PDF
ATTACHMENT_R_IDIQ_Fixed_Price_Rate_Matrix__Revised_9-20-16_(001).pdf PDF
EXHIBIT_9_FaCETS_III_RTO_1_for_M_S__Revised_7-1-16.pdf PDF
Exhibts_1-8_FaCETS_III_Core-IDIQ_Price_Exhibits_for_Final_RFP__.pdf PDF
Attachment_B_-_FaCETS_III_Construction_Specifications_November_2015.pdf PDF
ATTACHMENT_R_IDIQ_Fixed_Price_Rate_Matrix__Revised_7-1-16_(003).pdf PDF
ATTACHMENT_B_Construction_Specifications.pdf PDF
Summary_of_Changes_Between_Draft_RFP_Documents_and_Final_RFP_Documents.pdf PDF
ATTACHMENT_E_Contract_Historical_Data_Attachment.pdf PDF
ATTACHMENT_O_PMC_Plan.pdf PDF
ATTACHMENT_H_MD58.pdf PDF
ATTACHMENT_K_DD_254.pdf PDF
ATTACHMENT_N_Small_Business_Sub_Plan.pdf PDF
Attachment_C_-_List_of_Installation-Accountable_Government_Property_February_2016.pdf PDF
FaCETS_III_Final_RFP_NNG16557109R_Section_B-M.pdf PDF
Final_RFP_Cover_letter.pdf PDF
Revised_Attachment_A_-_FaCETS_III_Statement_of_Work_March_2016.pdf PDF
ATTACHMENT_D_PIV_PROCEDURES.pdf PDF
EXHIBITS_1-9_Core-IDIQ_Price_without_RTO_1.pdf PDF
ATTACHMENT_I_SC4281.pdf PDF
ATTACHMENT_Q_IT_Security_Mgt_Plan_COVER_PAGE.pdf PDF
ENCLOSURE_2_QASP_Example.pdf PDF
ATTACHMENT_N_Small_Business_Sub_Plan.pdf PDF
ENCLOSURE_1_IT_Security_Management_Plan_Template.pdf PDF
ATTACHMENT_K_DD_254.pdf PDF
ATTACHMENT_Q_IT_Security_Mgt_Plan_COVER_PAGE.pdf PDF
ATTACHMENT_F_MD15.pdf PDF
ATTACHMENT_L_IT_Security_ADL__JUL_2016_.pdf PDF
APPENDIX_5.pdf PDF
FaCETS_III_DRFP_Section_A_SF_33.pdf PDF
APPENDIX_4_BIM_SCOPE.pdf PDF
ENCLOSURE_2_QASP_Example.pdf PDF
ATTACHMENT_B_Construction_Specifications.pdf PDF
APPENDIX_3_CADD_MANUAL.pdf PDF
ATTACHMENT_H_MD58.pdf PDF
Enclosure_4_RTO_2_SOW.pdf PDF
FaCETS_III_DRFP_COVER_LETTER.pdf PDF
APPENDIX_6.pdf PDF
EXHIBIT_1-8_FaCETS_III_Core-IDIQ_Price_Exhibits_for_DRFP_without_RTO_1.pdf PDF
ATTACHMENT_D_PIV_PROCEDURES.pdf PDF
EXHIBIT_9_FaCETS_III_RTO_1_for_M_S.pdf PDF
ATTACHMENT_I_SC4281.pdf PDF
ATTACHMENT_O_PMC_Plan.pdf PDF
Show all 50

Facilities Construction Engineering and Technical Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facility Management Division Scope of Work

Engineering Branch Design-Bid-Build/Construction Only & Design-Build/Full Design

Date: 12/2/2015 Page 1 of 2

Work Request No.: Representative Task Order #1

Title: GSFC Building 011, Room S137 Restroom Modifications

Project Type: Design-Bid-Build/Construction Only

Design-Build/Full Design

Attachments: None

GENERAL:

Currently, there are insufficient Women’s restroom facilities on the first floor of Building

011. To remedy this, the existing Room S137 men’s restroom facilities are to be converted to men’s and women’s restroom facilities.

SCOPE OF WORK:

The Contractor shall furnish all labor, equipment, materials, and associated services necessary to perform the following in accordance with the Scope of Work and Sketches 1 and 2 depicted below:

1. Remove existing locker room entrance door and men’s restroom doors (see Sketch 1).

2. Install wall and doors to create a vestibule area with access to the men’s locker room and the new women’s restroom (see Sketch 2).

3. Provide lighting fixtures and LED exit sign in the new vestibule area.

4. Remove lavatories (5), urinals (3), water closets (4), stall partitions, appurtenances, and associated hardware (4), and fluorescent electrical lighting fixtures (4) from existing men’s restroom.

5. Install a wall in the existing men’s restroom to create a new women’s restroom.

a. Men’s restroom shall have at least one urinal and two water closets.

b. Women’s restroom shall be a single occupant water closet.

6. Upgrade both restrooms to meet ADA requirements.

7. Remove or relocate existing light fixtures, as needed (see Sketch 2). Install LED exit sign in men’s locker room.

8. Install wall mounted lighting fixtures in both restrooms (on the wet wall over the toilet fixtures). Install a ceiling mounted smoke detector in each restroom.

9. Inspect condition of the restroom exhaust system.

10. Replace exhaust air grills in both restrooms.

Facility Management Division Scope of Work

Engineering Branch Design-Bid-Build/Construction Only & Design-Build/Full Design

Date: 12/2/2015 Page 2 of 2

11. Install new floor tiles on existing in both new restrooms (locker room does not require new tiles).

NOTE: All work shall be accomplished in accordance with GSFC FaCETS III

Construction and Architect-Engineer specifications.

Bldg. 011, Room S137, New Layout

Sketch 2

Bldg. 011, Room S137, Existing Layout

Sketch 1

New Vestibule Area

Remove lavatories (5), urinals (3), water closets (4), stall partitions, appurtenances, and associated hardware (4), and fluorescent electrical lighting fixtures (4) from existing men’s restroom.

Existing fluorescent light fixtures, relocate as needed to accommodate installation of the new wall.

Existing fluorescent light fixtures, relocate as needed to accommodate installation of the new vestibule area and associated renovations.

File details come from the government source that posted it. Updated .