Draft_Request_For_Proposals.docx
DOCX document 214 KB Posted
- Attached to
- Glenn Engineering and Research Support (GEARS) Federal contract opportunity
- Solicitation number
- NNC16ZL009R
About this file
This is a sources sought notice from the National Aeronautics and Space Administration Glenn Research Center seeking capability statements from businesses for the Glenn Engineering and Research Support acquisition. The acquisition is a combination of two current contracts and has an estimated potential value of $300 million over five years, or potentially longer. It provides engineering and research services across various disciplines including communications, power, materials, systems engineering, and propulsion. Responses are due by June 1, 2016 and should include company information, capabilities statement, and recommendations to improve incentives and lessons learned from similar efforts. The notice seeks this information for planning purposes and no solicitation currently exists.
GEARS Draft Request for Proposals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NNC16ZL009R,_Amendment_3_package.zip | ZIP file | |
| NNC16ZL009R,_Amendment_2_package.zip | ZIP file | |
| NNC16ZL009R_GEARS_Final_RFP_Amendment_1.pdf | ||
| NNC16ZL009R_Request_for_Proposals,_with_attachments.zip | ZIP file | |
| GEARS_Industry_Day_slides.pdf | ||
| Cognizant_Audit_Office_Template.xlsx | XLSX spreadsheet | |
| GEARS_Cost_Summary_Template.xlsx | XLSX spreadsheet | |
| Sources_sought_respondents.pdf | ||
| Business_Systems_Reviews_and_Status_Information_Template.xlsx | XLSX spreadsheet | |
| GEARS_SOW_Draft.docx | DOCX document | |
| Industry_Day_attendees.pdf | ||
| Draft_Request_For_Proposals.docx | DOCX document | |
| GEARS_SOW_Draft.docx | DOCX document | |
| dRFP_cover_letter.docx | DOCX document | |
| Industry_Day_information_and_registration_form.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 52.232-18 AVAILABILITY OF FUNDS. (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
(End of clause)
B.2 1852.216-74 ESTIMATED COST AND FIXED FEE. (DEC 1991)
The estimated cost of this contract is TBD exclusive of the fixed fee of TBD. The total estimated cost and fixed fee is TBD.
| Phase-in Fixed Price |
| Estimated Cost |
| Fixed Fee |
| IDIQ Costs |
| IDIQ Fee |
Phase-in
Base Period (36-months)
Option 1 (24 months)
**CY 6**
**CY 7**
**CY 8**
**CY 9**
**CY 10**
Total
Note: The Government has requested a deviation to FAR 17.204(e) which limits the period of performance of contracts to five years. The deviation has not yet been approved by NASA Headquarters.
(End of clause)
B.3 SUPPLIES AND/OR SERVICES TO BE PROVIDED
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Description/Specifications/Statement of Work incorporated as Attachment J-1 – STATEMENT OF WORK FOR GLENN ENGINEERING AND RESEARCH SUPPORT.
(End of clause)
B.4 1852.232-81 CONTRACT FUNDING (JUN 1990)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $ .
(b) An additional amount of $ is obligated under this contract for payment of fee.
(End of clause)
END OF SECTION B
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 The contractor shall provide the item or services specified in Section B in accordance with the Statement of Work entitled STATEMENT OF WORK FOR GLENN ENGINEERING AND RESEARCH SERVICES dated September 14, 2016 and incorporated in Attachment J-1.
END OF SECTION C
SECTION D - PACKAGING AND MARKING
D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION. (SEP 2005)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
grc-contracts@mail.nasa.gov
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
(End of clause)
D.3 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
(a) The Contractor shall submit any changes to standards and practices used for management and control of Government property under this contract to the assigned property administrator prior to making the change whenever the change —
(1) Employs a standard that allows increase in thresholds or changes the timing for reporting loss, damage, or destruction of property;
(2) Alters physical inventory timing or procedures;
(3) Alters recordkeeping practices;
(4) Alters practices for recording the transport or delivery of Government property; or
(5) Alters practices for disposition of Government property.
(End of clause)
D.4 CLAUSES INCORPORATED BY REFERENCE -- SECTION D
Clause(s) D.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of clause)
END OF SECTION D
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT. (APR 1984)
E.2 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT. (APR 2015)
(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows: 1
(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement 1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.
(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.
(End of clause)
E.1 CLAUSES INCORPORATED BY REFERENCE -- SECTION E
Clause(s) E.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of clause)
END OF SECTION E
SECTION F - DELIVERIES AND PERFORMANCE
F.1 52.242-15 STOP-WORK ORDER. (AUG 1989)
F.2 52.242-15 STOP-WORK ORDER. (AUG 1989) - ALTERNATE I (APR 1984)
F.3 PERIOD OF PERFORMANCE
The period of performance of this contract is from October 1, 2017 to September 30, 20xx.
[The NASA Glenn Research Center has requested a deviation from FAR 17.204(e) and NFS 1817.204(e), which limit the total basic and option periods of contracts to five years. The deviation, if granted, would make the total period of performance >5 years]
(End of clause)
F.4 PLACE OF PERFORMANCE - SERVICES
The services to be performed under this contact shall be performed at the following location(s): NASA Glenn Research Center at Lewis Field; NASA Glenn Research Center at Plum Brook Station; and the Contractor’s Facility.
(End of clause)
F.5 CLAUSES INCORPORATED BY REFERENCE -- SECTION F
Clause(s) F.1 through F.2 at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of clause)
END OF SECTION F
SECTION G - CONTRACT ADMINISTRATION DATA
1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE. (APR 2015)
1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES. (DEC 1988)
1852.216-75 PAYMENT OF FIXED FEE. (DEC 1988)
The fixed fee shall be paid in monthly installments based upon the percentage of completion of work as determined by the Contracting Officer.
(End of clause)
1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (SEP 2016)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at:
FMD Accounts Payable Bldg. 1111, Jerry Hlass Road Stennis Space Center, MS 39529
(b) Except for classified vouchers, the Contractor shall submit all vouchers electronically using the steps described at NSSC’s Vendor Payment information web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods designated in the payment clause(s) contained in this contract will begin on the date a proper request for payment is received by the NSSC payment office specified in paragraph (b) of this section. Vouchers shall be prepared in accordance with the guidance provided by the NSSC at the following website: https://answers.nssc.nasa.gov/app/answers/detail/a_id/6643.
(2) Vouchers shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(ii) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(iii) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(d) Non-electronic payment. The Contractor may submit a voucher using other than the steps described at NSSC’s Vendor Payment information through any of the means described at https://www.nssc.nasa.gov/vendorpayment, if any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment when the Governmentwide commercial purchase card is used as the method of payment.
(2) The contract includes provisions allowing the contractor to submit vouchers using other than the steps prescribed at NSSC’s Vender Payment information website. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
(End of clause)
1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING. (NOV 2004)
(a) The Contractor shall submit NASA Contractor Financial Management Reports on NASA Forms 533 in accordance with the instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting, and on the reverse side of the forms, as supplemented in the Schedule of this contract. The detailed reporting categories to be used, which shall correlate with technical and schedule reporting, shall be set forth in the Schedule. Contractor implementation of reporting requirements under this clause shall include NASA approval of the definitions of the content of each reporting category and give due regard to the Contractor's established financial management information system.
(b) Lower level detail used by the Contractor for its own management purposes to validate information provided to NASA shall be compatible with NASA requirements.
(c) Reports shall be submitted in the number of copies, at the time, and in the manner set forth in the Schedule or as designated in writing by the Contracting Officer. Upon completion and acceptance by NASA of all contract line items, the Contracting Officer may direct the Contractor to submit Form 533 reports on a quarterly basis only, report only when changes in actual cost occur, or suspend reporting altogether.
(d) The Contractor shall ensure that its Form 533 reports include accurate subcontractor cost data, in the proper reporting categories, for the reporting period.
(e) If during the performance of this contract NASA requires a change in the information or reporting requirements specified in the Schedule, or as provided for in paragraph (a) or (c) of this clause, the Contracting Officer shall effect that change in accordance with the Changes clause of this contract.
(End of clause)
GRC 52.242-96 NASA Contractor Financial Reporting – Supplemental Requirements (NOV 2012)
(a) The following reporting requirements are associated with those stated in the NASA Contractor Financial Management Reporting clause (1852.242-73) of this contract, and NPR 9501.2, NASA Contractor Financial Management Reporting. NPR 9501.2 may be accessed through the NODIS Library at http://nodis3.gsfc.nasa.gov/.
(1) Approved Contract Baseline
(i) Within thirty (30) working days after the contract effective date, the Contractor shall provide a summary page(s) to the Contracting Officer (CO) and Contracting Officer’s Representative (COR), showing each reporting category as budgeted on a month-by-month basis for the duration of the work effort (Optional work efforts shall be separately summarized and Fiscal Years shall be subtotaled).
(ii) The corresponding monthly amounts on this summary shall be the amounts appearing in the “Planned” columns (7b and 7d) of each month’s NF 533 as reported during the duration of the work effort.
(iii) The following cost categories are required to appear in the “Contract Value” column (9b) of the NF 533. No amounts shall accrue against any cost category not listed herein, unless authorized in writing by the CO (Email is sufficient). Variations in format or organization are authorized, as long as they conform to the contract reporting requirements.
Direct Labor Hours ________________
Direct Labor Dollars ________________
Labor Overhead/Fringe Dollars ________________
Material Dollars ________________
Material Overhead Dollars ________________
| Other Direct Cost Dollars | ||||
| - Travel | ________________ | |||
| - Materials/Supplies | ________________ | |||
| - Equipment | ________________ | |||
| - Training | ________________ | |||
| - License | ________________ |
Subcontract Dollars ________________
Other Indirect Dollars ________________
G&A Dollars ________________
COM Dollars ________________
Fee Dollars ________________
Total Cost Plus Fee ________________
(iv) In the event of a revision to the work effort, the Contractor shall provide a revised month-by-month summary within 15 working days after the revision is approved.
(2) Monthly and Quarterly NF 533 Reports
(i) The Contractor shall submit the following financial reports:
(A) NF 533M (Monthly Contractor Financial Management Report)
(B) NF 533Q (Quarterly Contractor Financial Management Report)
(ii) Upon written request, the CO may authorize an alternative format that provides substantially the same level of detail as the required NF 533(s), but is more compatible with the Contractor's standard accounting/reporting format.
(iii) The report(s) shall be prepared in accordance with the instructions contained in contract clause 1852.242-73 and NPR 9501.2, and on the reverse of the forms. Additionally, any contract requirements identified as Capital Assets have special reporting requirements, which are specified in the “Capital Asset Acquisition” clause of this contract. Column 7b Cost Incurred/Hours Worked During Month Planned and 7d Cost Incurred/Hours Worked Cum. to Date Planned of the NF 533 M represent the negotiated baseline plan plus authorized changes for the contract. There may not be a direct relationship between the estimates provided in section 8 (Estimated Cost/Hours to Complete) of the NF 533 M and columns 7b and 7d. Columns 7b and 7d represent the negotiated baseline plan plus authorized changes, unlike the estimates provided in columns 8a, 8b, and 8c. Data in section 8 should not be simply a restatement of the baseline values.
(iv) The cost categories for the monthly and quarterly reports are the same as those specified in paragraph (a)(1)(iii) above.
(v) The Contractor shall provide a narrative explanation for any variance listed in the table below that exceeds the listed threshold. The explanation shall be provided as a footnote on the NF 533 report page, or included in a variance explanation table attached to the NF 533 report, and shall be detailed by cost category. The explanation shall include the cause of the variance, its impact on contract completion within the estimated cost, and the corrective action taken or proposed to be taken by the Contractor.
VARIANCE REPORTING REQUIREMENTS
| Title of Variance |
| Definition |
| Threshold |
| Actual vs. Estimated Cost |
| Any variance at the total contract level between a previous estimated month-specific expenditure and the actual expenditure reported for the same month. For example: The March 533M reported an estimated total contract expenditure for April of $100K, and subsequent April 533M reported actual total contract costs of $88K, which is a variance of 12% |
| 10% |
| Actual vs. Planned to Date |
| Any variance at the total contact level between the planned cost to date and the actual cost to date |
| The lesser of 10% or $100K |
| Contractor Final Estimate vs. Contract Value |
| Any variance at the total contract level between the contractor’s current final cost estimate and the current contract value. |
| The lesser of 5% or $100K |
(Additional variance reporting requirements may be added at the discretion of the Contracting Officer)
| (vi) IF THIS IS A TASK ORDER CONTRACT: | |
| (A) The Contractor shall submit one set of monthly reports that summarize the entire contract at the Task Order Level (total hours/dollars per Task Order), and monthly reports showing cost detailed by the individual cost categories identified in paragraph (a)(1)(iii) above, for each active Task Order and for the total contract effort. | |
| (B) If the contract includes identified capital asset expenditures, each capital asset shall be reported on its own report page. The level of reporting detail for capital assets shall be equal to the separate reporting for Task Orders under the contract. |
(vii) Report periods and submittal dates shall be in accordance with the instructions contained in NPR 9501.2. All reports shall include the signature of the Contractor party responsible for the information on the reports.
(viii) Reports shall be submitted electronically and/or in hardcopy format, in the number of copies, and to the individuals/areas indicated below:
| Individual/Area |
| No. of Copies |
E = Electronic H = Hard copy
| Mail Stop |
| Email Address |
| CO |
| TBD |
| TBD |
| TBD |
| COR |
| TBD |
| TBD |
| TBD |
| Accounting and Financial Analysis Division (AFAD) |
| TBD |
| TBD |
| TBD |
(ix) Late, Inaccurate, or Incomplete Reports may result in the following penalties:
(A) Payment withheld until compliance is demonstrated,
(B) Negative Contractor Performance Assessment ratings, and/or
(C) Reduction in award fee.
(b) The following reporting requirements are in addition to those stated in the NASA Contractor Financial Management Reporting clause (1852.242-73) of this contract, and NPR 9501.2, NASA Contractor Financial Management Reporting.
(1) Contractor Headcount Reports
(i) Each fiscal year quarter (December 31, March 31, June 30 and September 30), the contractor shall prepare a report that shows, for each reporting category that includes labor costs, the total onboard headcount (including WYEs) by labor category. Program management staff shall be listed separately. The headcount is total staffing including recurring subcontract support included as direct labor in the NF533.
(ii) The report shall be prepared in the sample format provided in Attachment ___ , Contractor Headcount Report, to this contract.
(iii) The report shall be submitted electronically to the CO no later than fifteen (15) work days after the close of the fiscal year quarter end date.
(2) Contractor Accounting Calendar
(i) The contractor shall prepare an accounting calendar for the life of the contract (base period plus all option periods).
(ii) The accounting calendar shall include the data categories shown in Attachment TBD, Sample Contractor Accounting Calendar, to this contract.
(iii) The accounting calendar shall be submitted electronically to the CO within fifteen (15) working days after the contract effective date.
1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED PROPERTY. (AUG 2015)
(a) The Contractor shall provide all property required for the performance of this contract. The Contractor shall not acquire or construct items of property to which the Government will have title under the provisions of this contract without the Contracting Officer's written authorization. Property which will be acquired as a deliverable end item as material or as a component for incorporation into a deliverable end item is exempt from this requirement. Property approved as part of the contract award or specifically required within the statement of work is exempt from this requirement.
(b)(1) In the event the Contractor is unable to provide the property necessary for performance, and the Contractor requests provision of property by the Government, the Contractor's request shall-
(i) Justify the need for the property;
(ii) Provide the reasons why contractor-owned property cannot be used;
(iii) Describe the property in sufficient detail to enable the Government to screen its inventories for available property or to otherwise acquire property, including applicable manufacturer, model, part, catalog, National Stock Number or other pertinent identifiers;
(iv) Combine requests for quantities of items with identical descriptions and estimated values when the estimated values do not exceed $500,000 per unit; and
(v) Include only a single unit when the acquisition or construction value equals or exceeds $500,000.
(2) Contracting Officer’s authorization is required for items the Contractor intends to manufacture as well as those it intends to purchase.
(3) The Contractor shall submit requests to the Contracting Officer no less than 30 days in advance of the date the Contractor would, should it receive authorization, acquire or begin fabrication of the item.
(c) The Contractor shall maintain copies of Contracting Officer authorizations, appropriately cross-referenced to the individual property record, within its property management system.
(d) Property furnished from Government excess sources is provided as-is, where-is. The Government makes no warranty regarding its applicability for performance of the contract or its ability to operate. Failure of property obtained from Government excess sources under this clause is insufficient reason for submission of requests for equitable adjustments discussed in the clause at FAR 52.245-1, Government Property, as incorporated in this contract.
(End of clause)
1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY - ALTERNATE I. (JAN 2011)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:
“See NASA Procedural Requirements (NPR) 4200.1, "NASA Equipment Management Procedural Requirements", NPR 4200.2, "NASA Equipment Management User's Guide for Property Custodians", NPR 4300.1, "NASA Personal Property Disposal", and NPR 4310.4, "Identification and Disposition of NASA Artifacts", for applicable user responsibilities.”
Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract. The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.
(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:
(i) The Contractor shall not utilize the installation’s central receiving facility for receipt of contractor-acquired property. However, the Contractor shall provide listings suitable for establishing accountable records of all such property received, on a monthly basis, to the SEMO.
(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.
(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.
(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.
(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.
(c) The following property and services are provided if checked:
(1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
(2) Office furniture.
(3) Property listed in [Insert attachment number or "not applicable" if no equipment is provided].
(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.
(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.
(4) Supplies from stores stock.
(5) Publications and blank forms stocked by the installation.
(6) Safety and fire protection for Contractor personnel and facilities.
(7) Installation service facilities: Library; Equipment calibration; Gov't-owned motor pool vehicles; Airport shuttle; Vehicle maintenance and fuel; Child care (Under similar terms and conditions applied to GRC civil servants); Fitness center (Under similar terms and conditions applied to GRC civil servants).
(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
(9) Cafeteria privileges for Contractor employees during normal operating hours.
(10) Building maintenance for facilities occupied by Contractor personnel.
(11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.
(End of clause)
1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF CONTRACTORS. (JAN 2011)
(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by NASA.
(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.
(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address: [Insert name and address of appropriate NASA Center office.], unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 15. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 15. Some activity may be estimated for the month of September, if necessary, to ensure the NF 1018 is received when due. However, contractors' procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533 Contractor Financial Management Report) cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention. Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period. Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.
(2) The Contracting Officer may, in NASA's interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71 and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.
(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.
(End of clause)
1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1. (JAN 2011)
For performance of work under this contract, the Government will make available Government property identified below or in Attachment [Insert attachment number or "not applicable"] of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245-1, Government Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at [Insert applicable site(s) where property will be used] and at other location(s) as may be approved by the Contracting Officer. Under FAR 52.245-1, the Contractor is accountable for the identified property.
(End of clause)
1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY. (AUG 2015)
(a) In addition to physical inventory requirements under the clause at FAR 52.245-1, Government Property, as incorporated in this contract, the Contractor shall conduct annual physical inventories for individual property items with an acquisition cost exceeding $500,000.
(1) The Contractor shall inventory-
(i) Items of property furnished by the Government;
(ii) Items acquired by the Contractor and titled to the Government under the clause at FAR 52.245-1;
(iii) Items constructed by the Contractor and not included in the deliverable, but titled to the Government under the clause at FAR 52.245-1; and
(iv) Complete but undelivered deliverables.
(2) The Contractor shall use the physical inventory results to validate the property record data, specifically location and use status, and to prepare summary reports of inventory as described in paragraph (c) of this clause.
(b) Unless specifically authorized in writing by the Property Administrator, the inventory shall be performed and posted by individuals other than those assigned custody of the items, responsibility for maintenance, or responsibility for posting to the property record. The Contractor may request a waiver from this separation of duties requirement from the Property Administrator, when all of the conditions in either (1) or (2) of this paragraph are met.
(1) The Contractor utilizes an electronic system for property identification, such as a laser bar-code reader or radio frequency identification reader, and
(i) The programs or software preclude manual data entry of inventory identification data by the individual performing the inventory; and
(ii) The inventory and property management systems contain sufficient management controls to prevent tampering and assure proper posting of collected inventory data.
(2) The Contractor has limited quantities of property, limited personnel, or limited property systems; and the Contractor provides written confirmation that the Government property exists in the recorded condition and location;
(3) The Contractor shall submit the request to the cognizant property administrator and obtain approval from the property administrator prior to implementation of the practice.
(c) The Contractor shall report the results of the physical inventory to the property administrator within 10 calendar days of completion of the physical inventory. The report shall-
(1) Provide a summary showing number and value of items inventoried; and
(2) Include additional supporting reports of-
(i) Loss in accordance with the clause at 52.245-1, Government Property;
(ii) Idle property available for reuse or disposition; and
(iii) A summary of adjustments made to location, condition, status, or user as a result of the physical inventory reconciliation.
(d) The Contractor shall retain auditable physical inventory records, including records supporting transactions associated with inventory reconciliation. All records shall be subject to Government review and/or audit.
(End of clause)
1852.245-79 RECORDS AND DISPOSITION REPORTS FOR GOVERNMENT PROPERTY WITH POTENTIAL HISTORIC OR SIGNIFICANT REAL VALUE. (JAN 2011)
(a) In addition to the property record data required by the clause at FAR 52.245-1, Government Property as incorporated in this contract, Contractor records of all Government property under this contract shall-
(1) Identify the projects or missions that used the items;
(2) Specifically identify items of flown property;
(3) When known, associate individual items of property used in space flight operations with the using astronaut(s); and
(4) Identify property used in test activity and, when known, the individuals who 0conducted the test.
(b) The Contractor shall include this information within item descriptions-
(1) On any Standard Form 1428, Inventory Schedule;
(2) In automated disposition systems;
(3) In any other disposition related reports; and
(4) In other requests for disposition instructions.
(c) The Contractor shall not remove NASA identification or markings from Government property prior to or during disposition without the advanced written approval of the Plant Clearance Officer.
(End of clause)
1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (JAN 2011)
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Property Management.
(2) NPR 8831.2, Facility Maintenance Management.
[Insert any additional Center occupancy requirements here]
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor's expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
(End of clause)
GRC 52.245-100 Capital Asset Acquisition (SEP 2009)
The following contract line items have been designated by NASA as capital assets*:
Line Item No. Description Quantity Unit Price Total Price
*A capital asset is an item: 1) With a total acquisition cost of $100,000 or more, 2) With a useful life of 2 years or more, 3) Not intended for sale in the contractor’s ordinary course of operations, 4) Acquired and/or fabricated by the contractor and to which NASA will or intends to take title, and 5) With an alternative future use (not research and development related). (Note: Items and/or services with values less than $100,000 that contribute to the acquisition or increased value of a capital asset (e.g. surveys for real property or components for capital equipment) are also subject to capitalization rules. Generally, NASA will inform the contractor if such items and/or services are classified as capital assets.)
During contract performance, if the contractor determines a need to acquire or fabricate items that may meet the criteria for capital assets beyond those specified above, the contractor shall submit a written request for approval to the contracting officer. Based on internal review, if the items are determined necessary for contract performance and determined to be capital assets, the contracting officer will modify the contract to: 1) Add separate line items to the contract appropriately, and 2) reference those items in paragraph (A) of this clause.
If NASA Contractor Financial Management Reports (NASA Form (NF) 533’s) are required under this contract, the contractor shall report all costs incurred against each identified capital asset on its own report page on the NF 533’s.
The costs incurred for each item designated as a capital asset shall be identified separately on any invoice, voucher, progress payment request, or other authorized payment request submitted by the contractor under this contract.
(End of clause)
GRC 52.245-99 Capital Asset Acquisition – Indefinite Delivery, Indefinite Quantity (IDIQ) Contracts (SEP 2009 )
When any task/delivery order issued under this contract includes a requirement for capital assets* the contracting officer will identify those items as such and create separate line items for them on the task/delivery order.
*A capital asset is an item: 1) With a total acquisition cost of $100,000 or more, 2) With a useful life of 2 years or more, 3) Not intended for sale in the contractor’s ordinary course of operations, 4) Acquired and/or fabricated by the contractor and to which NASA will or intends to take title, and 5) With an alternative future use (not research and development related). (Note: Items and/or services with values less than $100,000 that contribute to the acquisition or increased value of a capital asset (e.g. surveys for real property or components for capital equipment) are also subject to capitalization rules. Generally, NASA will inform the contractor if such items and/or services are classified as capital assets.)
During contract performance, if the contractor determines a need to acquire or fabricate an item that may meet the criteria for capital asset, the contractor shall submit a written request for approval to the contracting officer. Based on internal review, if the item is determined necessary for contract performance and determined to be a capital asset, the contracting officer will either: 1) Issue a new task/delivery order for the capital asset, or 2) Modify an appropriate existing task/delivery order to add a separate line item for the capital asset.
If NASA Contractor Financial Management Reports (NASA Form (NF) 533’s) are required under this contract, the contractor shall report all costs incurred against each identified capital asset on its own report page on the NF 533’s.
The costs incurred for each item designated as a capital asset shall be identified separately on any invoice, voucher, or other authorized payment request submitted by the contractor under this contract.
(End of clause)
CLAUSES INCORPORATED BY REFERENCE -- SECTION G
Clause(s) G.1 through G.2 at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of clause)
END OF SECTION G
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING. (NOV 2004)
H.2 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY. (FEB 2002)
H.3 1852.225-70 EXPORT LICENSES. (FEB 2000)
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at NASA Glenn Research Center, where the foreign person will have access to export-controlled technical data or software.
H.4 1852.209-71 LIMITATION OF FUTURE CONTRACTING. (DEC 1988)
(a) The Contracting Officer has determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5 - Organizational Conflicts of Interest.
(b) The nature of this conflict is: The Contractor may be asked to prepare specifications, advise on specifications, consult on Government Statements of Work, or otherwise perform duties that could lead to a potential unfair competitive advantage on future Government procurements as described in FAR 9.505(b).
(c) The restrictions upon future contracting are as follows:
(1) If the Contractor, under the terms of this contract, or through the performance of tasks pursuant to this contract, is required to develop specifications or statements of work that are to be incorporated into a solicitation, the Contractor shall be ineligible to perform the work described in that solicitation as a prime or first-tier subcontractor under an ensuing NASA contract. This restriction shall remain in effect for a reasonable time, as agreed to by the Contracting Officer and the Contractor, sufficient to avoid unfair competitive advantage or potential bias (this time shall in no case be less than the duration of the initial production contract). NASA shall not unilaterally require the Contractor to prepare such specifications or statements of work under this contract.
(2) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as these data remain proprietary or confidential, the Contractor shall protect these data from unauthorized use and disclosure and agrees not to use them to compete with those other companies.
(End of clause)
H.5 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING. (DEC 2015)
(a) Safety is the freedom from those conditions that can cause death, injury, occupational illness, damage to or loss of equipment or property, or damage to the environment. NASA's safety priority is to protect: (1) The public, (2) astronauts and pilots, (3) the NASA workforce (including contractor employees working on NASA contracts), and (4) high-value equipment and property.
(b) The Contractor shall take all reasonable safety and occupational health measures in performing this contract. The Contractor shall maintain an effective worksite safety and health program with organized and systematic methods to-
(1) Comply with Federal, State, and local safety and occupational health laws and with the safety and occupational health requirements of this contract;
(2) Describe and assign the responsibilities of managers, supervisors, and employees;
(3) Inspect regularly for and identify, evaluate, prevent, and control hazards;
(4) Orient and train employees to eliminate or avoid hazards; and
(5) Periodically review the program's effectiveness. Authorized Government representatives shall have access to and the right to examine the work site and related records under this Contract in order to determine the adequacy of the Contractor's safety and occupational health measures.
(c) The Contractor shall take, or cause to be taken, any other safety, and occupational health-measures the Contracting Officer may reasonably direct. To the extent that the Contractor may be entitled to an equitable adjustment for those measures under the terms and conditions of this contract, the equitable adjustment shall be determined pursuant to the procedures of the changes clause of this contract; provided, that no adjustment shall be made under this Safety and Health clause for any change for which an equitable adjustment is expressly provided under any other clause of the contract.
(d) The Contractor shall immediately notify the Contracting Officer or a designee any Type A, B, C, or D Mishap, or close calls as defined in NASA Procedural Requirement (NPR) 8621.1, Mishap and Close Call Reporting, Investigating, and Recordkeeping. In addition, service contractors (excluding construction contracts) shall provide quarterly reports specifying lost-time frequency rate, number of lost-time injuries, exposure, and accident/incident dollar losses as specified in the contract Schedule.
(e) The Contractor shall cooperate with any Government-authorized investigation of Type A, B, C, or D Mishaps, or Close…