Amendment #1 for Solicitation NIH-NICHD-NCMRR-2018-16

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT TO NICHD SOLICITATION

LIMB LOSS AND PRESERVATION REGISTRY

Solicitation Number: NIH-NICHD-NCMRR-2018-16 Amendment Number: 1 Amendment Issue Date: April 12, 2018 Proposal Due Date: May 30, 2018

DATE, TIME, Local Time UNCHANGED

Issued By: Gilberto Pérez Contracting Officer

NICHD

Office of Acquisitions 6710B Rockledge Drive, Room 1123B, MSC 7000 Bethesda, Maryland 20892

Point of Contact: Gilberto Pérez, Contracting Officer E-Mail: Gilberto.Perez-Rosa@nih.gov

This amendment is issued to all potential Offerors.

The above numbered solicitation is amended as set forth below. The hour and date specified for receipt of proposals (HAS NOT) been extended. Offerors must acknowledge receipt of this amendment by identifying this amendment number and date on each copy of the offer submitted. Failure to receive your acknowledgement may result in the rejection of your offer.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by e-mail, provided each e-mail makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

Except as provided herein, all terms and conditions of the RFP remain unchanged and in full force and effect. THE PURPOSE OF THIS AMENDMENT is to issue clarification questions received and to address updates to the RFP.

1. Question: Section A (page 1) specifies that offeror questions are due NLT 1:00PM EST on Friday, May 25.

a. Does the Government intend to answer questions on a rolling basis between the pre-proposal teleconference on April 17 and the questions deadline on May 25?

b. With proposals due before 3PM EST on Wednesday, May 30, how quickly does the Government plan to issue answers to questions submitted on May 25?

Response: The due date & time of Friday, May 25 at 1:00PM EST provided on Section A (page 1) was a clerical error. The statement should read as follows;

Submit ALL questions regarding this Request for Proposals (RFP) to the Contract Specialist listed on page 1 of this RFP NLT 4/16/2018 at 5:00PM EST.

mailto:Gilberto.Perez-Rosa@nih.gov

2. Question: In the Business Proposal Instructions, section 6. Small Business Subcontracting Plan, states; “If the proposed contract exceeds a total estimated cost of $700,000 for the entire period of performance, the offeror shall be required to submit an acceptable subcontracting plan in accordance with the terms of the clause entitled "Small Business Subcontracting Plan," FAR Clause No. 52.219-9, incorporated herein by reference in the Solicitation, See SECTION J - LIST OF ATTACHMENTS, BUSINESS PROPOSAL ATTACHMENTS of this RFP for an example of such a plan.”

Will the Small Business Subcontracting Plan which was not included in the RFP be provided upon award?

Response: An actual example of the Small Business Subcontracting Plan was not provided in Section J

– List of Attachments. There was however, a web link provided in Section J, BUSINESS PROPOSAL ATTACHMENTS, Attachment 12: Small Business Subcontracting Plan, page 50 of the RFP. The Government understands that some interested parties may have difficulty gaining access to the web page.

Therefore, a digital copy of the Small Business Subcontracting Plan is being provided with this amendment.

3. Question: Solicitation Cover Page states; “Submit all questions to the Contract Specialist listed NLT 1:00PM EST on 5/25/2018” and the due date for proposal submissions is May 30. Please confirm that questions are due 5 days (2 business days with the Memorial Day Holiday) prior to the proposal due date?

Response: Please see the response to Question #1.

4. Question: In Section J – List of Attachments, Solicitation Attachments, Attachment 2, Proposal Intent Response Form is listed (page 50). What is the due date for this form?

Response: There is no due date for the Proposal Intent Response Form.

5. Question: Attachment 1, page 2 states “A business proposal is not requested for the IDIQ contract.” Will it be required to submit the “Breakdown of Proposed Estimated Costs (plus Fee) with Excel Spreadsheet” for the IDIQ?

Response: Offerors are not required to submit a “Breakdown of Proposed Estimated Costs (plus Fee) with Excel Spreadsheet” for the IDIQ. However, Offerors should provide a “Breakdown of Proposed Estimated Costs (plus Fee) with Excel Spreadsheet” for the individual Task Order provided in the RFP.

END OF AMENDMENT #1 TO RFP (NIH-NICHD-NCMRR-2018-16)

HHS.gov

Office Of Small And Disadvantaged Business Utilization Small Business Subcontracting Plan The following outline meets the minimum requirements of section 8(d) of the Small Business Act, as amended, and implemented by the Federal Acquisition Regulations (FAR) Subpart 19.7. The U.S.

Department of Health and Human Services (HHS), Office of Small and Disadvantaged Business Utilization (OSDBU) recommend offerors use the following format to submit proposed Individual Subcontracting Plans, including modifications. It is not intended to replace any existing Corporate/Commercial Plan that is more extensive. A subcontracting Plan is required if the estimated cost of the contract may exceed $700,000 ($1,500,000 for construction) Small businesses are excluded.

Questions should be forwarded to the Contracting Officer or Operating Division (OPDIV) Small Business Specialist.

HHS Operating Division (OPDIV): _______________________________

SOLICITATION OR CONTRACT NUMBER: ______________________________

DATE OF PLAN : ___________________________________________________

CONTRACTOR : ____________________________________________________

ADDRESS : ________________________________________________________

STATE/ZIP CODE ___________________________________________________

DUNN & BRADSTREET NUMBER: _____________________________________

ITEM/SERVICE (Description): _______________________________________

NEW/INITIAL CONTRACT

PERIOD OF CONTRACT PERFORMANCE (MM/DD/YYYY – MM/DD/YYYY):__________________

U.S. Department of Health & Human Services

Page 1 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

Base (if options apply) $___________________ Performance Period/Quantity ____________

Option 1: $___________________ Performance Period/Quantity ____________

Option 2: $___________________ Performance Period/Quantity ____________

Option 3: $___________________ Performance Period/Quantity ____________

Option 4: $___________________ Performance Period/Quantity ____________

$___________________ Total Contract Cost

CONTRACT MODIFICATION (if applicable)

NEW PERIOD OF CONTRACT PERFORMANCE (MM/DD/YYYY –

MM/DD/YYYY):__________________

Original/Base $___________________ Performance Period/Quantity _________

Modification $___________________ Performance Period/Quantity _________

Task Order $___________________ Performance Period/Quantity _________

$___________________ Modified Total Contract Cost

Failure to include the essential information of FAR Subpart 19.7 may be cause for either a delay in acceptance or the rejection of a bid or offer when a subcontracting plan is required. “SUBCONTRACT,” as used in this clause, means any agreement (other than one involving an employer-employee relationship) entered into by a Federal Government prime contractor or subcontractor requesting supplies or services required for performance of the contract or subcontract .

If assistance is needed to locate small business sources , contact the Small Business Specialist (SBS) supporting the OPDIV. SBS contact information is located on the OSDBU website (http://www.hhs.gov/about/smallbusiness/osdbustaff.html) or you may contact the OSDBU headquarters at (202) 690-7300.

HHS current subcontracting goal is 33.0% for Small Business (hereafter referred to as SB), 5.00% for Small Disadvantaged Business, including 8(a) Program Participants, Alaska Native Corporations (ANC) and Indian Tribes (hereafter referred to as SDB), 5.00% for Women-Owned Small Business and Economically Disadvantaged Women-Owned Small Business (hereafter referred to as WOSB), 3.00% HubZone business (hereafter referred to as HUBZone), 3.00% Veteran Owned Small Business (hereafter referred to as VOSB) and 3.00% Service Disabled Veteran-Owned Small Business (hereafter referred to as SDVOSB) concerns for Fiscal Year (FY) 2016. For this procurement, HHS expects all proposed subcontracting plans to contain at a minimum the aforementioned percentages.

Page 2 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

These percentages shall be expressed as percentages of the total estimated subcontracting dollars.

1. Type of Plan (check one)

_____ Individual plan (all elements developed specifically for this contract and applicable for the full term of this contract).

_____ Master plan (goals developed for this contract) all other elements standardized and approved by a lead agency Federal Official; must be renewed every three years and contractor must provide copy of lead agency approval.

_____ Commercial products/service plan (goals are negotiated with the initial agency on a company-wide basis rather than for individual contracts) this plan applies to the entire production of commercial service or items or a portion thereof. The contractor sells commercial products and services customarily used for non-government purposes. The plan is effective during the offeror’s fiscal year (attach a copy).

The Summary Subcontracting Report (SSR) must include a breakout of subcontracting prorated for HHS and other Federal agencies.

2. Goals

Below indicate the dollar and percentage goals for Small Business (SB), Small Disadvantaged (SDB) including Alaska Native Corporations and Indian Tribes, Women-owned and Economically Disadvantaged Women-Owned (WOSB), Historically Underutilized Business Zone (HUBZone), Veteran Owned Small Business (VOSB), Service-Disabled Veteran-Owned (SDVOSB) Small Businesses and “Other than Small Business” (Other) as subcontractors. Indicate the base year and each option year, as specified in FAR

19.704 or project annual subcontracting base and goals under commercial plans. If any contract has more four options, please attach additional sheets which illustrate dollar amounts and percentages. PLEASE NOTE: Zero dollars is not an acceptable goal for the SB, SDB, WOSB, HUBZone, VOSB or SDVOSB categories since this does not demonstrate a good faith effort throughout the period of performance of the contract. Formula for below: 2.b. + 2.h. = 2.a.

a. Total estimated dollar value of ALL planned subcontracting , i.e., with ALL types of concerns under this contract is _____ ____ (Base Period - if options apply).

FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

b. Total estimated dollar value and percent of planned subcontracting with SMALL BUSINESSES (including SDB, WOSB, HUBZone, VOSB and SDVOSB): (% of “a”) $ ________________ and ________________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option st nd rd th st nd rd th

Page 3 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

c. Total estimated dollar value and percent of planned subcontracting with SMALL DISADVANTAGED BUSINESSES: (% of “a”) $ ________________ and ________________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

d. Total estimated dollar value and percent of planned subcontracting with WOMEN-OWNED SMALL BUSINESSES: (% of “a”) $ ________________ and ________________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

e. Total estimated dollar and percent of planned subcontracting with HUBZone SMALL BUSINESSES:

(% of “a”) $ ________________ and _________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

f. Total estimated dollar and percent of planned subcontracting with Veteran-Owned SMALL BUSINESSES: (% of “a”) $ ____________and ________________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

g. Total estimated dollar and percent of planned subcontracting with Service-Disabled Veteran-Owned SMALL BUSINESSES: (% of “a”) $ ________________ and ________________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

h. Total estimated dollar and percent of planned subcontracting with “OTHER THAN SMALL BUSINESSES” (As defined by the Small Business Administration as “any entity that is not classified as a small business. This includes large businesses, state and local governments, non-profit organizations, public utilities, educational institutions and foreign-owned firms.) (% of “a”) $ ________________ and ________________% (Base Period - if options apply) FY ___1 Option FY ___2 Option FY ___3 Option FY ___4 Option

i. Provide a description of ALL the products and/or services to be subcontracted under this contract, and indicate the size and type of business supplying them (check all that apply):

Products and/or

Services

Other Small

Business

SDB WOSB Hubz VOSB SDVOSB st nd rd th st nd rd th st nd rd th st nd rd th st nd rd th st nd rd th

Page 4 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

j. Provide a description of the method used to develop the subcontracting goals for SB, SDB, WOSB, HUBZone and SDVOSB concerns. Address efforts made to ensure that maximum practicable subcontracting opportunities have been made available for those concerns and explain the method used to identify potential sources for solicitation purposes. Explain the method and state the quantitative basis (in dollars) used to establish the percentage goals. Also, explain how the areas to be subcontracted to SB, WOSB, HUBZone, VOSB and SDVOSB concerns were determined, how the capabilities of these concerns were considered contract opportunities and how such data comports with the cost proposal. Identify any source lists or other resources used in the determination process. (Attach additional sheets, if necessary.)

k. Indirect costs have ____ have not ____ been included in the dollar and percentage subcontracting goals above (check one).

Page 5 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

l. If indirect costs have been included, explain the method used to determine the proportionate share of such costs to be allocated as subcontracts to SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns:

3. Program Administrator:

NAME: ______________________________________________

TITLE: ______________________________________________

ADDRESS: ______________________________________________

TELEPHONE: ______________________________________________

E-MAIL: ______________________________________________

Duties : Does the individual named above have general overall responsibility for the company’s subcontracting program, i.e., developing, preparing, and executing subcontracting plans and monitoring performance relative to the requirements of those subcontracting plans and perform the following duties?

(If NO is checked, please who in the company performs those duties, or indicate why the duties are not performed in your company on a separate sheet of paper and submit with the proposed subcontracting plan.)

a. Developing and promoting company-wide policy initiatives that demonstrate the company’s support for awarding contracts and subcontracts to SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns;

and for assuring that these concerns are included on the source lists for solicitations for products and services they are capable of providing; __yes __ no

b. Developing and maintaining bidder source lists of SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns from all possible sources; __yes __ no

c. Ensuring periodic rotation of potential subcontractors on bidder’s lists; __ yes __ no

d. Assuring that SB, SDB, WOSB, HUBZone, VOSB and SDVOSB businesses are included on the bidders’ list for every subcontract solicitation for products and services that they are capable of providing. __ yes __ no

e. Ensuring that Requests for Proposals (RFPs) are designed to permit the maximum practicable participation of SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns. __ yes __ no

Page 6 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

f. Reviewing subcontract solicitations to remove statements, clauses, etc., which might tend to restrict or prohibit small, 8(a), SDB, WOSB, HUBZone, VOSB and SDVOSB small business participation. __ yes __ no

g. Accessing various sources for the identification of SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns to include the System for Award Management ( http://sam.gov ), local small business and minority associations, local chambers of commerce and Federal agencies’ Small Business Offices; ___ yes ___ no

h. Establishing and maintaining contract and subcontract award records; __ yes __ no

i. Participating in Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, Procurement Conferences, etc; __ yes __ no

j. Ensuring that SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns are made aware of subcontracting opportunities and assisting concerns in preparing responsive bids to the company; __ yes __ no

k. Conducting or arranging for the conduct of training for purchasing personnel regarding the intent and impact of Section 8(d) of the Small Business Act, as amended; __ yes __ no

l. Monitoring the company’s subcontracting program performance and making any adjustments necessary to achieve the subcontract plan goals; ___yes ___ no

m. Preparing and submitting timely, required subcontract reports; ___ yes ___ no

n. Conducting or arranging training for purchasing personnel regarding the intent and impact of 8(d) of the Small Business Act on purchasing procedures; __ yes __ no

o. Coordinating the company’s activities during the conduct of compliance reviews by Federal agencies;

and __ yes __ no

p. Other duties: ________________________________________________________

4. Equitable Opportunity

Describe efforts the offeror will undertake to ensure that SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns will have an equitable opportunity to compete for subcontracts. These efforts include, but are not limited to, the following activities:

a. Outreach efforts to obtain sources:

Page 7 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

1. Contact minority and small business trade associations; 2) contact business development organizations and local chambers of commerce; 3) attend SB, SDB, WOSB, HUBZone, VOSB and SDVOSB procurement conferences and trade fairs; 4) review sources from the System for Award Management ( http://www.sam.gov); 5) review sources from the Small Business Administration (SBA), Dynamic Small Business Search database (DSBS) http://dsbs.sba.gov/); 6) Consider using other sources such as the National Institutes of Health (NIH) e-Portals in Commerce, (e-PIC), (http://epic.od.nih.gov/)). The NIH e-PIC is not a mandatory source; however, it may be used at the offeror’s discretion; and 7) Utilize newspaper and magazine ads to encourage new sources.

b. Internal efforts to guide and encourage purchasing personnel:

1. Conduct workshops, seminars and training programs;

2. Establish, maintain, and utilize SB, SDB, WOSB, HUBZone, VOSB and SDVOSB source lists, guides, and other data for soliciting subcontractors; and

3. Monitor activities to evaluate compliance with the subcontracting plan.

Additional efforts:

5. Flow Down Clause

The contractor agrees to include the provisions under FAR 52.219-8, “Utilization of Small Business Concerns,” in all acquisitions exceeding the simplified acquisition threshold that offers further subcontracting opportunities. All subcontractors, except small business concerns, that receive subcontracts in excess of $700,000 ($1,500,000 for construction) must adopt and comply with a plan similar to the plan required by FAR 52.219-9, “Small Business Subcontracting Plan.” Note: In accordance with FAR 52.212-5(e) and 52.244-6(c) the contractor is not required to include flow-down clause FAR 52.219.-9 if it is subcontracting commercial items.

6. Reporting and Cooperation

The contractor gives assurance of 1) cooperation in any studies or surveys that may be required; 2) submission of periodic reports which illustrate compliance with the subcontracting plan; 3) submission of its Individual Subcontracting Report (ISR) and Summary Subcontract Report (SSR); and 4) subcontractors submission of ISRs and SSRs. ISRs and SSRs shall be submitted via the Electronic Subcontracting Reporting System (eSRS) website https://esrs.symplicity.com/index?_tab=signin&cck=1

Page 8 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

Reporting Period Report Due Due Date

Oct 1 - Mar 31 ISR 4/30

Apr 1 - Sept 30 ISR 10/30

Oct 1 - Sept 30 SSR 10/30

Contract Completion Year End SDB Report 30 days after completion

Please refer to FAR Part 19.7 for instruction concerning the submission of a Commercial Plan: SSR is due on 10/30 each year for the previous fiscal year ending 9/30.

a. Submit ISR (bi-annually) for the awarding Contracting Officer’s review and acceptance via the eSRS website.

b. Currently, SSR (annually) must be submitted for the HHS eSRS Agency Coordinator review and acceptance via the eSRS website. (Note: Log onto the OSDBU website to view the HHS Agency Coordinator contact information ( http://www.hhs.gov/grants/small-business-programs/index.html)

Note: The Request for Proposal (RFP) will indicate whether a subcontracting plan is required. Due to the nature and complexity of many HHS contracts, particularly the Centers for Medicare and Medicaid (CMS), the contractor may not be required to submit its subcontracting reports through the eSRS. The Contracting Officer will confirm reporting requirements prior to the issuance of an award. For more information, contact Agency Coordinator-eSRS on 202-690-7300.

7. Record keeping

FAR 19.704(a) (11) requires a list of the types of records your company will maintain to demonstrate the procedures adopted to comply with the requirements and goals in the subcontracting plan. The following is a recitation of the types of records the contractor will maintain to demonstrate the procedures adopted to comply with the requirements and goals in the subcontracting plan. These records will include, but not be limited to, the following:

a. SB, SDB, WOSB, HUBZone, VOSB and SDVOSB source lists, guides and other data identifying such vendors;

b. Organizations contacted in an attempt to locate SB, SDB, WOSB, HUBZone, VOSB and SDVOSB sources;

Page 9 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

c. On a contract-by-contract basis, records on all subcontract solicitations over $100,000, which indicate for each solicitation (1) whether SB, SDB, WOSB, HUBZone, VOSB and/or SDVOSB concerns were solicited, if not, why not and the reasons solicited concerns did not receive subcontract awards;

d. Records to support other outreach efforts, e.g., contacts with minority and small business trade associations, attendance at small and minority business procurement conferences and trade fairs;

e. Records to support internal guidance and encouragement provided to buyers through (1) workshops, seminars, training programs, incentive awards; and (2) monitoring performance to evaluate compliance with the program and requirements; and

f. On a contract-by-contract basis, records to support subcontract award data including the name, address, and business type and size of each subcontractor. (This is not required on a contract–by –contract basis for commercial plans.)

g. Other records to support your compliance with the subcontracting plan: (Please describe)

8. Timely Payments to Subcontractors

FAR 19.702 requires your company to establish and use procedures to ensure the timely payment of amounts due pursuant to the terms of your subcontracts with SB concerns, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns.

Your company has established and used such procedures: ________ yes _________ no

9. Description of Good Faith Effort

Maximum practicable utilization of SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns as subcontractors in Government contracts is a matter of national interest with both social and economic benefits. When a contractor fails to make a good faith effort to comply with a subcontracting plan, these objectives are not achieved, and 15 U.S.C. 637(d) (4) (F) directs that liquidated damages shall be paid by the contractor. In order to demonstrate your compliance with a good faith effort to achieve the SB, SDB, WOSB, HUBZone, VOSB and SDVOSB small business subcontracting goals, outline the steps your company plans to take. These steps will be negotiated with the contracting official prior to approval of the plan.

Page 10 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

SIGNATURE PAGE

Signatures Required:

This subcontracting plan was submitted by:

Signature: __________________________________________________

Typed/Print Name: __________________________________________________

Title: __________________________________________________

Date: __________________________________________________

This plan was reviewed by:

Signature: __________________________________________________

Typed/Print Name: __________________________________________________

Title: Contracting Officer Date: ______________

This plan was reviewed by:

Signature: __________________________________________________

Typed/Print Name: __________________________________________________

Title: HHS Small Business Specialist Date: ______________

This plan was reviewed by:

Signature: __________________________________________________

Typed/Print Name: __________________________________________________

Title: Small Business Administration Procurement Center Representative

Date: __________________________________________________

This plan was approved by:

Signature: __________________________________________________

Typed/Print Name: __________________________________________________

Title: Contracting Officer Date: ______________

Page 11 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

Content created by Assistant Secretary for Financial Resources (ASFR)

Content last reviewed on July 26, 2016

Page 12 of 12Small Business Subcontracting Plan | HHS.gov

4/12/2018https://www.hhs.gov/grants/contracts/contract-policies-regulations/subcontractplan/index.h...

LLPR Amendment 1
AMENDMENT TO NICHD SOLICITATION
LIMB LOSS AND PRESERVATION REGISTRY

Small Business Subcontracting Plan

File details come from the government source that posted it.