Newman Virtual Studio_Drawing_Set.pdf
PDF 18 MB Posted
- Solicitation number
- IFB-126589
- Issued by
- Middlesex County, Virginia
About this file
This is a comprehensive drawing set for the Newman Library 4th Floor Virtual Studio Expansion project at Virginia Polytechnic Institute and State University in Blacksburg, Virginia. The project involves the expansion of virtual studio facilities on the 4th floor of the Carol M. Newman Library building, adding approximately 2,520 square feet of new space in the southeast area of the library. The new suite includes multiple specialized rooms: a virtual production stage (877 SF), control and monitor room (453 SF), motion capture spatial audio and room-scale VR space (500 SF), volumetric capture stage (199 SF), collaboration room (320 SF), IT room (36 SF), and circulation area (174 SF), along with four existing study spaces (106 SF each) totaling 3,250 SF of work area. The project is classified as an alteration to an existing building (Type I-A construction), with primary occupancy designated as B-Business. The design documents include architectural, structural, mechanical, electrical, and sprinkler drawings prepared by Hughes Associates Architects & Engineers, with structural consulting by Favor Engineering, PLLC, and mechanical/electrical engineering by Lawrence Perry & Associates. The project must comply with the 2021 Virginia Construction Code and the Virginia Tech Design and Construction Standards Manual (2023).
The project includes comprehensive specifications for HVAC systems, fire safety, demolition of existing elements, installation of new walls with sound attenuation, LED panel walls and ceiling installations, electrical systems, fire alarm systems, and sprinkler systems. Asbestos-containing materials (ACM) were identified in the general area and must not be disturbed except where specifically required, with abatement by a licensed contractor following approved procedures. No lead-containing paint was found. The contractor must comply with Virginia Tech's Safety Requirements for Contractors and Subcontractors Program and coordinate work with ongoing library operations, maintaining clear paths of egress and limiting dust and dirt migration. The general contractor is responsible for all cutting and patching, relocation of utilities, disposal of demolished materials to Montgomery Regional Solid Waste Authority Transfer Station, and providing temporary barricades and protections. All work must be inspected and certified, with existing systems including fire alarms and fire resistance ratings maintained throughout construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_443882701_Newman Virtual Studio_Project_Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R e n o v a t i o n s & R e m o d e l
VIRTUAL STUDIO EXPANSION
3800 Electric Rd Suite 300|ROANOKE, VIRGINIA 24016
540.342.4002 www.HughesAE.com
HUGHES
ASSOCIATES
ARCHITECTS & ENGINEERS
VIRGINIA POLYTECHNIC INSTITUTE
& STATE UNIVERSITY, BLACKSBURG, VA 24061
JESSE-ALLEN MORRIS
ASSISTANT PROJECT MANAGER OF
NON-CAPITAL CONSTRUCTION
VIRGINIA TECH
230 STERRETT DRIVE
BLACKSBURG, VIRGINIA 24061
540.230.6146 Jesseallenmorris@vt.edu
CLIENT/OWNER
PROJECT SCOPE/SUMMARY
SHEET INDEX
A1-1 A1-1.1
A1-1.1 A1-1
A1-1 A1-1.1
DRAWING SYMBOLS
ELEVATION
SECTION
CUT
INTERIOR
ELEVATION
SHEET WHERE ELEV. APPEARS
DETAIL NO.
SHEET WHERE ELEV. WAS TAKEN
NOTE
DOOR TAG
WINDOW TAG
A1-1.1 A1-1
ENLARGED
DETAIL OR
PLAN
REVISION NO.
PARTITION TYPE
NORTH ARROW
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS, PC
3800 ELECTRIC SUITE 300
ROANOKE, VA 24016
SHAWN EMMONS
540.342.4002 OFFICE
semmons@hughesae.com
ARCHITECT
4TH FLOOR - NEWMAN LIBRARY
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIVERSITY
560 DRILLFIELD DRIVE, BLACKSBURG, VA 24061
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIVERSITY (VPI) IS EXPANDING ITS
VIRTUAL STUDIO FACILITIES LOCATED ON THE 4TH FLOOR OF THE CAROL M NEWMAN
LIBRARY BUILDING. THE NEW, APPROXIMATE 2,520 SF SPACE IS A SUITE OF OFFICES
AND STUDIOS & IS LOCATED IN THE SOUTH EAST AREA OF THE LIBRARY FLOOR.
G100 COVER SHEET
G101 LIFE SAFETY PLAN & CODE DATA
ARCHITECTURAL DRAWINGS
SP101 SPECIFICATIONS
SP102 SPECIFICATIONS
SP103 SPECIFICATIONS
SP104 LEAD & ASBESTOS INSPECTION REPORT
AD101 DEMOLITION PLAN
A101 FLOOR PLAN
A102 DIMENSIONAL FLOOR PLAN
A201 REFLECTED CEILING PLAN
A301 INTERIOR ELEVATIONS & SECTIONS
A401 SCHEDULES & DETAILS
STRUCTURAL DRAWINGS
S1-1 STRUCTURAL GENERAL NOTES, EXISTING FIFTH
FLOOR FRAMING PLAN, SECTIONS AND DETAILS
MECHANICAL DRAWINGS
M-0 HVAC LEGENDS, NOTES, DETAILS & CONTROLS
M-1 HVAC PARTIAL FOURTH FLOOR PLAN - DEMOLITION
M-2 HVAC PARTIAL FOURTH FLOOR PLAN - NEW WORK
M-3 HVAC SPECIFICATIONS
M-4 HVAC SPECIFICATIONS
ELECTRICAL DRAWINGS
E-0 ELECTRICAL LEGENDS & ABBREVIATIONS
E-1 ELECTRICAL GENERAL NOTES
E-2 ELECTRICAL SPECIFICATIONS
E-3 ELECTRICAL DETAILS & SCHEDULES
ED-1 PARTIAL FOURTH FLOOR DEMOLITION PLAN - ELECTRICAL
E-4 PARTIAL FOURTH FLOOR NEW WORK PLAN - LIGHTING
E-5 PARTIAL FOURTH FLOOR NEW WORK PLAN - POWER
E-6 PARTIAL FOURTH FLOOR NEW WORK PLAN - LOW VOLTAGE
E-7 PARTIAL ELECTRICAL POWER RISER DIAGRAM
E-8 PANELBOARD SCHEDULES
SPRINKLER DRAWINGS
SP-1 SPRINKLER LEGEND, NOTES AND DETAILS
FAVOR ENGINEERING, PLLC -
STRUCTURAL CONSULTING
1948 FRANKLIN ROAD SW
ROANOKE, VA 24014
CRAIG FAVOR, PE
540.491.0780 craig.favor@fe-pllc.com
STRUCTURAL ENGINEER
LAWRENCE PERRY & ASSOCIATES
15 E. SALEM AVE SE, SUITE 101
ROANOKE, VA 24011
RODNEY FANNING, PE, CEM
PRINCIPAL, PRESIDENT
540.342.1816 RFanning@lpa-inc.com
MECHANICAL & ELECTRICAL ENGINEER
PLAN
TRUE N
PRIMARY AREA OF WORK
VTP-2223-2024
P4553051
VICINITY MAP
NOT TO SCALE
NEWMAN LIBRARY
1. ALL WORK SHALL COMPLY WITH THE VIRGINIA TECH DESIGN AND CONSTRUCTION STANDARDS MANUAL, DATED
JULY 2023.
2. THE CONTRACTOR SHALL COMPLY WITH VIRGINIA TECH'S SAFETY REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS PROGRAM, WHICH IS INCORPORATED BY REFERENCE. COPIES OF THIS PROGRAM CAN BE
OBTAINED FROM THE OWNER OR DOWNLOADED FROM WWW.EHSS.VT.EDU.
3. ASBESTOS DISCLOSURE STATEMENT
AN ASBESTOS INSPECTION WAS PERFORMED AND ACM WAS FOUND GENERALLY IN THE AREA(S) INDICATED. THE ASBESTOS INSPECTION REPORT IS INCLUDED AS AN APPENDIX TO THE PROJECT SPECIFICATIONS. ACM SHALL NOT BE DISTURBED IN THIS WORK EXCEPT WHERE SPECIFICALLY INDICATED AND REQUIRED. WHERE SUCH ACTIONS ARE REQUIRED, THE CONTRACTOR SHALL HAVE THE ACM REMOVED BY A LICENSED ASBESTOS CONTRACTOR USING APPROVED PROCEDURES AS SPECIFIED. THE WORK REQUIRED FOR ASBESTOS ABATEMENT IS PERMITTED WITHIN THE OVERALL BUILDING PERMIT ISSUED. THE ACM THAT IS TO REMAIN AND THE NEW NON-ASBESTOS CONTAINING MATERIAL SHALL BE LABELED ACCORDINGLY. THE ASBESTOS ABATEMENT CONTRACTOR SHALL MARK UP THE RECORD DRAWINGS RESULTING FROM ITS WORK TO INCLUDE AREAS WHERE ASBESTOS WAS ABATED AND AREAS WHERE ACM EXIST BUT WERE LEFT IN PLACE. THE GENERAL CONTRACTOR SHALL REVIEW AND CERTIFY THE LOCATIONS WHERE ACM WAS ABATED AND AREAS WHERE ACM WAS LEFT IN PLACE AS MARKED ON THE RECORD
DRAWINGS AND WILL PROVIDE THE DRAWINGS TO THE A/E.
(2023 DCSM, 1.7.4.2.2)
4. LEAD MATERIALS DISCLOSURE STATEMENT
A LEAD-CONTAINING PAINT INSPECTION WAS PERFORMED AND NO LEAD-CONTAINING PAINT WAS FOUND.
(2023 DCSM, 1.7.4.3.2)
4TH FLR NEWMAN LIBRARY KEY PLAN
NOT TO SCALE
GENERAL PROJECT NOTES
COVER SHEET
G100
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
JULY 2, 20261
LIFE SAFETY PLAN
SCALE 3/16" = 1'-0"1
G101
CODE COMPLIANCE
GENERAL BUILDING INFORMATION
BUILDING NUMBER: 0177
ADDRESS: 560 DRILLFIELD DR BLACKSBURG, VA 24061
BUILDING IS LOCATED IN HISTORIC DISTRICT NO YES
BUILDING IS LOCATED IN A FLOOD PLAIN (SEE CIVIL) NO YES
BUILDING WAS BUILT PRIOR TO 1985 NO YES
ASBESTOS REPORT SUBMITTED) NO YES
BUILDING IS CURRENTLY ACCESSIBLE PER CHAPTER 11 NO YES
ADDITIONAL DRAWINGS TO BE SUBMITTED AT A LATER DATE: FIRE SPRINKLERS FIRE ALARMS
APPLICABLE BUILDING CODES:
2021 VIRGINIA CONSTRUCTION CODE (USBC PART 1, IBC)
2021 VIRGINIA RESIDENTIAL CODE
2021 VIRGINIA EXISTING BUILDING CODE (USBC PART 2)
2021 VIRGINIA ENERGY CONSERVATION CODE
2017 ICC A117.1 ACCESSIBLE AND USABLE BLDGS. & FACILITIES
2023 DCSM - VIRGINIA TECH DESIGN & CONSTRUCTION STANDARDS MANUAL
TYPE OF WORK
NEW BUILDING
EXISTING BUILDING ALTERATION LEVEL 1 LEVEL 2
OCCUPANCY INFORMATION
PRIMARY OCCUPANCY: B-BUSINESS ACCESSORY USES: N/A
INCIDENTAL USES: N/A
PERCENTAGE OF OVERALL AREA: N/A
SPECIAL OCCUPANCIES: N/A
BUILDING DATA
CONSTRUCTION TYPE:
I-A I-B II-A II-B III-A III-B IV HT V-A V-B
MIXED CONSTRUCTION NO YES
SPRINKLERS NO YES NFPA 13 NFPA 13R
BUILDING HEIGHT: 6 STORIES
1978 TOTAL BUILDING ADDITION AREA: 115,035
AREA OF WORK: 3,250 SF OF THE 4TH FLOOR
6 OCC
VIRTUAL
PRODUCTION STAGE
877 SF(/150 NSF)
4 OCC
CONTROL &
MONITOR ROOM
453 SF(/150 NSF)
1 OCC
IT ROOM
36 SF(/300 NSF)
3 OCC
COLLABORATION
ROOM
320 SF(/150 NSF)
4 OCC
MOTION CAPTURE
SPATIAL AUDIO &
ROOM-SCALE VR
500 SF(/150 NSF)
2 OCC
VOLUMETRIC
CAPTURE STAGE
199 SF(/150 NSF)
2 OCC
CIRC
174 SF(/150 NSF)
1 OCC
EXST
STUDY 01
106 SF(/150 NSF)
1 OCC
EXST
STUDY 02
106 SF(/150 NSF)
1 OCC
EXST
STUDY 03
106 SF(/150 NSF)
1 OCC
EXST
STUDY 04
106 SF(/150 NSF)
EXIT
CA
P.
CL
R
" 16
EXIT
CAP.
CLR32"
160111' 13
7'-0"DIRECTIONAL
EXIT SIGN
9'-0"
WALL-MOUNTED
FIRE EXTINGUISHER
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
LIFE SAFETY
PLAN &
CODE DATA
G101
JULY 2, 20261
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
SPECIFICATIONS
SP101
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
SPECIFICATIONS
SP102
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
SPECIFICATIONS
SP103
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
LEAD &
ASBESTOS
INSPECTION
REPORT
SP104
# KEY DEMOLITION NOTES
1 REMOVE LIGHT FIXTURES.
2 REMOVE & SALVAGE ACT CEILING TILES. TURN OVER TO OWNER, TYP.
LEGEND
GENERAL AREA/FOOTPRINT OF
VIRTUAL STUDIO EXPANSION
DEMOLITION.
CONTRACTOR TO VERIFY WITH
OWNER EXTENTS OF DEMOLITION.
CONTRACTOR
REQUIRED TO PROVIDE SMOOTH
FINISH TRANSITIONS BETWEEN
NEW & EXISTING FINISH &
STRUCTURAL CONDITIONS.
DEMOLITION FLOOR & CEILING PLAN
SCALE 3/16" = 1'-0"1
AD101
GENERAL DEMOLITION NOTES
1. EXISTING DIMENSIONS, AREAS & SIZES/LOCATION OF EXISTING EQUIPMENT ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL SITE CONDITIONS PRIOR TO SUBMITTING A BID. IF CONDITIONS IN FIELD DIFFER
SIGNIFICANTLY FROM THOSE SHOWN, NOTIFY OWNER/ARCHITECT FOR CLARIFICATION.
2. CONTRACTOR SHALL VERIFY THE AVAILABILITY OF EXISTING FACILITIES AND UTILITIES AT THE PROJECT SITE
PRIOR TO SUBMITTING A BID.
3. CONTRACTOR SHALL NOTIFY ALL UTILITIES, INCLUDING BUT NOT LIMITED TO WATER/SEWER, ELECTRIC, GAS, TELEPHONE, HAVING SERVICE CONNECTIONS TO THE EXISTING BUILDING PRIOR TO DEMOLITION TO ENSURE THAT ANY EQUIPMENT HAS BEEN PROPERLY REMOVED, UNPLUGGED, CAPPED/PLUGGED, OR SEALED AS REQUIRED FOR DEMOLITION AND/OR NEW WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER REMOVAL, CAPPING/PLUGGING, AND SEALING OF SERVICES REMAINING IN WORK AREAS AS REQUIRED FOR
DEMOLITION AND/OR NEW WORK.
4. REMOVE EXISTING ITEMS/ MATERIALS TO SUBSTRATE AS INDICATED AND REQUIRED FOR NEW WORK.
5. REMOVE DEMOLISHED MATERIALS FROM SITE DAILY AFTER ALLOWING OWNER FIRST RIGHT OF REFUSAL FOR
ANY SALVAGEABLE MATERIALS.
6. COORDINATE DEMOLITION AND ITEMS TO BE REMOVED WITH NEW WORK AND ITEMS TO BE REPLACED OR
RELOCATED.
7. EXISTING ITEMS TO BE RELOCATED/REINSTALLED SHALL BE REMOVED, STORED, AND PROTECTED DURING
DEMOLITION ACTIVITIES AS REQUIRED FOR REINSTALLATION. ITEMS DAMAGED BY CONTRACTOR SHALL BE
REPLACED AT CONTRACTOR'S EXPENSE.
8. EXISTING ITEMS AND ADJACENT CONSTRUCTION TO REMAIN SHALL BE PROTECTED DURING DEMOLITION ACTIVITIES. ITEMS DAMAGED BY CONTRACTOR SHALL BE REPLACED AT CONTRACTOR'S EXPENSE.
9. PATCH AND REPAIR ANY DAMAGED EXISTING SURFACES TO REMAIN AS REQUIRED TO MATCH NEW WORK.
WHERE EXISTING WALLS ARE REMOVED, PATCH REMAINING WALLS TO MATCH EXISTING FINISH, FLUSH WITH
EXISTING, & PAINT.
ACOUSTICAL CEILING TILES TO BE SALVAGED.
COORDINATE W/ OWNER.
ALUMINUM T-GRID SYSTEM TO BE SALVAGED & REUSED
IN NEW ASSEMBLY TO THE EXTENT POSSIBLE. IF UNUSABLE,
COORDINATE POSSIBLE SALVAGE WITH OWNER OR DEMOLISH
& DISCARD.
LIGHT FIXTURE TO BE SALVAGED. COORDINATE
W/ OWNER.
CEILING TILES, ALUMINUM T-GRID SYSTEM
& LIGHT FIXTURES TO REMAIN.
10. CONTRACTOR SHALL PROVIDE ADEQUATE BRACING OF STRUCTURAL MEMBERS AND EXISTING/TEMPORARY STRUCTURES, AND PROVIDE ADDITIONAL SHORING DURING DEMOLITION OF EXISTING WALLS, AS REQUIRED
FOR THE DURATION OF THE PROJECT.
11. NO EXISTING STRUCTURAL MEMBERS ARE TO BE CUT, PENETRATED, OR OTHERWISE ALTERED WITHOUT PRIOR
WRITTEN APPROVAL OF ARCHITECT/ENGINEER.
12. THE OWNER SHALL BE RESPONSIBLE FOR THE RELOCATION AND STORAGE OF NON-FIXED EQUIPMENT AND
FURNISHINGS PRIOR TO THE START OF WORK.
13. THE BUILDING WILL BE IN USE FOR THE DURATION OF THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF WORK WITH OWNER'S ACTIVITIES AND OTHER TRADES INVOLVED WITH WORK AT THE
PROJECT SITE.
14. CONTRACTOR TO TAKE NECESSARY MEASURES TO LIMIT DUST & DIRT MIGRATION TO AREAS OUTSIDE WORK LOCATION. CONTRACTOR SHALL REPAIR ANY DAMAGE DUE TO EXISTING SURFACES DUE TO SUCH MEASURES
WITH FINISHES TO MATCH EXISTING.
15. CONTRACTOR SHALL PROVIDE AND MAINTAIN CLEAR PATHS OF EGRESS FOR THE DURATION OF THE WORK.
16. ANY REQUIRED MECHANICAL, ELECTRICAL, AND PLUMBING DEMOLITION TO BE PERFORMED IN, OR AFFECTING
THE USE OF, ADJACENT SPACES IN THE BUILDING SHALL BE COORDINATED WITH THE OWNER PRIOR TO THE
START OF WORK.
17. MAINTAIN WORKING CONDITION OF ANY EXISTING FIRE ALARM SYSTEMS AND COMPONENTS FOR THE
DURATION OF THE WORK.
18. EXISTING ELECTRICAL & FIRE ALARM SYSTEM DEVICES AFFECTED BY ALTERATIONS/ NEW WORK SHALL BE
RELOCATED AND ADJUSTED AS NECESSARY.
19. MAINTAIN ANY EXISTING FIRE RESISTANCE RATINGS OF STRUCTURAL ELEMENTS AND FIRE SEPARATION ASSEMBLY RATINGS INDICATED BETWEEN NEW WORK AND EXISTING AREAS AND OCCUPANCIES FOR THE
DURATION OF THE PROJECT.
20. DISPOSAL OF MATERIALS: CONTRACTOR SHALL DELIVER ALL SOLID WASTE COLLECTED ON PROJECT SITE TO
MONTGOMERY REGIONAL SOLID WASTE AUTHORITY TRANSFER STATION.
21. NOT ALL ELEMENTS REQUIRING DEMOLITION MAY BE SHOWN IN THE DEMOLITION PLAN. MAKE ARCHITECT
AWARE OF ANY SUCH CONDITIONS.
22. VERIFY ALL DEMOLITION AND SALVAGE WITH OWNER.
23. PROVIDE TEMPORARY BARRICADES & PROTECTIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO
ADJACENT FUNCTIONS WHICH ARE TO REMAIN. COORDINATE WITH OWNER.
TYPICAL
2 TYPICAL
DEMOLITION FLOOR PLAN NOT
TO SCALE
3 TYPICAL
5 REMOVE PORTION OF RATED MASONRY STAIR WALL FOR SPRINKLER
PIPING INSTALLATION. KEEP DIAMETER OF PENETRATION CLOSE TO THE
PIPE DIAMETER TO MINIMIZE ANNULAR SPACE DIMENSION FOR PROPER
TESTED FIRESTOPPING SYSTEM INSTALLATION.
REMOVE & SALVAGE ACT CEILING GRID. TURN OVER TO OWNER, TYP.
REMOVE CARPET THIS AREA COMPLETE. PREP SUBSTRATE TO RECEIVE
NEW CARPET INSTALLATION.
SEE ASBESTOS DISCLOSURE STATEMENT ON SHEET G100.
SEE ASBESTOS INSPECTION REPORT ON SHEET SP104.
REMOVE & REINSTALL EXST ACT CEILING TILE, CEILING GRID, & LIGHT
FIXTURES TO THE EXTENT NECESSARY TO INSTALL NEW SPRINKLER
PIPING.
7 DISASSEMBLE A PORTION OF THE EXISTING CUBICLE WALLS TO THE
EXTENT NECESSARY TO INSTALL NEW ADJACENT WALL FRAMING, GWB,
& PAINT. REASSEMBLE CUBICLE WALLS IN THE SAME LOCATION.
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
DEMOLITION
PLAN
AD101
JULY 2, 20261
GENERAL NOTES TO SHEET
1. REFER TO SHEET AD101 DEMOLITION PLAN WHEN REVIEWING THIS PLAN.
KEY NOTES TO SHEET
EXISTING STUDY CUBE TO REMAIN.
2. FURNITURE SHOWN FOR GRAPHIC/SPACE PLANNING PURPOSES ONLY.
FURNITURE NOT IN CONTRACT.
3. CONTRACTOR TO PROVIDE FIRE EXTINGUISHERS PER NFPA 10. SEE LIFE SAFETY PLAN G101.
4. REFER TO FINISH SCHEDULE FOR FINISH INFORMATION.
LEGEND
EXISTING DOOR TO REMAIN
NEW DOOR
NEW WALL WITH SOUND
ATTENUATION
EXISTING WALL
RE: DOOR SCHEDULEFLOOR PLAN - VIRTUAL STUDIO SUITE
SCALE 3/16" = 1'-0"1
A101
A301
A301
LED PANEL WALL - EXTENDS FROM FLOOR TO CEILING, NIC -
GC SHALL PROVIDE & COORDINATE POWER.
5. REFER TO DIMENSIONAL FLOOR PLAN A102 FOR NEW LAYOUT DIMENSIONS.
LIGHT GAGE ALUMINUM TRUSS ABOVE - ANCHOR TO STRUCTURE ABOVE,
INSTALL AT 8'-3" AFF TO BOTTOM OF TRUSS. SEE STRUCT. PROVIDE
ASSOCIATED POWER AT 7'-9" AFF TO CENTER OF DEVICES - SEE ELEC.
SEE SHEET A102 FOR DIMENSIONS.
4070D
VIRTUAL
PRODUCTION STAGE
4070A
COLLABORATION
ROOM
4070B
MOTION CAPTURE
SPATIAL AUDIO &
ROOM-SCALE VR
CONTROL &
MONITOR ROOM
4070F
IT ROOM
4070K
EXST
STUDY 01
4070J
EXST
STUDY 02
4070H
EXST
STUDY 03
4070G
EXST
STUDY 04
4070L
CIRC
A
B
B
C
B
1 1
1 1
4070C
VOLUMETRIC
CAPTURE STAGE
WALL-MOUNTED TV LOCATION - NIC. PROVIDE POWER & DATA AT 60"
AFF - SEE ELEC.
11111
WALL-MOUNTED CARD READER - OWNER-FURNISHED, CONTRACTOR INSTALLED.
MOUNT AT 36" AFF TO CENTER OF DEVICE. MOUNTED HORIZONTALLY 1'-0" FROM
INSIDE FACE OF DOOR FRAME TO CENTER OF DEVICE. PROVIDE
INFRASTRUCTURE IN WALL FOR LOW VOLTAGE WIRING.
LED PANELS AT CEILING TO COORD W/ TOP OF LED PANEL WALL, NIC -
GC SHALL PROVIDE & COORDINATE POWER & COORDINATE STRUCTURAL
SUPPORT. NO MECH OR ELEC DEVICES IN ACT ABOVE LED PANELS.
4 4
4 4
4 4 4 4
4 4
2 23
WALL-MOUNTED LIGHT GAGE ALUMINUM TRUSS,
GLOBAL TRUSS, F23 TRIANGULAR TRUSS, TR96105
WALL-MOUNTED LIGHT GAGE ALUMINUM TRUSS,
GLOBAL TRUSS, F32 IBEAM TRUSS, IB4052
7 8
SURFACE-MOUNTED ELECTRICAL PANEL - SEE ELEC.
36" DEEP x 30" WIDE PANEL CLEARANCE.
FLOOR-MOUNTED TRANSFORMER - SEE ELEC.
48" CLEARANCE IN FRONT OF TRANSFORMER.
FLOOR-STANDING SERVER RACK - NIC.
REASSEMBLE CUBICLE WALLS REMOVED TO FACILITATE NEW
ADJACENT WALL FRAMING, GWB, & PAINT INSTALLATION.
WALL-MOUNTED FIRE EXTINGUISHER.
10 11
A401.4 A101
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
FLOOR PLAN
A101
JULY 2, 2026
JULY 2, 2026
GENERAL NOTES TO SHEET
1. REFER TO DEMOLITION PLAN WHEN REVIEWING THIS PLAN.
LEGEND
EXISTING DOOR TO REMAIN
NEW DOOR
NEW WALL
EXISTING WALL
DIMENSIONAL FLOOR PLAN
SCALE 3/16" = 1'-0"1
A102
2. DIMENSIONS GIVEN ARE FROM FIELD OBSERVATIONS & REQUIRE CONTRACTOR
VERIFICATION.
3. DIMENSIONS GIVEN MAY VARY SLIGHTLY WITH EXISTING CONDITIONS & ARE SUBJECT
TO ALIGNING NEW AND EXISTING ARCHITECTURAL ELEMENTS PER ALIGNMENT NOTES.
KEY NOTES TO SHEET
ALIGN FACE OF WALL W/ FACE OF ADJACENT STOREFRONT STUDY
CUBICLE PARTITION
ALIGN FACE OF STUD WITH FACE OF EXISTING COLUMNS & PILASTERS.
EXTEND GYPSUM BOARD SHEATHING TIGHT TO FACE OF CHAMFERED
CORNER OF COLUMN. INSTALL SEALANT AT DISSIMILAR MATERIAL JOINT.
EQ
EQ
'-5
3 4"
2'-4"11'-51 4"
EQ
'-5
1 4"
EQ
20'-81 8" 24'-2"
8'-0"±
22'-43 8"±
EQ
EQ
18'-81 8"±
EQEQ
EQ
7'
-1 03 8"
EQ
'-2
5 8"
2 2
5'-0"6'-2"5'-05 8"±
2' -0
3'
-2
'-9
3 4"
1' -4
3' -1
0"
8'-01 2"28'-93
4"±6'-03 8"
9' -1
01 8" 1'
-1 15 8"
4' -1
1 2"
23'-71 2"±
5'-107 8"43'-31
2" 16'-71 2" 24'-2"
2' -0
4'
-8 7 8"
4' -6
4'
-2
2' -4
7 8"
1'-6"
40'-8"± EQEQ
3'-17 8"
2' -6
2'
-4 7 8"
5' -1
01 2"
'-1 1 4"
1'-0"
TYP
1' -0
6'-0"
3' -0
4070D
VIRTUAL
PRODUCTION STAGE
4070A
COLLABORATION
ROOM
4070B
MOTION CAPTURE
SPATIAL AUDIO &
ROOM-SCALE VR
CONTROL &
MONITOR ROOM
4070F
IT ROOM
4070K
EXST
STUDY 01
4070J
EXST
STUDY 02
4070H
EXST
STUDY 03
4070G
EXST
STUDY 04
4070L
CIRC
4070C
VOLUMETRIC
CAPTURE STAGE
2'-9"
TY
P
LED PANEL WALL - EXTENDS FROM FLOOR TO CEILING, NIC -
GC SHALL PROVIDE & COORDINATE POWER.
LIGHT GAGE ALUMINUM TRUSS ABOVE - ANCHOR TO STRUCTURE ABOVE,
INSTALL AT 8'-3" AFF TO BOTTOM OF TRUSS. SEE STRUCT. PROVIDE
ASSOCIATED POWER AT 7'-9" AFF TO CENTER OF DEVICES - SEE ELEC.
SEE SHEET A102 FOR DIMENSIONS.
LED PANELS AT CEILING TO COORD W/ TOP OF LED PANEL WALL, NIC -
GC SHALL PROVIDE & COORDINATE POWER & COORDINATE STRUCTURAL
SUPPORT. NO MECH OR ELEC DEVICES IN ACT ABOVE LED PANELS.
3 3
5 5 5
5 5
5 5 55
8'-7 9 16" 10'-7 9
16"
4' -1
9'
-9 3 4"
A401.4 A102
2' -8
5' -2
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
DIMENSIONAL
FLOOR PLAN
A102
JULY 2, 20261
REFLECTED CEILING PLAN
SCALE 3/16" = 1'-0"1
A201
GENERAL NOTES TO SHEET
1. COORDINATE REFLECTED CEILING PLAN WITH DEMOLITION PLAN
# KEY NOTES TO SHEET
1 LIGHT GAGE ALUMINUM TRUSS ABOVE - ANCHOR TO STRUCTURE ABOVE,
INSTALL AT 8'-3" AFF TO BOTTOM OF TRUSS.SEE STRUCT. PROVIDE
ASSOCIATED POWER AT 7'-9" AFF TO CENTER OF DEVICES - SEE ELEC.
SEE SHEET A102 FOR DIMENSIONS.
2. ALL CEILINGS ARE FINISHED AS 2'-4' ACT (ACOUSTICAL CEILING TILE) WITH FACILITY
STANDARD T GRID SYSTEM, UNO.
3. REFER TO AND COORDINATE THIS SHEET WITH ELECTRICAL DRAWING.
4. REFER TO FINISH SCHEDULE FOR FINISHES INFORMATION.
LEGEND
5. ALL DIMENSIONS GIVEN ARE BASED ON FIELD OBSERVATIONS.
CONTRACTOR TO FIELD VERIFY & NOTIFY ARCHITECT OF ANY DISCREPANCIES.
NEW 2X4 LIGHT FIXTURE, ACT & METAL
GRID SYSTEM
2 CENTER FIXTURE(S) AND/OR FIXTURE PATTERN ON ROOM.
EXISTING LIGHT FIXTURE & CEILING GRID
T SYSTEM TO REMAIN. ***NOTE: NOT ALL
EXISTING LIGHT FIXTURES SHOWN. SOME
MODIFICATIONS REQUIRED TO WORK
WITH ADDITION OF VIRTUAL STUDIO
SUITE. CONTACT ARCHITECT FOR
CLARITY & CONFLICTS.
EXISTING WALL
0'-0"+/-
CEILING HEIGHT TAG
10'-0"+/-
10'-0"+/-
10'-0"+/-
10'-0"+/-
10'-6"
10'-0"+/-
EXIST
10'-0"+/-
EXIST
10'-0"+/-
EXIST
10'-0"+/-
EXIST
10'-0"+/-
EXIST
3 EXIT SIGN - SEE ELEC.
NEW WALL 4 PAINTED GWB BULKHEAD - BOTTOM OF BULKHEAD AT TOP OF CUBICLE WALL.
5 CEILING CONDITIONS NOT SHOWN THIS ROOM OR SPACE.
5 5
6 LED PANEL WALL - EXTENDS FROM FLOOR TO CEILING, NIC -
GC SHALL PROVIDE & COORDINATE POWER.
7 LED PANELS AT CEILING TO COORD W/ TOP OF LED PANEL WALL, NIC -
GC SHALL PROVIDE & COORDINATE POWER & COORDINATE
STRUCTURAL SUPPORT. NO MECH OR ELEC DEVICES IN ACT ABOVE
LED PANELS.
8 COORDINATE LIGHT FIXTURES, MECHANICAL DIFFUSERS, & DUCTWORK
WITH LED PANEL SUPPORTS.
8 8
'-0
28'-0"
4' -0
4'
-8 7 8"
7'-53 8" 7'-53
8"
4070D
VIRTUAL
PRODUCTION STAGE
4070A
COLLABORATION
ROOM
4070B
MOTION CAPTURE
SPATIAL AUDIO &
ROOM-SCALE VR
CONTROL &
MONITOR ROOM
4070F
IT ROOM
4070K
EXST
STUDY 01
4070J
EXST
STUDY 02
4070H
EXST
STUDY 03
4070G
EXST
STUDY 04
4070L
CIRC
4070C
VOLUMETRIC
CAPTURE STAGE
EQ
EQ
9 SHADED REGION INDICATES CENTER PORTION OF ROOM ACT CEILING TO BE
INSTALLED AS A SEPARATE INSTALLATION FROM REMAINDER OF ACT
CEILING AROUND ROOM PERIMETER. THIS ACT CEILING IS REMOVABLE TO
PROVIDE OPENING FOR FUTURE INSTALLATION OF CEILING LED PANELS.
10 PAINT ALL ABOVE-CEILING ELEMENTS BLACK, INCLUDING BOTTOM OF
STRUCTURE ABOVEM TO MINIMIZE VISIBILITY - ENTIRE ROOM VP-01.
11 REINSTALL EXST SALVAGED ACT CEILING TILE, CEILING GRID, & LIGHT
FIXTURES REMOVED TO FACILITATE NEW SPRINKLER PIPING INSTALLATION.
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
REFLECTED
CEILING PLAN
A201
INTERIOR ELEVATION
SCALE 1/4" = 1'-0"1
A301
4TH FLOOR
5TH FLOOR
ACT CEILING
10'-0"
INTERIOR ELEVATION
SCALE 1/4" = 1'-0"2
A301
4TH FLOOR
5TH FLOOR
ACT PLANE
@ 10'=0" AFF
1 1/2" = 1'-0"
WALL/PARTITION DETAILSA301
3" SOUND ATTENUATION
BATTS
SPECIFIED
ACOUSTICAL
CLNG TILE &
ALUM GRID
FRAME SYSTEM
METAL STUDS - ACOUSTICAL
BACKER ROD &
ACOUSTICAL SEALANT
STRUCTURE ABOVE
FLOOR & BASE AS
SCHEDULED
DESCRIPTION: 3 5/8" METAL STUD W/ 5/8" GWB BOTH
FACES W/ 3" THICK SOUND ATTENUATION BATTS.
ACOUSTICAL SEALANT APPLIED UNDER THE EDGE OF GWB
ON BOTH SIDES. 3" SOUND ATTENUATION BATTS
EXTENDING 4'-0" OVER ACT CEILING ON EACH SIDE OF
PARTITION.
TYP WALL/PARTITION HEAD CONDITION
TYP WALL/PARTITION BASE CONDITION
3" SOUND
ATTENUATION BATTS -
EXTEND 4'-0" ON BOTH
SIDES OF WALL
SPECIFIED
ACOUSTICAL
CLNG TILE &
ALUM GRID
FRAME SYSTEM
1'-0"4'-0"
4'-0"
TOP OF WALL BRACING -
SEE DETAIL 3S1-1.
4070D
VIRTUAL
PRODUCTION STAGE
4070A
COLLABORATION
ROOM
CONTROL &
MONITOR ROOM
4070F
IT ROOM
EXST COLUMN
EXST STRUCTURE
EXST COLUMN EXST COLUMN EXST COLUMN
EXST STRUCTURE
EXST STRUCTURE
EXST STRUCTURE
28'-93
4"± LED PANEL WALL INSTALLATION - NIC
'-3
5 8"
'-6
'-0
TY
P
'-6
" C
EI
LI
N
G H
EI
G
H T
'-0
" T
YP
C
EI
LI
N
G H
T
'-6
SEE 3A301 FOR TYP
BASE OF WALL DETAIL
EXST STUDY CUBEEXST CIRC EXST CIRC
TYP
TYP
EXST COLUMN
EXST CIRC
CONTROL &
MONITOR ROOM
4070C
VOLUMETRIC
CAPTURE STAGE
'-0
TY
P
'-0
" T
YP
C
EI
LI
N
G H
T
WORK AREA
WORK AREA
3' -0
1'-0"
CARD READER -
OFCI
CARD READER - OFCI
A
B
8' -3
AF
F
LED PANELS AT CEILING - NIC
UNISTRUT SUPPORT - SEE STRUCT -
COORD SUPPORT INSTALLATION W/
LED CEILING INSTALLATION
LIGHT GAGE ALUMINUM TRUSS,
GLOBAL TRUSS, F34 SQUARE TRUSS -
ANCHOR TO STRUCTURE ABOVE - SEE STRUCT.
WALL-MOUNTED
LIGHT GAGE ALUMINUM TRUSS,
GLOBAL TRUSS, F32 IBEAM TRUSS
IB4052
WALL-MOUNTED
LIGHT GAGE ALUMINUM TRUSS,
GLOBAL TRUSS, F23 TRIANGULAR TRUSS
TR96105
7'-53 8" 28'-0"
PERMANENT ACT
7'-53
8"
PERMANENT ACTACT FOR FUTURE REMOVAL
6'-03 8"
TOP OF WALL BRACING, TYP -
SEE DETAIL 3S1-1.
EXST
COLUMN
TOP OF WALL BRACING, TYP -
SEE DETAIL 3S1-1.
TOP OF WALL BRACING, TYP -
SEE DETAIL 3S1-1.
TOP OF WALL BRACING, TYP -
SEE DETAIL 3S1-1.TOP OF WALL BRACING, TYP -
SEE DETAIL 3S1-1.
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
ELEVATIONS &
SECTIONS
A301
G W
B/
PA
IN
T
EX
IS
T
TO
R
EM
AI
N
EX
IS
T
TO
R
EM
AI
N
NO. FLOOR BASE WALLS CEILING CLG.
HT. NOTESROOM NAME
EX
IS
T
TO
R
EM
AI
N
CA
RP
ET
IN
G
RU
BB
ER
B
AS
E
ROOM FINISH SCHEDULE
VIRTUAL PRODUCTION STAGE4070D
4070C 4070B 4070A
EX
IS
T
TO
R
EM
AI
N
10'-6"
AC
T/
TG
RI
D
10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
ROOM FINISH LEGEND
CARPETING:
RUBBER BASE:
PAINT (GWB WALLS):
ACT/TGRID:
SEE CARPET SPECIFICATION 09 6813.
SEE CARPET SPECIFICATION 09 6813.
MATCH ADJACENT EXISTING.
2x4 ACOUSTICAL CEILING TILE
ROOM FINISH NOTES
& GRID SYSTEM.
1. ALL FINISHES SHALL BE IN COMPLIANCE WITH
FINISH SPECIFICATIONS REQUIREMENTS PER
THE VIRGINIA TECH 2023 DESIGN AND
CONSTRUCTION STANDARDS MANUAL AKA THE
'ORANGE MANUAL' & THE VIRGINIA TECH
CONSTRUCTION AND PROFESSIONAL SERVICES
MANUAL (2020) OR THE 'MAROON MANUAL'.
4070L 4070F 4070G 4070H 4070J 4070K
VOLUMETRIC CAPTURE STAGE
MOTION CAPTURE SPATIAL AUDIO & ROOM SCALE VR
COLLABORATION ROOM
CONTROL & MONITOR ROOM
CIRC
IT ROOM
EXST STUDY 04
10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
EXST STUDY 03
EXST STUDY 02
EXST STUDY 01
PARTITION TYPES
1 3 5/8" METAL STUD WALL W/
5/8" GWB EACH SIDE
8" UNDERSIDE OF
STRUCTURE
CEILING AS SCHEDULED
FLOOR & BASE
AS SCHEDULED
5/8" GWB / CEMENT BD
EACH SIDE OF 20 GA.
3 5/8" METAL STUDS
@ 16" O.C.
NOTES:
1' -0
3" SOUND ATTENUATION
BATT INSULATION (SAFB)
1. NON-STRUCTURAL / NON-LOADBEARING FRAMING
SHALL BE 20 GAGE.
2. FOR FRAMING, FASTENER, & CONNECTION
INFORMATION SEE SPECIFICATION SECTION 09 2116.
3. FOR PARTITIONS W/ SAFB INSULATION, INSTALL
ACRYLIC EMULSION LATEX SEALANT PER
SPECIFICATION SECTION 07 9200.
TOP OF WALL BRACING -
SEE DETAIL 3S1-1.
DOOR SCHEDULE
MARK
DOOR FRAME
FIRE
RATING T'HOLD HDW REMARKS
SIZE
MATERIAL TYPE FINISH GLASS
ACCESS
CONTROL TYPE MATERIAL
DETAIL
WIDTH HEIGHT THICK J. H.
101 3'-0" 7'-0" 1-3/4" SCW F STAIN - Y F-1 HM 1 2 - - 1
102 3'-0" 7'-0" 1-3/4" SCW F STAIN - Y F-1 HM 1 2 - - 1 NOTE 1.
103 3'-0" 7'-0" 1-3/4" SCW F STAIN - Y F-1 HM 1 2 - - 1
104 3'-0" 7'-0" 1-3/4" SCW F STAIN - Y F-1 HM 1 2 - - 2
105 3'-0" 7'-0" 1-3/4" SCW FG STAIN G-1 Y F-1 HM 1 2 - - 3
106 3'-0" 7'-0" 1-3/4" SCW FG STAIN G-1 Y F-1 HM 1 2 - - 3 NOTE 1.
107 3'-0" 7'-0" 1-3/4" SCW L STAIN - - F-1 HM 1 2 - - 4
NOTES:
NOTE 1: PROVIDE 180° DOOR SWING.
DOOR FRAME TYPES
SCALE: 1/4" = 1'-0"
F-1 HM FRAME
2"
SE
E
SC
H
ED
U
LE
2" W
2"
SEE
SCHED
SCALE: 1/4" = 1'-0"
F
FLUSH
H
SE
E
SC
HE
DU
LE
W
SEE SCHED
FG
FULL GLASS
H
SE
E
SC
HE
DU
LE
W
SEE SCHED
G-1
DOOR TYPES
L
LOUVER
H
SE
E
SC
HE
DU
LE
W
SEE SCHED
1' -0
" METAL
LOUVER
2'-0" 1' -4
A
SCALE: 1/4" = 1'-0"
INTERIOR WINDOWS
3' -0
4'
-2
6'-0"
7' -2
G-1
NOTE 1: HM FRAME,
FULLY-TEMPERED SAFETY GLASS.
B
3' -0
4'
-2
4'-0"
7' -2
G-1
C
3' -0
4'
-2
2'-6"
7' -2
G-1
A401.3
A401.1
A4
.2
A401.1 A401.1
A401.3 A401.3
A4
.2
A4
.2
METAL STUD FRAMING
METAL STUD HEADER
5/8" GWB
HM FRAME & STOP -
PAINT
SEALANT
5/8" GWB
HEAD
SEALANT
8"
4"
2"
G-1 GLAZING
3" SAFB
INSULATION
2"
HM FRAME & STOP -
PAINT
JAMB ANCHOR
5/8" GWB
METAL STUD
FRAMING
5/8" GWB
SEALANT JAMB
1 2" 1 2"
47 8"
G-1 GLAZING
3" SAFB
INSULATION
METAL STUD FRAMING
5/8" GWB
HM FRAME & STOP-
PAINT
SEALANT
3" SAFB
INSULATION
SILL
SEALANT
8"
2"
4"
5/8" GWB
G-1 GLAZING
PAINTED
5/8" GWB
METAL STUD
FRAMING
PAINTED
5/8" GWB
CORNER BEAD -
BOTH CORNERS,
FINISH & PAINT
2"
EDGE OF
CUBICLE
DRAWN BY:
DATE:
CHECKED BY:
COMMISSION No.
SHEET
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
RE
VI
SI
O
N S
E
LE
CT
RI
C
RO
AD
R O
AN
O
KE
, V
IR
GI
N
IA
SU
IT
E
0.
2.
w w w .H ug he sA E.
co m
H U
G H
ES
AS
SO
CI
AT
ES
A
RC
H
IT
EC
TS
E
N G
IN
EE
RS
VI
RG
IN
IA
T
EC
H
DR
IL
LF
IE
LD
D
RI
VE
, B
LA
CK
SB
U
RG
, V
IR
GI
N
IA
4T H
FL
R
VI
RT
U
AL
S
TU
DI
O
E
XP
AN
SI
O N
CA
RO
L M
. N
EW
M
AN
L
IB
RA
RY
MTH
ASE
APR 30, 2026
ANTHONY SHAWN
EMMONS
4/30/26
SCHEDULES &
DETAILS
A401SCALE:
INT WINDOW SILLA401.3
A401 1-1/2" = 1'-0"
SCALE:
INT WINDOW JAMBA401.2
A401 1-1/2" = 1'-0"SCALE:
INT WINDOW HEADA401.1
A401 1-1/2" = 1'-0"
JULY 2, 20261
SCALE:
PLAN DETAILA401.4
A101 3" = 1'-0"
RETURN/EXHAUST CFM
REGISTER WIDTH
REGISTER HEIGHT
200/0808
CR
AIR DEVICE TYPE
NOTE: SIZING FOR GRILLES SIMILAR
REGISTER SIZING
NO SCALE
LATERAL BRANCH
DUCT DETAIL
SCHEMATIC
NOTE:
PROVIDE MD ONLY WHERE INDICATED ON DRAWINGS.
SINGLE LINE
REPRESENTATION
AIR
FLOW
AIR
FLOW
MD
L = 1/4W, 4" MIN.
L
DUCT SIZE AS
SHOWN ON PLAN
MANUAL
DAMPER
AIR
FLOW
W
45°
AIR FLOW
SUPPLY CFM DIFFUSER NECK SIZE
DIFFUSER FACE SIZE
300/0824
DIFFUSER SIZING
NO SCALE
SEAL ALL AROUND
WITH DUCT MASTICDUCT
SUPPLY
RIGID
NO SCALE
FLEX BRANCH FITTING DETAIL
METAL BAND CLAMP
WITH INSULATION
FLEXIBLE DUCT
ALL AROUND
SEAL AIR TIGHT
A
IR
F
LO
W
PIPE INSULATION
(WHERE REQUIRED)
WALL
GALVANIZED
STEEL PIPE
SLEEVE
WALL
PIPE
1/4" SPACE BETWEEN
SLEEVE & INSULATION
NOTE:
WHERE PIPES PENETRATE FIRE-RATED WALLS, FILL SPACE BETWEEN PIPE
AND SLEEVE WITH A FIRE-RESISTANT MATERIAL WITH SUFFICIENT RATING TO
MAINTAIN THE FIRE RATING OF THE WALL. WHERE PIPE PENETRATE
EXTERIOR WALLS, FILL SPACE BETWEEN PIPE AND SLEEVE WITH FIBERGLASS
INSULATION AND AS REQUIRED FOR NEW AND EXISTING FIRE RATINGS.
WALL PIPE SLEEVE DETAIL
NO SCALE
PIPE PENETRATION FIRESTOP DETAIL
NO SCALE
System No. W-J-5140
SECTION A-A
1. Wall Assembly — Min 3-3/4 in. (95 mm) and 5 in. (127 mm) thick reinforced lightweight or normal weight
(100-150 pcf or 1600 2400 kg/m³) concrete for 1 and 2 hr rated assemblies, respectively. Wall may also be constructed of any UL Classified Concrete Blocks*. The max diam of the opening is dependent upon the type through penetrant installed within the firestop system as shown in Item 4.
See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers.
2. Steel Sleeve — (Optional) Max 18 in. (457 mm) diam Schedule 40 (or heavier) steel pipe sleeve cast in or grouted into wall, flush with both surfaces of wall assembly.
3. Through Penetrant — One metallic pipe or tubing installed concentrically or eccentrically within the firestop system. Pipe or tube to be rigidly supported on both sides of wall assembly. The following types and sizes of metallic pipes or tube may be used:
A. Steel Pipe — Nom 12 in. (305 mm) diam (or smaller) Schedule 40 (or heavier) steel pipe. When steel pipe is used, T Rating is 1/2 hr.
B. Copper Tube — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tube. When copper tube is used, T Rating is 1/2 hr and 1 hr when installed in 1 and 2 hr rated walls, respectively.
C. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) Regular (or heavier) copper pipe. When copper pipe is used, T Rating is 1/2 and 1 hr when installed in 1 and 2 hr rated walls respectively.
4. Pipe Covering* — Max. 2 in. (51 mm) thick hollow cylindrical heavy density (min 3.5 pcf or 56 kg/m³) glass fiber units, jacketed on the outside with an all service jacket. Longitudinal joints sealed with metal fasteners or factory-applied SSL tape. Transverse joints secured with metal fasteners or with butt tape supplied with the product. When pipe covering thickness is less than 2 in., T Rating is 0 hr.
See Pipe and Equipment Covering-Materials (BRGU) category in the Building Materials Directory for names of manufacturers. Any pipe covering material meeting the above specifications and bearing the UL Classification
Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.
The min and max annular space of the firestop system is dependent on the type and max diam of the through penetrant used as shown in the table below:
A
F Ratings — 1 and 2 Hr (See Items 1 and 4) T Ratings — 0, 1/2, and 1 Hr (See Item 3 and 4)
6. Fill, Void or Cavity Material*-Sealant — Min 5/8 in. (16 mm) thickness of fill material applied within annulus, flush with both surfaces of wall. At point contact, an additional 1/2 in. (13 mm) bead of sealant shall be applied to the insulated pipe/wall interface on both surfaces of wall.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-ONE Sealant or FS-ONE MAX Intumescent Sealant
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification
(such as Canada), respectively.
C
C
LA
SS IF IED
Classified by Underwriters Laboratories, Inc.
to UL 1479 and CAN/ULC-S115
US
Through Penetrant
Type
Max Diam, In., (mm)
Min Annular
Space, In. (mm)
Max Annular
Space, In. (mm)
Steel Pipe 12 (305) 0 (0) 1/2 (13)
Copper Pipe or Tube 6 (152) 0 (0) 1-7/8 (48)
A
5 DIA'S 5 DIA'S
CS (GPM)
NOTE:
1. THERE SHALL BE UNINTERRUPTED STRAIGHT PIPE 5 DIAMETERS OF
PIPE DOWNSTREAM AND 5 DIAMETERS OF PIPE UPSTREAM FROM
EACH CIRCUIT SETTER.
2. THE ENTIRE CIRCUIT SETTER SHALL BE INSULATED WITH REMOVABLE
SECTIONS OF PIPE INSULATION SIZED TO OVERLAP THE CONNECTED
PIPE INSULATION. INSULATION SHALL OVERLAP 3 INCHES. DUAL
TEMPERATURE WATER SYSTEMS SHALL BE VAPOR SEALED.
CIRCUIT SETTER DETAIL
SCHEMATIC
PIPE SUPPORT DETAIL
NO SCALE
PIPE
12" LONG, HALF-SECTION OF
HYDROUS CALCIUM SILICATE
AT EACH HANGER SUPPORT
HEAVY DUTY
CLEVIS HANGER
HANGER ROD, SUPPORT
FROM BUILDING STRUCTURE
INSULATION
16 GAGE ZINC COATED
SHEET STEEL SADDLE
AT LEASE 12" LONG
NOTE:
SADDLE AND HALF-SECTION OF HYDROUS CALCIUM SILICATE
SHALL BE INSTALLED AT THE SAME TIME THAT THE PIPE AND
PIPE HANGERS ARE INSTALLED.
MANUAL DAMPER
MANUAL DAMPER
B(7")*
DUCT SIZE AS
SHOWN ON PLAN
CFM-B(600 CFM)*
A(36")*
(2400 CFM)
CFM-A(3000 CFM)*
B(7")*
3000 CFM
= 7.2"
SAY B = 7"(7.2" ROUNDED OFF TO THE NEAREST 1/2)
B = X A
CFM-B
CFM-A
B =
600 CFM
X 36"
CFM-A = 3000 CFM
CFM-B = 600 CFM
A = 36"
* EXAMPLE;
A - WIDTH OF DUCT MAIN BEFORE TEE.
B - WIDTH OF GIVEN BRANCH.
CFM-A - TOTAL AIR QUANTITY PASSING THRU DUCT AT A,
CFM-B - AIR QUANTITY REMOVED AT TAKEOFF B.
NOTE:
PROVIDE MD ONLY WHERE INDICATED ON DRAWINGS.
TEE-BRANCH DUCT DETAIL
SCHEMATIC
TYPICAL DRAW
THROUGH
AC-UNIT
UNION (TYP.)
DRAIN TO EXTEND TO
NEAREST FLOOR DRAIN
UNLESS NOTED OTHERWISE
DRAIN TO BE FULL SIZE
OF UNIT CONNECTION
EQUAL TO FAN TOTAL STATIC
PRESSURE INCHES WATER
COLUMN + 1" (1" MINIMUM)SLOPE DOWN
TRAP
COOLING COIL CONDENSATE DRAIN
NO SCALE
CLEAN OUT
CLEAN OUT
EQUAL TO 1/2 OF FAN TOTAL
STATIC PRESSURE INCHES
WATER COLUMN + 1"
BLOWER COIL UNIT
CONNECTION DETAIL
NO SCALE
DRAIN PAN
CCCD
MAV
MAV
COOLING COIL
HEATING COIL
CWR
CWS
HWR
HWS
P/T PORT
(TYP)
LOW-LOSS
BRANCH FITTING
MANUAL
DAMPER
H
W SUPPLY
AIR
OUTSIDE
AIR
FAN SPEED
BLOWER COIL UNIT
SCHEMATIC (PROVIDE A NEW GRAPHIC)
FAN S/S
T-1
SPACE
TEMP/RH
COMMUNICATIONS
FROM EXISTING BAS
DISCONNECT
120 VAC
T-1 SPACE TEMP/RH
V-1
SUPPLY FAN S/S
SUPPLY FAN SPEED
CWR
CWS
V-1
V-2
C
W
HWR
HWS
V-2
SD
DUCT SMOKE DETECTOR
(2000 CFM OR GREATER)
BLOWER COIL UNIT
DIGITAL CONTROLLER
(FACTORY MOUNTED
AND WIRED)
SD
SUPPLY FAN ALARM
CONDENSATE OVERFLOW
COND. OVRFLW
NEW LOCAL CONTROL
PANELS. QUANTITY
AS REQUIRED
OA TEMPERATURE AND
HUMIDITY SHARED WITH
ALL PANELS THROUGH
COMMUNICATIONS
EXISTING BAS
SERVER
EXISTING NETWORK COMMUNICATIONS
SCHEMATIC
CS
CS
GENERAL NOTES:
1. ALL DUCTWORK AND PIPES SHALL BE COORDINATED WITH OTHER NEW AND
EXISTING DUCTS, PIPES, LIGHTS, STRUCTURAL SYSTEM, CEILING SUPPORTS AND
FRAMING BEFORE INSTALLATION. MINOR DUCT AND PIPE OFFSETS AND MINOR
DUCT TRANSITIONS SHALL BE PROVIDED AS REQUIRED. WHERE TRANSITIONS ARE
REQUIRED, CROSS SECTIONAL AREA OF DUCT SHALL NOT BE REDUCED.
MEASUREMENTS FOR VERTICAL CLEARANCES OF DUCTWORK SHALL BE TAKEN AT
THE JOB SITE BEFORE FABRICATION OF ANY DUCTWORK.
2. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
PUBLISHED INSTRUCTIONS.
3. MATERIALS AND INSTALLATION SHALL COMPLY WITH LOCAL CODES, APPLICABLE
PROVISIONS OF LATEST EDITION OF NATIONAL FIRE PROTECTION ASSOCIATION,
LOCAL UTILITY REGULATIONS AND GOVERNMENTAL DEPARTMENTS HAVING
JURISDICTION.
4. CONTRACTOR SHALL SEAL PENETRATIONS IN EXISTING WALLS AS REQUIRED TO
COMPLY WITH EXISTING WALL RATINGS.
5. VERIFY WALL OPENINGS WITH STRUCTURE.
6. VERIFY THE FINAL LOCATION OF ALL THERMOSTATS, TEMPERATURE SENSORS,
PANELS AND CONTROL INSTRUMENTS WITH THE ARCHITECT AND OWNER PRIOR TO
ROUGH-IN.
7. VERIFY LOCATIONS OF NEW AND EXISTING EQUIPMENT AND ROUTE OF DUCTWORK
WITH EXISTING CONDITIONS.
8. ALL CUTTING AND PATCHING FOR THE INSTALLATION OF NEW WORK IN EXISTING
BUILDING SHALL BE DONE BY THE GENERAL CONTRACTOR.
9. REFER TO ARCHITECTURAL, STRUCTURAL AND ELECTRICAL DRAWINGS TO
COORDINATE THE EXACT LOCATIONS OF DIFFUSERS, REGISTERS, GRILLES, PIPING
AND OTHER MECHANICAL EQUIPMENT WITH CEILING GRID, LIGHTS, BEAMS AND
OTHER BUILDING COMPONENTS.
10. CONTRACTOR SHALL PROVIDE AND INSTALL ALL SUPPORTS REQUIRED TO MOUNT
MECHANICAL EQUIPMENT, PIPING AND DUCTWORK.
11. WHERE PIPE AND DUCT CONNECTIONS ARE SHOWN CONNECTING TO EXISTING,
CONTRACTOR SHALL DETERMINE EXACT LOCATIONS AND CONNECTION SIZES
PRIOR TO INSTALLATION.
12. DUCTWORK SHALL BE G-90 ZINC-COATED SHEET STEEL OR ALUMINUM,
CONSTRUCTED AND INSTALLED AS RECOMMENDED BY THE LATEST EDITION OF
SMACNA "HVAC DUCT CONSTRUCTION STANDARDS". COAT ALL INTERIOR SURFACES
OF RIGID FABRICATED AND PRE-MANUFACTURED DUCT AND ACCESSORIES WITH
ONE COAT OF FOSTER 40-20 FUNGICIDAL PROTECTIVE FINISH AS MANUFACTURED
BY FOSTER PRODUCTS CORPORATION OR PROVIDE DUCTWORK WITH AGION
ANTI-MICROBIAL COATED STEEL/ALUMINUM.
13. FLEXIBLE DUCTS SHALL BE FLEXIBLE METAL OR METAL AND NEOPRENE-COATED
CANVAS HOSE INSULATED WITH 1" THICK FIBERGLASS WITH VINYL VAPOR BARRIER.
ALL ROUND DUCT TAKE-OFFS SHALL BE MADE WITH SPIN-IN FITTINGS WITH 45 DEG.
EXTRACTOR AND BALANCING DAMPER. THE DUCT DIAMETER SHALL MATCH THE AIR
DIFFUSER SIZE UNLESS OTHERWISE INDICATED.
14. PROVIDE FLEXIBLE DUCT CONNECTIONS BETWEEN THE SUPPLY AND RETURN
DUCTS FROM THE AIR UNITS. FLEXIBLE CONNECTIONS SHALL BE WEATHERTIGHT
WHEN EXPOSED.
15. PROVIDE AIR TIGHT SEAL BETWEEN DUCTWORK AND FIRE PARTITIONS/WALLS WITH
FIRE RESISTANT MATERIAL.
16. SUPPLY AIR DUCTWORK SHALL BE INSULATED WITH 1 LB. DENSITY, FLEXIBLE TYPE,
1-1/2" THICK WITH FACTORY APPLIED FACING OF 0.7 MIL FOIL-SCRIM-WHITE KRAFT
PAPER JACKET EFFECTIVELY VAPOR SEALED.
17. NEW DUCT AND PIPE INSULATION SHALL BE AS SPECIFIED AND SHALL BE SEALED TO
EXISTING. INSULATION THAT IS DAMAGED OR REMOVED FOR NEW WORK SHALL BE
REPLACED, REPAIRED AND SEALED AS REQUIRED.
18. ALL CEILING DIFFUSERS SHALL BE 4-WAY THROW TYPE UNLESS NOTED OTHERWISE.
19. CEILING DIFFUSERS SHALL BE PRICE SQUARE LOUVER FACE, LAY-IN, ADJUSTABLE
TYPE COMPLETE WITH EQUALIZING DEFLECTORS AND VOLUME CONTROL UNITS
(RADIAL BLADE TYPE ARE NOT ACCEPTABLE. FINISH SHALL BE WHITE.
20. RETURN GRILLES AND REGISTERS SHALL BE PRICE SERIES 635, 45 DEGREE
DEFLECTION. DAMPERS FOR REGISTERS SHALL BE FACE OPERATED AND OPPOSED
BLADE TYPE.
21. AIR DEFLECTORS SHALL BE INSTALLED IN ALL SQUARE ELBOWS.
22. CEILING GRID AND OTHER ITEMS SHALL NOT BE SUPPORTED FROM OR IN CONTACT
WITH MECHANICAL EQUIPMENT. CONDUIT, WIRING, PIPING AND SUPPORTS SHALL
NOT BE LOCATED IN FRONT OF FAN COIL ACCESS PANELS.
23. DUCTWORK AND PIPING SHALL NOT BE INSTALLED ABOVE ELECTRICAL PANELS.
COORDINATE INSTALLATION OF DUCTWORK AND PIPING WITH ELECTRICAL PANELS
WHEN SHOWN NEAR PANELS OR OVER ELECTRICAL ROOMS.
24. INSTRUCT THE OWNER IN THE PROPER OPERATION AND MAINTENANCE OF THE
MECHANICAL SYSTEMS UNTIL THE OWNER IS FULLY PREPARED TO OPERATE AND
MAINTAIN THE MECHANICAL SYSTEM. HOWEVER, LENGTH OF INSTRUCTION TIME
SHALL BE LIMITED TO ONE DAY.
25. EQUIPMENT, MATERIALS AND LABOR REQUIRED BY THESE CONTRACT DRAWINGS
SHALL BE GUARANTEED TO BE FREE FROM DEFECTIVE MATERIALS OR
WORKMANSHIP FOR ONE YEAR AFTER FINAL ACCEPTANCE OF THE PROJECT
UNLESS SPECIFIED OTHERWISE. DEFECTIVE MATERIALS OR WORKMANSHIP
OCCURRING DURING THIS PERIOD SHALL BE CORRECTED AT NO ADDITIONAL COST.
26. PROVIDE 12" LONG STEEL SLEEVE, STEEL RETAINING ANGLES, AND ACCESSORIES
REQUIRED BY IMC 607.5.3, EXCEPTION 3 FOR DUCTS THAT PENETRATE FIRE
PARTITIONS. ANNULAR SPACE BETWEEN THE SLEEV AND WALL OPENING SHALL BE
FILLED WITH ROCK WOOL BATTING ON ALL SIDES.
DEMOLITION NOTES:
1. THE CONTRACTOR SHALL REMOVE OR ALTER AS NECESSARY ALL EXISTING
PIPING, EQUIPMENT, EQUIPMENT FOUNDATIONS, AND APPURTENANCES THAT ARE
NOT REQUIRED FOR THE EXISTING SYSTEMS TO REMAIN. CONTRACTOR SHALL
VISIT THE SITE TO DETERMINE THE SCOPE OF THIS WORK AND VERIFY EXISTING
CONDITIONS PRIOR TO SUBMITTING BIDS.
2. EXISTING EQUIPMENT SHALL BE TURNED OVER TO THE OWNER, UNLESS
DIRECTED OTHERWISE AND LOCATED AS DIRECTED BY THE OWNER. ALL OTHER
ITEMS TO BE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR
AND REMOVED FROM THE PREMISES.
3. INSULATION ON EXISTING PIPING THAT IS DAMAGED OR REMOVED DUE TO THE
DEMOLITION WORK SHALL BE REPLACED AND SEALED AS REQUIRED TO PROVIDE
CONTINUOUS COVERAGE.
h
PRE-CONSTRUCTION BALANCING:
1. THE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION TESTING AND
BALANCING REPORT FOR THE FOURTH FLOOR WING INDICATED ON THE PLANS.
REPORT SHALL INCLUDE MEASURED FLOWS FOR ALL AIR DEVICES AND DUCT
BRANCHES SHOWN AND FOR THE EXISTING CHILLED AND HEATING WATER PIPING
RISERS AND BRANCHES SHOWN ON THE PLANS. WATER BALANCING SHALL
INCLUDE CONFIRMATION OF DIRECTION OF FLOW FOR ALL LINES IN THE EXISTING
RISER. REPORT SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER AND TO VT
OPERATIONS PRIOR TO DEMOLITION.
HVAC LEGEND
ABOVE ABV
ABOVE FINISHED FLOOR AFF
AIR CONDITIONING UNIT AC
AIR HANDLING UNIT AHU
ANCHOR
BELOW BEL
BETWEEN BET
CAPACITY CAP
CEILING CLG
CEILING GRILLE CG
CEILING REGISTER CR
CHECK VALVE
CHILLED WATER RETURN PIPE CWRCWR
CHILLED WATER SUPPLY PIPE CWS CWS
CIRCUIT SETTER
CS(GPM)
CLEANOUT COCO
COMMON C
CONTROL SWITCH S
COOLING COIL CONDENSATE DRAIN PIPE CCCD D
CUBIC FEET PER MINUTE CFM
DEGREES FAHRENHEIT °F
DIAMETER DIA
DIRECTION OF FLOW
DIRECTION OF SLOPE DOWN
DOWN DN
DRY BULB DB
DUCT SLOPE DOWN DN
DUCT SLOPE UP UP
DUCT TRANSITION
DUCTWORK (NEW)
ACOUSTIC LINED
RETURN & EXHAUST
SUPPLY
WATERTIGHT
DUCTWORK (EXISTING TO REMAIN) EX
RETURN EX R
EXHAUST EX E
SUPPLY EX S
DUCTWORK (EXISTING TO BE REMOVED)
EACH EA
ENTERING AIR TEMPERATURE EAT
ENTERING WATER TEMPERATURE EWT
EXISTING, REMOVE FROM THIS POINT
FAN COIL UNIT FC
FEET FT
FEET PER MINUTE FPM
FIRE DAMPER FD
FIRE/SMOKE DAMPER FSD
FIRESTAT FS
FLEXIBLE DUCT CONNECTION
FLEXIBLE DUCT RUNOUT
FLEXIBLE PIPE CONNECTION
FLOOR FL
FLOW SWITCH FSW FSW
FREEZE PROTECTION FP
FROM FRM
GALLONS GAL
GALLONS PER MINUTE GPM
GLOBE VALVE GBV
HEATING WATER RETURN PIPE HWR HWR
HEATING WATER SUPPLY PIPE HWS HWS
HORIZONTAL UNIT HEATER HUH
HORSEPOWER HP
HOUR HR
HUMIDISTAT H
INCH IN
INLINE EXHAUST FAN IEF
KILOWATT KW
LEAVING AIR TEMPERATURE LAT
LEAVING WATER TEMPERATURE LWT
MANUAL AIR VENT
MAV
MANUAL DAMPER MD
MOTOR OPERATED DAMPER MOD
NEW CONNECTED TO EXISTING
NORMALLY CLOSED NC
NORMALLY OPEN NO
OUTDOOR AIR OA
PIPING INDICATION WITH RESPECT
TO FLOW
BOTTOM TAKEOFF SIDE CONNECTION
TOP TAKEOFF
TURN DOWN OR FROM BELOW
TURN UP OR DOWN
TURN UP OR FROM ABOVE
POUNDS LBS
POUNDS PER SQUARE INCH GAGE PSIG
PRESSURE DROP PD
PRESSURE GAUGE
PRESSURE REDUCING VALVE (FILL VALVE) PRV
PRESSURE RELIEF VALVE
R
RETURN AIR RA
REVOLUTIONS PER MINUTE RPM
SERVICE VALVE
STATIC PRESSURE SP
STRAINER
SUPPLY AIR SA
THERMOMETER
THERMOSTAT OR TEMPERATURE SENSOR T'STAT T
THOUSAND BTU PER HOUR MBH
THREE-SPEED FAN SWITCH S
THREE-WAY CONTROL VALVE
TWO-WAY CONTROL VALVE
UNION
WALL HEATER WH
WET BULB WB
BLOWER COIL UNIT: TRANE, DAIKIN, OR
JCI
UNIT MARK BC-1
INDOOR UNIT
SUPPLY FAN AIRFLOW, CFM 550
MINIMUM OUTDOOR AIRFLOW, CFM 55
MOTOR HP (ECM) .555
EXTERNAL S.P. 0.75
COOLING (CHILLED WATER)
TOTAL CAPACITY (MBH) 24.1
SENSIBLE CAPACITY (MBH) 16.4
ENT. AIR TEMP, ° F, DB 80.0
ENT. AIR TEMP., ° F, WB 67.0
WATER FLOW, GPM 7.7
MAX. WATER P.D. FT. H2O 7.3
HEATING (HOT WATER)
TOTAL CAPACITY (MBH) 26.8
ENT. AIR TEMP, ° F, DB 45.0
WATER FLOW, GPM 2.5
MAX. WATER P.D. FT. H2O 3.3
FILTER TYPE MERV-13
UNIT ELECTRICAL (V/Hz/Ph) 115/60/1
MCA (A) 9.32
INDOOR UNIT MODEL BCHE024
CONFIGURATION HORIZONTAL
NOTES:
1. COOLING CAPACITY BASED ON 45° F EWT.
2. HEATING CAPACITY BASED ON 120° F EWT.
3. UNIT SHALL INCLUDE FACTORY MOUNTED
CONDENSATE OVERFLOW SWITCH.
4. PROVIDE WITH INTEGRAL DISCONNECT SWITCH.
BLOWER COIL UNIT: TRANE, DAIKIN, OR
JCI
UNIT MARK BC-2A & 2B
INDOOR UNIT
SUPPLY FAN AIRFLOW, CFM 1,800
MINIMUM OUTDOOR AIRFLOW, CFM 160
MOTOR HP (ECM) 1.5
EXTERNAL S.P. 0.75
COOLING (CHILLED WATER)
TOTAL CAPACITY (MBH) 64.4
SENSIBLE CAPACITY (MBH) 45.7
ENT. AIR TEMP, ° F, DB 80.0
ENT. AIR TEMP., ° F, WB 67.0
WATER FLOW, GPM 11.4
MAX. WATER P.D. FT. H2O 3.5
HEATING (HOT WATER)
TOTAL CAPACITY (MBH) 59.7
ENT. AIR TEMP, ° F, DB 45.0
WATER FLOW, GPM 2.0
MAX. WATER P.D. FT. H2O 1.0
FILTER TYPE MERV-13
UNIT ELECTRICAL (V/Hz/Ph) 208/60/3
MCA (A) 6.5
INDOOR UNIT MODEL BCHE054
CONFIGURATION HORIZONTAL
NOTES:
1. COOLING CAPACITY BASED ON 45° F EWT.
2. HEATING CAPACITY BASED ON 120° F EWT.
3. UNIT SHALL INCLUDE FACTORY MOUNTED
CONDENSATE OVERFLOW SWITCH.
4. PROVIDE WITH INTEGRAL DISCONNECT SWITCH.
DRAWN BY:
DATE: APR. 30, 2026
CHECKED BY:
COMMISSION No.
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
R E
V I
S I
O N
S
4t h F lo o r N ew m an L ib ra ry V irt u al
S tu d io
E xp an
D ril lfi el d D riv e, B la ck sb u rg
, V A
V irg in ia
P ol yt ec hn ic In st itu te
S ta te U
E L
E C
T R
IC
R
O A
D
R
O A
N O
K E
V
IR
G
IN
IA
S
U
IT
E
.3
.4 w w w .H u g h e s A
E .c o m
H U
G H
E S
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
E
N G
IN
E
E R
S
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/30/26
1 JULY 2, 2026
MEH
RDF
HVAC
LEGENDS
NOTES
DETAILS &
CONTROLS
M-0
80 CFM
(TYP. FOR 51)
1 1
6x6
8x8
10x10 14x1218x12
24x1220x1216x1214x12
44x12
44x12
8x88x88x88x88x812x10
10x10
10x10
6"Ø
(TYP.)
56x20 D
H W
S
C W
S
HWS
CWS
HWS
CWS
HWR
CWRCWR
HWR
HWS
CWS
CWR
HWR
CFM
CFM
2"
2-1/2"
1/2"
3/4"
1"
1-1/4"
1"
1/2" 3/4" 3/4"
1"1-1/4"
2"
2"
2-1/2"
3"2-1/2"
1-1/4"
1-1/4"
1-1/4"
1"
1-1/4"
D
D
80 CFM
EX. LIGHT TROFFER
DIFFUSERS (TYP. FOR 51)
HWR
CWR
CWS
HWS
HWRCWRCWSHWS
H W
R
C W
RD
C W
S
H W
S
1-1/4"
HWR
CWR
3/4"
1 1/2"1 1/4"
1"
1"
1 1/4"
3/4"
1/2"
1-1/4" 1-1/2"
D
DRAWN BY:
DATE: APR. 30, 2026
CHECKED BY:
COMMISSION No.
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
R E
V I
S I
O N
S
4t h F lo o r N ew m an L ib ra ry V irt u al
S tu d io
E xp an
D ril lfi el d D riv e, B la ck sb u rg
, V A
V irg in ia
P ol yt ec hn ic In st itu te
S ta te U
E L
E C
T R
IC
R
O A
A
N O
K E
V
IR
G
IN
IA
S
U
IT
E
.3
.4 w w w .H u g h e s A
E .c o m
H U
G H
E S
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
E
N G
IN
E
E R
S
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/30/26
PARTIAL FOURTH FLOOR PLAN - DEMOLITION
SCALE: 1/8" = 1'-0"
MEH
RDF
HVAC
PARTIAL
FOURTH
FLOOR PLAN
DEMOLITION
M-1
DEMOLITION NOTES:
1. REMOVE EXISTING DUCTWORK, INSULATION, AIR DEVICES, AND SUPPORTS TO THE EXTENT SHOWN. THOROUGHLY CLEAN ALL
DUCTWORK AND PREPARE FOR CONNECTION TO NEW WORK.
2. REMOVE EXISTING PIPING, INSULATION, SUPPORTS AND ACCESSORIES TO THE EXTENT SHOWN. CAP AND PREPARE FOR CONNECTION TO
NEW WORK.
UP
D-60
D-9 D-8DN
UP
D-7
UP
DN
4020A
4040 4042 4044 4046
D65
8x8
10x10 14x1218x12
24x1220x1216x1214x12
44x12
44x12
8x8 8x8
8x88x812x10
10x10
10x10
125/0824
(TYP. FOR 4)
170/0824
(TYP. FOR 2)
135/0824
(TYP. FOR 4)
450/1424
(TYP. FOR 8)
95/0624
(TYP. FOR 2)
56x20
HWR
CWR
CWS
HWS
HWRCWRCWSHWS
H W
R
C W
R
22x22 CG
80 CFM
EX. LIGHT TROFFER
DIFFUSERS (TYP. FOR 29)
10x10
6x8
6x8
8x8
8"Ø
(TYP. FOR 4)
6x6
8x8
8x8
22x22 CG
22x22
CG
8"Ø
(TYP. FOR 4)
8x8
6"Ø (TYP.
FOR 4)
EX. 1360 CFM
EX. 2720 CFM
REBALANCE
FOR 1430
CFM
BC-1
D
H W
S
C W
S
HWS
CWS
HWS
CWS
HWR
CWRCWR
HWR
HWS
CWS
CWR
HWR
2"
2-1/2"
1/2"
3/4"
1"
1-1/4"
1"
1/2" 3/4" 3/4"
1"1-1/4"
2"
2"
2-1/2"
3"2-1/2"
1-1/4"
1-1/4"
1-1/4"
1"
1-1/4"
D
H W
S
C W
S H
W R
C W
R
1" 3/4"
D
D
C W
S
H W
S
1-1/4"
HWR
CWR
3/4"
1 1/2"1 1/4"
1"
1"
1 1/4"
3/4"
1/2"
1-1/4"
1-1/2"
D
22x22
CG
1-1/4"
60/0624
D
BC-2A BC-2B
18x18 x1 x1 x1
14x14
20x20 20x20 x2 x2
14"Ø
(TYP. FOR 8)
7 7
HWR
CWR
H W
S
C W
S
H W
R C
W R
80/082480/0824
8"Ø 8"Ø
1-1/2"
1-1/4"
1-1/4"
1-1/2"
1-1/2"
1-1/2"
1"
1"
1"
1"
3/4" 3/4" 1"
1"
1-1/4"
22x22 CG 22x22
CG
60/0624
(TYP. FOR 3)
6x6
6"Ø
6"Ø 6"Ø
REBALANCE
FOR 2320 CFM
T
T
D
VIRTUAL PRODUCTION
STAGE
4070D
VOLUMETRIC
CAPTURE STAGE
4070C
MOTION CAPTURE
SPATIAL AUDIO & ROOM-SCALE VR
4070B
CONTROL AND
MONITOR ROOM
COLLABORATION
ROOM
4070A
CIRCULATION
4070L
IT
4070F
EXIST
STUDY 01
4070K
EXIST
STUDY 02
4070J
EXIST
STUDY 03
4070H
EXIST
STUDY 04
4070G
DRAWN BY:
DATE: APR. 30, 2026
CHECKED BY:
COMMISSION No.
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
R E
V I
S I
O N
S
4t h F lo o r N ew m an L ib ra ry V irt u al
S tu d io
E xp an
D ril lfi el d D riv e, B la ck sb u rg
, V A
V irg in ia
P ol yt ec hn ic In st itu te
S ta te U
E L
E C
T R
IC
R
O A
A
N O
K E
V
IR
G
IN
IA
S
U
IT
E
.3
.4 w w w .H u g h e s A
E .c o m
H U
G H
E S
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
E
N G
IN
E
E R
S
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
04/30/26
PARTIAL FOURTH FLOOR PLAN - NEW WORK
SCALE: 1/8" = 1'-0"
MEH
RDF
HVAC
PARTIAL
FOURTH
FLOOR PLAN
DEMOLITION
M-2
PLAN NOTES:
1. EXTEND DUCTWORK AND TRANSITION AS REQUIRED TO CONNECT TO NEW FLEX DUCT RUN-OUT AND AIR DEVICE. INSULATION SHALL OVERLAP AND BE COPED
WITH EXISTING AND COMPLETELY VAPOR SEALED.
2. TRANSITION AS REQUIRED AND EXTEND DUCT RUN-OUT AS SHOWN. NEW DUCT INSULATION SHALL OVERLAP AND BE COPED WITH EXISTING AND COMPLETELY
VAPOR SEALED.
3. CAP EXISTING RUN-OUT CONNECTION AND SEAL AIR TIGHT AND INSULATE. NEW DUCT INSULATION SHALL OVERLAP AND BE COPED WITH \EXISTING AND
COMPLETELY VAPOR SEALED.
4. CONNECT NEW PIPING TO EXISTING. HEATING AND COOLING COIL PIPING RUN-OUTS TO BLOWER COIL UNITS ARE 3/4" UNLESS OTHERWISE NOTED. CONDENSATE DRAIN PIPING SHALL BE MINIMUM 1-1/4" TO THE UNIT CONNECTION. EXTEND AND CONNECT TO NEW BLOWER COIL UNIT AS REQUIRED. PATCH AND REPAIR
EXISTING INSULATION AS REQUIRED. NEW PIPING INSULATION SHALL BE COPED TO EXISTING PIPING INSULATION AND COMPLETELY VAPOR SEALED. NEW PIPING RUN-OUTS SHALL BE COORDINATED TO MAINTAIN MANUFACTURER PUBLISHED SERVICE CLEARANCES FOR COMPONENT, CONTROLS, ELECTRICAL AND FILTER
ACCESS.
5. INSTALL NEW BLOWER COIL UNIT, ASSOCIATED NEW WIRING AND PIPING IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
COORDINATE LOCATION WITH EXISTING DUCTWORK AND UTILITIES. RELOCATE/ADJUST EXISTING UTILITIES AS REQUIRED TO MAINTAIN MANUFACTURER
PUBLISHED SERVICE CLEARANCES FOR COMPONENT, CONTROLS, ELECTRICAL AND FILTER ACCESS.
6. OPEN END DUCT ABOVE CEILING. COVER WITH 1/2"x1/2" WIRE MESH.
7. RETURN PLENUM, FULL SIZE OF UNIT OPENING.
8. CONNECT TO EXISTING PIPE RISER IN CHASE BELOW EXISTING PIPE TRANSITION IN VERTICAL AND CONNECT TO THE LARGEST PIPE SIZE BEFORE LEVEL FOUR IN
THE RISER.
NEW WORK
DATE: APR. 30, 2026
CHECKED BY:
COMMISSION No.
© C O P Y R I G H T 2 0 2 5
HUGHES ASSOCIATES ARCHITECTS & ENGINEERS
A PROFESSIONAL CORPORATION
24024.005
R E
V I
S I
O N
S
4t h F lo o r N ew m an L ib ra ry V irt u al
S tu d io
E xp an
D ril lfi el d D riv e, B la ck sb u rg
, V A
V irg in ia
P ol yt ec hn ic In st itu…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .