Other files attached to Repair Research Aircraft Integration Facility Mechanical Systems, newest first.
File Type Posted
Questions_and_Answers.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Site_Visit_Presentation.pptx PPTX presentation
Sign-in_sheet.pdf PDF
Attachment_3_-_Drawings_pg_57-113.pdf PDF
Attachment_6_-_AFRC_form_10735 _Visit_Request_-_U.S._Citizens.pdf PDF
Attachment_1_-_Specifications.pdf PDF
NND16568486E_Solicitation.pdf PDF
Attachment_2_-_Addendum__1_to_the_Specifications.pdf PDF
Attachment_3_-_Drawings_pg_1-56.pdf PDF
Attachment_4_-_General_Decision_Number_CA160031.pdf PDF
Attachment_5_-_Record_of_Environmental_Considerations.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EDM1720 NASA RAIF - Edwards - CA Final on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.4 CONTRACT DRAWINGS

Drawings and documents that accompany this specification are a part thereof, and are listed in section 00 01 15 List of Drawings.

Digital drawings and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished. The Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

1.5 CONSTRUCTION SCHEDULE AND PERIOD OF PERFORMANCE

Within the contract period of performance of calendar days, including the base bid and all options, the Contractor shall commence and complete the work in phases including all required submittals.

Liquidated damages (LDs) will be assessed for Contractor delays per calendar day.

The following reflects the number of calendar days that will be allowed for construction activities. Items marked with an asterisk reflect Secondary Scope/Option items which may or may not be awarded. If awarded, performance of awarded optional work shall run concurrent with Primary Scope/Base Bid work.

Activity Calendar Days Duration

NTP 0

Mobilization 21

Construction (Primary Scope AND Secondary Scope as awarded)

Demobilization 14

Total

1.6 WORK HOURS

The building will be occupied during the entire performance period of work under this Contract. Construction work performed on the roof, within the Central Plant (Room 158), and within unoccupied mechanical/utility rooms may be performed during "Normal Duty Hours". All construction work

SECTION 01 11 00 Page 8