Attachment E, 533 Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Wide Field Infrared Survey Telescope (WFIRST) Launch Lock Vibration Isolation System (LLVIS), newest first.
File Type Posted
Signed_Selection_letter.pdf PDF
Final_Responses_to_Industry.pdf PDF
Signed_RFP_letter.pdf PDF
Electronically_Signed_RFP_Cover_Letter.pdf PDF
Attachment_A,_WFIRST-SOW-13052--1.pdf PDF
Final_RFP.pdf PDF
Attachment_I,_QA_Plan.pdf PDF
Attachment_F,_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_B,_WFIRST-SPEC-12739-.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Enclosure_1,_QASP_Cost-Type_Contract_Template.pdf PDF
Enclosure_2,_IT_Security_Management_Plan_Template.pdf PDF
Attachment_G,_IT_Security_Applicable_Documents_List.pdf PDF
Attachment_J,_Contractor_Proposed_Enhancements.pdf PDF
SF_33.pdf PDF
Attachment_H,_IT_Security_Management_plan.pdf PDF
Attachment_D,_WFIRST-RQMT-05819_Released_Rev_A.pdf PDF
Attachment_C,_WFIRST-LIST-13054-.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

FINANCIAL MANAGEMENT REPORTING

REQUIREMENTS

DATED FEBRUARY 2019

RFP 80GSFC19R0009

CONTRACT NUMBER TBD

Contract Number TBD

Attachment E

FINANCIAL MANAGEMENT REPORTING REQUIREMENTS

Financial Management Reports shall be submitted by the Contractor on the NASA 533 series reports, in accordance with the instructions on the reverse of the forms, NASA

Procedural Requirements NPR 9501.2E entitled "NASA Contractor Financial

Management Reporting,” dated May 27, 2011, and additional instructions issued by the

Contracting Officer.

a. Level of Detail

The Contractor’s 533 Reports shall contain a summary of total contract costs, as well as a separate 533 Report for each Work Breakdown Structure (WBS) Level 3 element of the

Statement of Work (or Level 2 where there is no Level 3 breakdown). The reports shall contain a breakdown of hours and costs by the elements of cost categories listed in

Section d below.

b. Variance Narrative Reporting

In accordance with Section 3.6 of NPR 9501.2, the Contractor shall include a narrative explanation for variances exceeding plus or minus 10 percent (+/- 10%) between the

Total Direct Labor Hours (prime and subcontractors) and/or Total Estimated Cost amount shown in the prior month and the Actual Total Direct Labor Hours and/or Actual Total

Cost amount shown in the current month at WBS Level 3. (For example, the Total

Estimated Cost amount shown for June in column 8a in the May NF 533M and the Actual

June Total Cost amount shown in column 7a in the June NF 533M.)

Each variance narrative shall explain the: (1) reason for the variance, (2) impact(s) on the

Core baseline and/or each individual task order, and (3) specific corrective action(s) being taken or to be taken.

c. Distribution

The Contractor shall distribute 533 reports to each addressee indicated in the contract clause entitled, "Financial Management Reporting." The Contractor shall submit an initial report in the NF 533Q format within 30 working days after contract award.

After the initial report, the NF 533M reports shall be distributed not later than the tenth

(10th) working day following the close of the contractors' monthly accounting period.

The 533Q reports shall be distributed not later than the fifteenth (15th) day of the month preceding the quarter being reported. The NF 533M need not be submitted in months in which an NF 533Q is submitted.

d. Reporting Requirements

Contract Number TBD

Attachment E

Each individual report shall, at a minimum, provide cost data by the following elements of cost categories:

1. Prime Direct Labor Hours by Direct Labor Category:

Total Prime Direct Labor Hours

2. Subcontractor Direct Labor Hours:

Subcontractor A Direct Labor Hours by Direct Labor Category:

Subcontractor B Direct Labor Hours by Direct Labor Category:

Total Subcontractors Direct Labor Hours

3. Total Prime and Subcontractors Direct Labor Hours

4. Prime Direct Labor Costs by Direct Labor Category:

Total Prime Direct Labor Costs

5. Prime Overhead Expense

6. Other Direct Costs (ODCs):

a. Subcontracts (list separately, Subcontractor A, B, etc.)

b. Material

c. Travel

d. Other (specify)

Total ODCs

7. Subtotal (Direct Labor, Overhead & ODCs)

8. G&A Expense

9. Total Estimated Cost

10. Fixed Fee

11. Total Cost-Plus-Fixed-Fee (CPFF)