Attachment C, Deliverables

View the file

Other files for this federal contract opportunity

Other files attached to Wide Field Infrared Survey Telescope (WFIRST) Launch Lock Vibration Isolation System (LLVIS), newest first.
File Type Posted
Signed_Selection_letter.pdf PDF
Final_Responses_to_Industry.pdf PDF
Signed_RFP_letter.pdf PDF
Electronically_Signed_RFP_Cover_Letter.pdf PDF
Attachment_A,_WFIRST-SOW-13052--1.pdf PDF
Final_RFP.pdf PDF
Attachment_I,_QA_Plan.pdf PDF
Attachment_F,_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_J,_Contractor_Proposed_Enhancements.pdf PDF
SF_33.pdf PDF
Attachment_B,_WFIRST-SPEC-12739-.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Enclosure_1,_QASP_Cost-Type_Contract_Template.pdf PDF
Enclosure_2,_IT_Security_Management_Plan_Template.pdf PDF
Attachment_G,_IT_Security_Applicable_Documents_List.pdf PDF
Attachment_H,_IT_Security_Management_plan.pdf PDF
Attachment_D,_WFIRST-RQMT-05819_Released_Rev_A.pdf PDF
Attachment_E,_533_Attach_Core_Completion.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: March 8, 2019

Expiration Date: March 8, 2024

CHECK https://gddms.gsfc.nasa.gov/Windchill/app/

TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.

National Aeronautics and Space Administration

Goddard Space Flight Center

Greenbelt, Maryland

WFIRST-LIST-13054, Revision -

Wide Field Infrared Survey Telescope (WFIRST), Code 448

Instrument Carrier (IC)

Launch Lock and Vibration Isolation System

(LLVIS)

Deliverable Items List and Schedule (DILS)

GSFC WFIRST CMO

March 13, 2019

Released https://gddms.gsfc.nasa.gov/Windchill/app/

LLVIS Deliverable Items List and Schedule WFIRST-LIST-13054, Revision -ii

Instrument Carrier (IC)

Launch Lock and Vibration Isolation System (LLVIS)

Deliverable Items List and Schedule (DILS)

Review/Signature/Approval Page

Prepared by:

Wes Alexander

Approved by:

David Content

Electronic Approval available on-line at: https://gddms.gsfc.nasa.gov/Windchill/app/ iii

Preface

This document is a Wide Field Infrared Survey Telescope (WFIRST)

Configuration Management (CM)-controlled document. Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee.

Proposed changes shall be submitted to the WFIRST CM Office (CMO), along with supportive material justifying the proposed change.

In this document, a requirement is identified by “shall,” a good practice by “should,” permission by “may” or “can,” expectation by “will,” and descriptive material by “is.”

Questions or comments concerning this document should be addressed to:

WFIRST Configuration Management Office

Mail Stop 448

Goddard Space Flight Center

Greenbelt, Maryland 20771 iv

Change History Log

Revision Effective Date Description of Changes

(Reference the CCR & CCB/ERB Approval Date) Revision - March 8, 2019 Initial release per WFIRST-CIR-09350 v

Table of Contents

1 INTRODUCTION

1.1 Purpose

1.2 Scope

1.3 Related Documentation

1.3.1 Applicable Documents

1.3.2 Reference Documents

1.4 Proprietary Data

2 DELIVERABLES

2.1 Definition of Maturity, Definition of Categories, and Delivery Instructions

2.2 LLVIS Contract Deliverables Requirement List (CDRL)

2.3 Government Furnished Property (GFP) Deliverables

3 DELIVERABLE ITEM DESCRIPTIONS

3.1 Hardware Deliverable Item Description

3.2 Data Deliverable Item Description

3.2.1 Verification matrix for Specification

3.2.2 Verification matrix for SOW

3.2.3 Verification Matrix for DILS

3.2.4 Work Breakdown Structure Diagram and Dictionary

3.2.5 Financial Management Reports

3.2.6 Integrated Master Schedule

3.2.7 Component and Subassembly Reports for All Subcontracted Items

3.2.8 Configuration Management Plan

3.2.9 Digital Image and Video Records

3.2.10 Kickoff Presentation

3.2.11 Preliminary Design Review (PDR)

3.2.12 Critical Design Review

3.2.13 Critical Design Review (CDR) In Support of IC CDR

3.2.14 Manufacturing Readiness Review (MMR)

3.2.15 Test Readiness Review (TRR)

3.2.16 Pre-Ship Review (PSR)

3.2.17 End Item Data Package

3.2.18 Monthly Status Reports

3.2.19 Drawing Tree

3.2.20 Document Tree

3.2.21 LLVIS Interface Control Documentation

3.2.22 Thermal Math Models and Reports

3.2.23 Mechanical CAD Model and Reports

3.2.24 Structural Math Model and Reports

3.2.25 Model Validation Plan

3.2.26 LLVIS Contamination Control Implementation Plan

3.2.27 Structural Analyses Reports

3.2.28 Correlated Structural FEM for Final IM and Reports

3.2.29 Spare Parts Plan and List

vi

3.2.30 Production Plan

3.2.31 Verification Plan

3.2.32 Individual Test Plans

3.2.33 Test Procedures

3.2.34 Test Reports

3.2.35 Transportation Handling Plan and Procedures

3.2.36 Instruction Manual for Refurbishment

3.2.37 Maintenance, Test and Operations Manual for Ground Support Equipment

APPENDIX A ABBREVIATIONS AND ACRONYMS

List of Tables

Table 1 Contractor Data Delivery and Schedule

1 INTRODUCTION

1.1 Purpose

This document is the Wide Field Infrared Survey Telescope (WFIRST) Instrument Carrier (IC)

Launch Lock and Vibration Isolation System (LLVIS) Deliverable Items List and Schedule

(DILS). This document provides specific information on the hardware and data deliverables for the LLVIS.

1.2 Scope

The Contractor shall provide the necessary personnel, facilities, services, materials, and equipment to design, analyze, develop, assemble, integrate, calibrate, test, and evaluate the

LLVIS. The Contractor shall participate in reviews, where the Government will review all documentation associated with the design, fabrication and testing of the LLVIS. The Contractor shall also supply the necessary resources to perform the subsequent LLVIS testing on site and post-delivery support for integration and testing. This work shall be performed in accordance with the deliverable requirements of this document and all application documents to the contract.

1.3 Related Documentation

The latest versions of all documents below should be used. WFIRST documents can be obtained from URL: https://gddms.gsfc.nasa.gov/Windchill/app/.

1.3.1 Applicable Documents

The following documents apply directly to the performance of the LLVIS contract. These documents establish detailed information necessary for the creation of the deliverables.

For traceability, each Applicable Document shall be traced down one level only: any applicable documents within the documents listed below are considered as applying directly to the performance of the LLVIS contract. For example, the WFIRST MAR (WFIRST-RQMT-05819) lists NASA Procedural Requirements (NPR) 7150.2 as an applicable document. Therefore, NPR

7150.2 is an applicable document with respect to this DILS. However, the documents listed in

Section P.4 of NPR 7150.2 are not considered Applicable Documents for the purposes of this

DILS.

The MAR is an Applicable Document; to the extent defined in Section 6 of the LLVIS SOW all deliverables associated with the specified requirements shall be delivered in accordance with the corresponding MAR DID’s.

Document Number Title

WFIRST-PLAN-06635 WFIRST Contamination Control Plan

WFIRST-RQMT-05819 WFIRST Mission Assurance Requirements

WFIRST-SPEC-12739 WFIRST Project LLVIS Specification Document

WFIRST-SOW-13052 WFIRST Project LLVIS Statement of Work

WFIRST-SPEC-05417 WFIRST Math Model Guidelines

1.3.2 Reference Documents

The following documents are referenced herein and amplify or clarify the information presented in this document. These documents are not binding on the content of this document.

Document Number Title

GPR-1410.2E GSFC Configuration Management

1.4 Proprietary Data

Some of the content of documents may be of a proprietary nature to the document preparing/sending Party. In the event data is deemed to be proprietary, and for which protection is to be maintained, the sending Party shall mark the document with a notice to indicate that the data therein is proprietary and shall be used and disclosed by the receiving Party and its related entities (e.g., contractors and subcontractors) only for the purposes of fulfilling the receiving

Party’s responsibilities under the WFIRST Project, and that the identified and marked technical data shall not be disclosed or retransferred to any other entity without prior written permission of the document preparer.

2 DELIVERABLES

2.1 Definition of Maturity, Definition of Categories, and Delivery Instructions

The following definitions apply to the "Maturity: Delivery Date”.

a) Maturity:

1) Preliminary. This refers to the initial submission of an item. To be completed with available information as of the time of preparation for the due date.

2) Update: The best up-to-date information available at the time.

3) Final. This refers to a completed, thorough submission of an item for approval, review, or information. This does not preclude updating later. Any updates shall require the same

"approval/review" process as was required for the previous submissions.

b) NASA Action Required Code

A Approval: Items in this category require review and approval by GSFC or its designated representatives prior to use or implementation. GSFC shall approve/disapprove within 30 working days of receipt.

Requirements for resubmission shall be specified in letter(s) of disapproval.

R Review: Documents in this category are to be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC shall review and comment within 20 working days of receipt.

I Information. Documents in this category are to be provided to GSFC or its designated representative for information purposes only. No

Government response is required.

c) Quantity: This provides the required number of copies for the deliverable.

2.2 LLVIS Contract Deliverables Requirement List (CDRL)

The Contractor Hardware Deliverable Items List is in the Contract.

The Contractor Data Delivery and Schedule is shown in Table 1.

The Contractor Hardware Deliverable Item Descriptions are in Section 3.1 of this document.

The Contractor Data Deliverable Item Descriptions are in Section 3.2 of this document.

Table 1 Contractor Data Delivery and Schedule

CDRL

No.

Title Reference Category Quant. Maturity: Delivery Date

PM-1 Verification Matrix for

SPEC

SOW 2.1-C R 1 Preliminary: with proposal

Baseline: at kickoff meeting

PM-2 Verification Matrix for

SOW

SOW 2.1-D R 1 Preliminary: with proposal

Baseline: at kickoff meeting

No.

Title Reference Category Quant. Maturity: Delivery Date

PM-3 Verification Matrix for

DILS

SOW 2.1-E R 1 Preliminary: with proposal

Baseline: at kickoff meeting

PM-4 LLVIS Work

Breakdown Structure

Diagram and Dictionary

SOW 2.1.1-F R 1 Preliminary: 15 Days ACA

Updates: as WBS changes occur

PM-5 Financial Management

Reports

SOW 2.1.2-C R 1 Preliminary:

- 533Q report within 30 working days ACA

- 533M reporting must begin no later than 30 days after incurrence of cost

Updates:

- 533Q: Due on the 15th of the month preceding the quarter being reported in columns 8a, 8b, and 8c.

- 533M: due no later than

(NLT) 10 working days after the close of Contractor’s monthly accounting period.

PM-6 Integrated Master

Schedule (IMS)

SOW 2.1.3-B A 1 Preliminary: 15 days ACA

Any changes to IMS shall be updated prior to the WFIRST

Monthly Review with updates by the end of 3rd week in the month.

PM-7 Component and

Subassembly Test

Reports for All

Subcontracted Items

SOW 2.1.4-C R 1 Preliminary: due 7 days after test completion

Final: due 20 days after test completion

PM-8 Configuration

Management Plan

SOW 2.1.5-F A 1 Preliminary: 30 days ACA

Final: 75 days ACA

PM-9 Digital Image and Video

Records Document

SOW 2.1.5-I R As needed

First: 30 days prior to the

LLVIS PDR

Preliminary: due 5 days after

Qualification unit and EDU

Final: due 10 days after

Qualification unit and EDU

Second: 30 days prior to the

IC CDR

All photo documentation will be provided along with the

EIDP delivery.

Title Reference Category Quant. Maturity: Delivery Date

PM-10 Kickoff Meeting

Presentation package

SOW 2.2.2-A R 2 Preliminary: 10 days before kickoff meeting

Final: day of kickoff meeting

PM-11 Preliminary Design

Review Package

SOW 2.2.4-A A 2 Preliminary: 7 calendar days before review

Final: 10 days after review

PM-12 Critical Design Review

Package

SOW 2.2.4-B A 1 Preliminary: 7 calendar days before Review

Final: 10 days after review

PM-13 Critical Design Review

(CDR) Package In

Support of IC CDR

SOW 2.2.4-C R 1 Preliminary: 7 calendar days before IC CDR

Final: 10 days after review

PM-14 Manufacturing

Readiness Review

(MRR) Presentation

Package

SOW 2.2.4-E A 1 Preliminary: 7 calendar days before review

Final: 10 days after review

PM-15 Test Readiness Reviews

Package

SOW 2.2.4-F A 1 for each review

Preliminary: 7 calendar days before both qualification and flight testing reviews

Final: 5 days after both qualification and flight testing reviews

PM-16 Pre Ship/Acceptance

Review Package

SOW 2.2.4-G A 1 for each review

Preliminary: 7 calendar days before both qualification and flight acceptance reviews

Final: Presented at each of the acceptance PSR for qualification and flight units

PM-17 End Item Acceptance

Data Package

SOW 2.2.4-H A 1 Preliminary: 7 calendar days before PSR’s for both the qualification and flight units

Final: at both qualification and flight PSR’s

PM-18 Monthly Status Report SOW 2.2.6-B R 1 Monthly Reports are due with updates by the end of 3rd week in the month.

SE-1 Drawing Tree SOW 4.2-B R 1 Preliminary: LLVIS PDR

Final: IC CDR

SE-2 Document Tree SOW 4.2-C R 1 Preliminary: LLVIS PDR

SE-3 LLVIS Interface Control

Documentation

SOW 4.3-A A 1 Preliminary: LLVIS PDR

Title Reference Category Quant. Maturity: Delivery Date

SE-4 Thermal Math Models and Reports

SOW 4.4-A R 1 Preliminary: 1 month prior to

LLVIS PDR

Update: 2 months prior to IC

CDR

Final: 15 days after IC CDR

SE-5 Mechanical CAD Model and Reports

SOW 4.4-A R 1 LLVIS top-level and component level CAD:

- Preliminary: 1 month prior to LLVIS PDR

- Update: 2 months prior to

IC CDR

- Final: 15 days after IC

CDR

Both models and reports

LLVIS:

- at any significant design update, or

- as requested to stay synchronized with the IC-level CAD development

Title Reference Category Quant. Maturity: Delivery Date

SE-6 Structural Math Model and Reports

SOW 4.4-A R 1 Stowed and Deployed load assessment:

- Preliminary: 1 month prior to LLVIS PDR

- Update: 2 months prior to IC CDR

- Final: correlated

Model Post

Transmissibility

Testing

Integrated Modeling (IM)

Models for on-orbit performance assessment:

- Preliminary: 1 month prior to LLVIS PDR

- Update: 2 months prior to IC CDR

- Final: correlated model post transmissibility testing

Note: If the deployed load assessment model can be used for IM purposes, only one deployed model needs to be provided.

Both models: updates after significant design changes

SE-7 Model Validation Plan SOW 4.4-C A 1 Preliminary: proposal

Update: LLVIS PDR

Final: IC CDR

SE-8 LLVIS Contamination

Control Implementation

Plan

SOW 4.5-B A 1 Preliminary: By LLVIS PDR

Final: By LLVIS MRR

SE-9 Structural Analyses

Reports

SOW 5.1-C R 1 Preliminary: 1 month prior to

LLVIS PDR

Update: 2 months prior to IC

CDR

Final: 15 days after IC CDR

Title Reference Category Quant. Maturity: Delivery Date

SE-10 Correlated Structural

FEM for Final IM and

Reports

SOW 5.1-E A 1 Stowed/Deployed Load

Assessment Models

- Final: 15 days after LLVIS qualification testing

IM Models

- Final: after transmissibility/ characteristic testing

SE-11 Spare Parts Plan and List SOW 5.2-B A 1 Plan: LLVIS PDR

List: LLVIS CDR

IT-1 Production Plan SOW 6.1-A R 1 Preliminary: 1 month prior to

LLVIS PDR

Final: 1 month prior to IC

CDR

IT-2 Verification Plan SOW 6.3-A A 1 60 days ACA

IT-3 Individual Test Plans SOW 6.3-B A 1 Final: 1 month prior to test start

IT-4 Test Procedures SOW 6.3-D A 1 Final: 10 days prior to test start

IT-5 Test Reports SOW 6.3-H R 1 per test

Preliminary: 5 days after test

20 days after test completion

IT-6 Transportation Handling

Plan and Procedures

SOW 6.4-B A 1 Preliminary: 1 month prior to

IC CDR

Final: 30 days before LLVIS

PSR

IT-7 Instruction Manual for

Refurbishment of the

LLVIS

SOW 6.5-B R 1 Preliminary: at LLVIS CDR

Final: 30 days before LLVIS

PSR

IT-8 Maintenance, Test and

Operations Manual for

GSE

SOW 8.0-E R 1 Preliminary: 1 month before testing begins

Final: LLVIS PSR

2.3 Government Furnished Property (GFP) Deliverables

NONE

3 DELIVERABLE ITEM DESCRIPTIONS

3.1 Hardware Deliverable Item Description

Title: Delivery of Engineering Design Units (EDU) Launch Lock CDRL No.: HW-1

SOW Paragraph 9.6

Description:

Contractor shall deliver one Launch lock EDU per WFIRST-SPEC 12739.

Applicable Documents: WFIRST-SPEC 12739

Reference Documents: WFIRST-SOW-13052

Title: Delivery of EDU of the Isolators CDRL No.: HW-2

SOW Paragraph 9.6

Description:

Contractor shall deliver one Isolator EDU per WFIRST-SPEC 12739.

Title: Delivery of Qualification Units CDRL No.: HW-3

Description:

Contractor shall deliver one Launch Lock Qualification Unit per WFIRST-SPEC 12739.

Title: Delivery of Qualification Units CDRL No.: HW-4

Description:

Contractor shall deliver one Isolator Qualification Unit per WFIRST-SPEC 12739.

Title: Flight Delivery of Launch Locks CDRL No.: HW-5

Description:

Contractor shall deliver six flight qualified Launch Locks per WFIRST-SPEC 12739.

Title: Flight Delivery of Isolators CDRL No.: HW-6

Description:

Contractor shall deliver six flight qualified Isolators per WFIRST-SPEC 12739.

Applicable Documents: WFIRST-SPEC 12739

Title: Flight Spare Delivery of Launch Lock CDRL No.: HW-7

Description:

Contractor shall deliver one spare flight qualified Launch Lock per WFIRST-SPEC 12739.

Title: Flight Spare delivery of Isolator CDRL No.: HW-8

Description:

Contractor shall deliver one spare flight qualified Isolator per WFIRST-SPEC 12739.

3.2 Data Deliverable Item Description

3.2.1 Verification matrix for Specification

Title: Verification Matrix for Specification CDRL No.: PM-1

SOW Paragraph: 2.1-C

Use:

Establish that all requirements will be met

Applicable Documents: None

Reference Documents: None

Maturity/Delivery Date:

Preliminary: with proposal

Baseline: kickoff meeting.

Preparation Information:

This matrix establishes that the contractor shall meet all the requirements in the document and will be used for tracking progress

3.2.2 Verification matrix for SOW

Title: Verification Matrix for SOW CDRL No.: PM-2

SOW Paragraph: 2.1-D

Use:

Establish that all requirements will be met

Applicable Documents: None

Reference Documents: None

Maturity/Delivery Date:

3.2.3 Verification Matrix for DILS

Title: Verification Matrix for DILS CDRL No.: PM-3

SOW Paragraph: 2.1-E

Use:

Establish that all requirements will be met

Applicable Documents: None

Reference Documents: None

Maturity/Delivery Date:

3.2.4 Work Breakdown Structure Diagram and Dictionary

Title: LLVIS Work Breakdown Structure Diagram and Dictionary CDRL No.: PM-4

SOW Paragraph: 2.1.1-F

Use:

The WBS establishes a product-oriented framework for reporting project cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, project visibility, and assignment of responsibilities.

Additionally, the WBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work.

The WBS Dictionary provides a narrative description of the work tasks and effort to be performed in each WBS element.

Applicable Documents: None

Maturity/Delivery Date:

Preliminary: 15 days ACA

Updates: as WBS changes occur.

The WBS and WBS Dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:

a. WBS - A logical, hierarchical display of the subdivision of all project work to be completed. The WBS shall include the approved element title and element number.

b. WBS Dictionary - The WBS dictionary shall describe and document the work content of every WBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).

The WBS dictionary shall be arranged in the same order as the contract WBS.

3.2.5 Financial Management Reports

Title: Financial Management Reporting CDRL No.: PM-5

SOW Paragraph: 2.1.2-C

Use:

To provide data necessary for:

a) Projecting costs and hours to ensure that dollar and labor resources realistically support project and program schedules;

b) Evaluating the Contractors’ actual cost and fee data in relation to negotiated contract value, estimated costs, and budget forecast data;

c) Planning, monitoring, and controlling project and program resources; and

d) Accruing cost in NASA’s accounting system.

Applicable Documents: NPR 9501.2E NASA Contractor Financial Management Reporting

Maturity/Delivery Date:

Preliminary Submission:

The Contractor shall submit initial 533Q report within 30 working days ACA. The

533M reporting must begin no later than 30 days after incurrence of cost.

Further Submissions:

- 533Q: due on the 15th of the month preceding the quarter being reported in columns 8a, 8b, and 8c

- 533M: due No Later Than (NLT) 10 working days after the close of Contractor’s monthly accounting period.

Contents:

The 533M shall provide monthly data on actual and planned costs and labor hours, short-term projections, Estimate-to-Complete, and Contract Value, in accordance with

NPR 9501.2E.

The 533 shall provide monthly and quarterly contractual planned and actual expenditure data as defined by the Government including subcontractor data. It shall also include estimated cost to complete.

Financial reports shall be provided down to the WBS level 3.

The Financial Management Reports shall include reconciliation between the 533Q and the Integrated Program Management Report (IPMR). This reconciliation may be included within the required IPMR formats.

Format:

The NF 533 Financial Management Reports shall be prepared in accordance with

GSFC 52.242-90, Financial Management Reporting, and NASA FAR Supplement

(NFS) 1852.242-73, NASA Contractor Financial Management Reporting clauses.

3.2.6 Integrated Master Schedule

Title: Integrated Master Schedule CDRL No.: PM-6

SOW Paragraph: 2.1.3-B

Use:

For understanding and mapping out in detail the most efficient way of melding together all elements necessary for providing the program deliverables by their required delivery times.

The schedule shall encompass all phases of the program indicating critical path and schedule slack and reserve, including detailed subsystem schedules.

Maturity/Delivery Date:

Preliminary: 15 days ACA.

Change updates required at the end of the 3rd week of the month.

Detailed network diagrams shall be developed, delivered, and maintained for both the isolator and the launch lock schedule The Schedule shall reflect the significant activities in sufficient detail to permit adequate visibility into work progress. Schedules shall contain the approved baseline as well as current forecasted dates and shall be traceable to the approved Work

Breakdown Structure (WBS). All key milestones shall be clearly identified including: contract milestones, design reviews, readiness reviews, de-scope decision points and major receivables/deliverables among subsystems/organizations (including subcontractor effort).

Milestones shall be logically linked to related tasks. Clearly identified schedule margin tasks and dates needed for Government Furnished Property shall be included in the network. A log of changes to the schedule baseline shall be maintained and reported monthly. Critical paths, slack, and reserve shall be identified.

Scheduling Tool/Process: The Contractor shall use an application that is compatible to

Microsoft Project. The tool shall support data transfer and integration.

The following status and analysis reports shall be provided monthly:

Top-Level Contractor Summary Schedule: Top-level schedule (chart), in project compatible software, suitable for a formal presentation.

3.2.7 Component and Subassembly Reports for All Subcontracted Items

Title: Component and Subassembly Test Reports for All Subcontracted

Items

CDRL No: PM-7

SOW Paragraph: 2.1.4-C

Use:

Provides descriptions of analysis performed, drawings, inspections results, and test units, "as-run" procedures, test fixtures, test configuration, environment, test results, and any failures and corrective actions

Maturity/Delivery Date:

Preliminary: due 7 days after test completion

Final: due 20 after test completion

As a minimum, these reports shall identify the requirements, analysis performed, drawings, inspections results, and test units, "as-run" procedures, test fixtures, test configuration, environment, test results, and any failures and corrective actions.

3.2.8 Configuration Management Plan

Title: Configuration Management Plan CDRL No.: PM-8

SOW Paragraph: 2.1.5-F

Use:

To define the Contractor’s configuration management system and to provide a means of control for all changes affecting form, fit, or function and any impact on performance, cost or schedule.

Reference Documents: GPR-1410.2E GSFC Configuration Management

Maturity/Delivery Date:

Preliminary: 30 days ACA

Final: 75 days ACA

- The plan shall describe the Contractor’s configuration management organization and personnel responsibilities.

- The plan shall describe the Contractor's configuration identification system, including drawing and specification standards.

- The plan shall accommodate the requirements of the contract relative to technical direction and approvals.

- The plan shall describe the Contractor's change control system and shall include sample change documents and/or forms.

- The plan shall define the interfaces between the Contractor's change control system and

GSFC CM Office.

- The plan shall describe which types of changes will be submitted to GSFC for approval, and the process for their submittal.

- The plan shall define the Contractor's engineering data management activities

(including archiving process), documentation approvals, release procedures, and categories of release.

- The plan shall describe the Contractor's configuration status accounting system including samples of lists and reports used.

- The plan shall describe the Contractor's approach to verification and configuration audit to ensure that performance and functional requirements have been achieved by the design.

- The plan shall describe Contractor’s approach for using photographs as part of the

Configuration Management/documentation process.

3.2.9 Digital Image and Video Records

Title: Digital Image and Video Records Document CDRL No.: PM-9

SOW Paragraph: 2.1.5-I

Use:

Program status reviews; system, subsystem, and assembly packaging evaluations; and trouble shooting. Documentary electronic images of the LLVIS during key phases of fabrication and

Assembly, Integration, & Test (AI&T).

Maturity/Delivery Date:

30 days prior to LLVIS PDR.

Preliminary due 5 days after EDU and Qualification unit and EDU

Final due 10 days after EDU and Qualification unit and EDU

30 days prior to IC CDR

All photo documentation will be provided along with the End Item Data Package

(EIDP) delivery.

- Images shall be provided in digital format (JPEG, PNG, or TIFF)

- Images shall include pictures of the major subsystems, critical assemblies, the full-up system, and major GSE items.

- Images shall serve as a record of the build-up of a major subassemblies and assemblies;

e.g., a typical electronic card, mother board, electronic subsystem with cover off, etc.

- Each image shall be identified with a label containing the following information:

assembly number, serial number, description (e.g. name of the assembly), date of image, and the supplier's company name.

- Each image shall include a scale reference (e.g. rule, standard cube).

- The subject shall appropriately fill the digital frame to allow for effective magnification. Images shall include pictures of environmental test fixtures.

- Images shall be of sufficient resolution to clearly show component placement, part marking, or details that are covered or obscured at subsequent levels of assembly and/or any other operation that renders subsequent inspection impractical.

Images shall be of sufficient resolution to permit identification of components and verification of wire routings.

3.2.10 Kickoff Presentation

Title: Kickoff Meeting Presentation Package CDRL No: PM-10

SOW Paragraph: 2.2.2-A

Use:

To provide technical and programmatic information in the form of presentation slides, drawings, schematics, and schedules for distribution at kickoff meeting.

Maturity/Delivery Date:

- Preliminary: 10 days before kickoff meeting

- Final: day of the kickoff meeting

The template(s) will be mutually agreed to between the Project and the Contractor. As a minimum the presentation package should cover the following areas:

Program Management organization Chart

Review of flow-down documentation (SOW, MAR, Spec, DILS, applicable documents

Review of key baseline assumptions

Quality Assurance including non- conformance processing

Design Description review of technical approach, phasing of PDR/CDR

Preliminary Interface Control Documents

Flight Heritage including review of applicable Lessons Learned

Review of Critical Processes

Facilities

EDU and Qualification Verification Plan and Procedure

Mechanical Analysis with Boundary Conditions

Review of Potential Risks and risk mitigation plan

Review of key technical areas, confirmation of plans for TIMs

Schedule Review including critical path and margin

Review of Deliverable Items

3.2.11 Preliminary Design Review (PDR)

Title: Preliminary Design Review Presentation Package CDRL No: PM-11

SOW Paragraph: 2.2.4-A

Use:

To provide technical information on the hardware design in preparation for fabrication of

Qualification unit, and flight units.

Maturity/Delivery Date:

- Preliminary: 7 Calendar days before review

- Final: 10 days after review

Review packages shall provide the information to fully understand the design, analysis, fabrication, and testing of the LLVIS mechanism. The presentation shall cover the following areas.

Program Management

Quality Assurance

Electrical, Mechanical, and Environmental specifications

Parts, including stress analysis and radiation hardness assessment

Detailed architectural block diagrams for the different deliverable units

Fabrication, Assembly, and Inspection Flow plan

Facilities

Verification Test Plan (Including Performance Test Description)

Materials and Processes

Contamination Control (for items sensitive to contamination or with explicit surface cleanliness or outgassing requirements)

Mechanical/Structural analyses

Electrical Worst-Case analyses

Preliminary Verification Plan

Flight Heritage

Schedule

Any risks

Issues and concerns

Plan forward

Conclusion

3.2.12 Critical Design Review

Title: Critical Design Review Presentation Package CDRL No: PM-12

SOW Paragraph: 2.2.4-B

Use:

To provide technical and programmatic information in the form of presentation slides, drawings, schematics, and schedules to verify that the contractor is ready to proceed to fabrication of parts and assemblies for the LLVIS.

Applicable Documents: None Reference Documents: None

Package shall provide all necessary documents, drawings and information for readiness to move to fabrication including as a minimum the following:

Program Management

Quality Assurance

Electrical, Mechanical, and Environmental specifications

Parts, including stress analysis and radiation hardness assessment

Detailed architectural block diagrams for the different deliverable units

Fabrication, Assembly, and Inspection Flow plan

Facilities

Verification Test Plan (Including Performance Test Description)

Materials and Processes

Contamination Control (for items sensitive to contamination or with explicit surface cleanliness or outgassing requirements)

Mechanical/Structural analyses

Electrical Worst-Case analyses

Preliminary Verification Plan

Flight Heritage

Results from completion of Life testing

Schedule

Any risks

Issues and concerns

Plan forward

Conclusion

3.2.13 Critical Design Review (CDR) In Support of IC CDR

Title: LLVIS Presentation Package In Support of IC CDR CDRL No: PM-13

SOW Paragraph: 2.2.4-C

Use:

To provide technical and programmatic information in the form of presentation slides, drawings, schematics, and schedules for IC element CDR.

Maturity/Delivery Date:

- Preliminary: 7 Calendar days before IC CDR

The Package shall identify final design, procedures, analysis, fabrication, and test of the

LLVIS system in support of the IC design

The template(s) will be mutually agreed to between the Project and the Contractor.

3.2.14 Manufacturing Readiness Review (MMR)

Title: Manufacturing Readiness Review Presentation Package CDRL No: PM-14

SOW Paragraph: 2.2.4-E

Use:

To provide technical information on the hardware design in preparation for fabrication of

Qualification unit, and flight units.

Maturity/Delivery Date:

Review packages shall provide the information to fully understand the design, analysis, fabrication, and testing of the LLVIS mechanism. The presentation shall cover the following areas. Fabrication, Assembly, and Inspection Flow plan

Key individuals that will be working the LLVIS and their training/qualifications

Facilities

Verification Test Plan (Including Performance Test Description)

Materials and Processes

Contamination Control (for items sensitive to contamination or with explicit surface cleanliness or outgassing requirements)

Quality/Verification plan

GSE

Schedule

3.2.15 Test Readiness Review (TRR)

Title: Test Readiness Review Presentation Package CDRL No: PM-15

SOW Paragraph: 2.2.4-F

Use:

To provide technical information on the hardware design in preparation for testing of both the qualification unit and the flight units of each component such as the launch lock and the isolator.

- Preliminary: 7 calendar days before both qualification and flight testing reviews

(could be up to 4 reviews).

- Final: 5 days after both the qualification and the flight test reviews.

Preparation Information:

Review packages shall provide the information to fully understand the GSE, analysis, and testing of the launch lock and the isolator mechanisms. The presentation shall cover the following areas.

Quality Assurance

Electrical, Mechanical, and Environmental specifications

Detailed architectural block diagrams for the different deliverable units

Facilities

Verification Test Plan (Including Performance Test Description)

Materials and Processes

Mechanical/Structural analyses

Test plans and test procedures

Schedule

Any risks

Issues and concerns

3.2.16 Pre-Ship Review (PSR)

Title: Pre-Ship/Acceptance Review Presentations CDRL No: PM 16

SOW Paragraph: 2.2.4-G

Use:

The Pre-ship Review will demonstrate that the contractor has completed all contractual requirements identified in the Spec and SOW of this contract.

Maturity/Delivery Date:

Preliminary: 7 Calendar days before both the qualification and flight acceptance review

Final: presented at each of the qualification and flight acceptance reviews

Preliminary EIDP shall be presented along with any design changes

- Final Verification Matrix for items in the SPEC DILS SOW and MAR

- Preliminary EIDP

- Any tools and procedures required for operating the LLVIS units

- All GSE with descriptions and uses for GSFC later operations

3.2.17 End Item Data Package

Title: End Item Acceptance Data Package CDRL No: PM 17

SOW Paragraph: 2.2.4-H

Use:

The end Item data package documents the design fabrication, assembly, test, and integration of the hardware being delivered and is part of the end item delivery.

Maturity/Delivery Date:

Preliminary: 7 calendar days before PSR’s for both qualification and flight units

Final: at both qualification and flight PSR’s

The following items shall be included:

- The deliverable item name, serial number, part number, and classification status

(Flight, non-flight, GSE, LLVIS

- Appropriate approval signatures.

- As Built Serialization

- As built configuration

- In process Work Orders (available for review at contractors)

- Final assemblies and test work orders

- Major MRB actions

- Major anomaly reports with root cause and corrective action disposition

- Acceptance test procedures and reports, including environmental testing

- As built parts and materials list.

- Chronological History including total operating hours, mechanical cycles and remaining cycle life

- As built final assembly drawings

- Photo documentation with images per 3.2.9

- Waivers/Deviations

- Operations manual including setting and resetting the assemblies while in use

Certificate of compliance

3.2.18 Monthly Status Reports

Title: Monthly Status Reports CDRL No: PM 18

SOW Paragraph: 2.2.6-B

Use:

Provide monthly status to identify technical and schedule progress

Applicable Documents: None

Reference Documents: None

Maturity/Delivery Date:

Monthly Reports are due with updates by the end of 3rd week in the month

a. Description of work performed, including updated milestone plan

b. Status of open waiver requests.

c. Cumulative action item list showing open and closed action items with

ECD and assigned responsibility, as well as status of any open action items.

d. Description of significant problems and proposed solutions.

e. Risk and Opportunity management listing and status.

f. Status of Class I and Class II changes.

g. Material Review Board status.

h. Part and material status including subtier supplier status.

i. SDRL delivery status.

j. Other items as defined in applicable sections of the MAR.

3.2.19 Drawing Tree

Title: Drawing Tree CDRL No: SE-1

SOW Paragraph: 4.2-B

Use:

For ready reference list of all LLVIS flight, EDU, qualification units and LLVIS GSE drawings and documents.

Maturity/Delivery Date:

Preliminary: LLVIS PDR

- The drawing tree shall list all drawings for the LLVIS and separately for the GSE.

- The drawing trees shall be organized and identified to serve as a ready reference list.

- The drawing tree shall identify drawings by name and number.

- The drawing tree shall include a brief description of each drawing.

3.2.20 Document Tree

Title: Document Tree CDRL No: SE-2

SOW Paragraph: 4.2-C

Use:

For ready reference list of all LLVIS flight EDU, qualification units and LLVIS GSE documents.

Maturity/Delivery Date:

- The document tree shall list all documents for the LLVIS and separately for the GSE.

- The document trees shall be organized and identified to serve as a ready reference list.

- The document tree shall identify documents by name and number.

- The document tree shall include a brief description of each document.

3.2.21 LLVIS Interface Control Documentation

Title: LLVIS Interface Control Documentation CDRL No: SE-3

SOW Paragraph: 4.3-A

Use:

An Interface Control Document (ICD), developed by the Contractor, will be used to define the

LLVIS to external electrical, mechanical, and thermal interface requirements. Additionally, a

Mechanical Interface Control Drawing (MICD) will be used to define the LLVIS location relative to the IC and Spacecraft.

Maturity/Delivery Date:

The ICD shall capture all interface requirements from the LLVIS for both sides of the interfaces and shall define the necessary products and analysis required from the Contractor to support the integrated mission analyses to be performed by the WFIRST Project as the mission integrator. Typical mission analyses are integrated loads analysis, integrated thermal analyses, orbital debris analysis, etc.

The Contractor shall provide the following inputs, as appropriate, to the ICD:

Thermal Input to ICD

Thermal control coatings, blankets, heat flow and operating limits

Vent paths, grounding paths

Thermal Model Analysis Parameters

Temperature Monitoring and Thermal Control Hardware

Heaters o Resistance o Voltage range o Power range o Set Point o Heater control type

Electrical Input to ICD

Voltage Range

Current Range

Source Impedance

Interface Schematic

Termination Details

Filtering

Grounding Diagram

Interface Connector (if Applicable) o Pin (or wire if o connector) Assignment o Wire Type o Wire Gauge

Mechanical Input to ICD

Physical Requirements are;

- Mass properties

- Mass of interface fasteners

- Dimensions

- Static/dynamic volume clearance envelope

- Drill templates

- Alignment orientations

- Detailed interface definition including hole positions and tolerances, surface finishes, alignment provisions and tolerances, and other key features

- Access

- Lifting points

- Center of mass

- Moments of inertia

- Fastener size

- Surface finish

- Special surface finish

Special conditions shall be listed including but not limited to:

- Payload environments such as vibration, shock, acoustic, and purge needs.

- Safety-such as pyrotechnics, energy storage, trip-over, hazardous materials

- Ground Support Equipment- such as mechanical, test specific, targets, simulators.

- Contamination control-such as cleanliness levels, purge requirements, handling during transportation

3.2.22 Thermal Math Models and Reports

Title: Thermal Math Models and Reports CDRL No: SE-4

SOW Paragraph: 4.4-A

Use:

The LLVIS thermal math model is a mathematical representation of the heat transfer between the LLVIS, and the environment. It is integrated with the IC thermal model, and is used to evaluate the thermal performance of the instrument. This model shall accurately predict the heat flows and the resulting temperature changes for any alteration in the environment, internal power dissipation, or any other thermal model parameter.

Applicable Documents: WFIRST-SPEC-05417 Math Model Guidelines

Maturity/Delivery Date:

Preliminary: 1 month prior to LLVIS PDR

Update: 2 months prior to IC CDR

Final: 15 days after IC CDR

Thermal Model

The mathematical representation shall consist of a Thermal Model of the LLVIS The Thermal

Model shall include geometric math models (GMM), which calculate radiation couplings and environmental heat fluxes, and thermal math models (TMM), or nodal models which calculate the heat transfer and resultant temperatures. The models shall adhere to the Math Model

Guidelines (WFIRST-SPEC-05417). The model shall have sufficient detail of all critical interfaces to accurately predict temperatures. These models shall be verified and refined after comparison with thermal test data. The model shall match CBE mass to within +0 % to -5%.

A list of all nodes with nodal descriptions shall be provided. Sketches showing how nodes correspond to hardware components shall be included. Describe each node of the thermal model, its correspondence to a surface or surfaces of the GM, All models, simulations, and/or databases required by this deliverable shall be delivered on electronically compatible with the hardware platform on which it is to execute and include everything necessary to provide a fully functioning computer model in Thermal Desktop and SINDA.

Thermal Math Models shall support both steady-state and transient solutions. Thermal Math

Models shall represent all flight environments and mission modes from pre-launch through the entire mission life, as well as model the environments of the thermal balance and thermal vacuum tests.

The range of parameters used shall include allowance for natural variations, measurement uncertainties, manufacturing and assembly tolerances, degradation over the mission life, and contamination. Thermal Math Models shall include the files and description of any special analytical routines or techniques, e.g., for representing heater or other temperature control features. Any nodes or surfaces using adiabatic surfaces or arithmetic nodes (zero mass nodes) shall be noted. Thermal Math Models shall include figures showing at least the overall layout of the LLVIS with dimensions, and with significant features of the thermal control system identified (e.g., radiators, insulation,). Thermal Math Models shall include results of sample run (of the hot case, End of Life (EOL)).

Every temperature limited component, assembly or subassembly and every flight temperature sensor shall be represented by a node which predicts its temperature. Key features of the

GMM, such as geometry and coatings properties shall be traceable to the physical reality of the hardware.

Thermal Analysis Reports

Thermal analysis and design

Pre-environmental testing thermal analysis report

3.2.23 Mechanical CAD Model and Reports

Title: Mechanical CAD Model and Reports CDRL No: SE-5

SOW Paragraph: 4.4-A

Use:

The LLVIS mechanical Computer Aided Design (CAD) models are used to integrate with other models to create a complete model of the WFIRST Observatory.

Maturity/Delivery Date:

LLVIS top-level and component level CAD:

- Preliminary: 1 month prior to LLVIS PDR

- Update: 2 months prior to IC CDR

- Final: 15 days after IC CDR

- Both models and reports

- At any significant design update or as requested to stay synchronized with the IC level

CAD development

These models shall comply with the WFIRST Math Models Guidelines (WFIRST-SPEC-

05417). The parts list will be derived from the models.

A solid model is required for each project element. For each solid model two files will be created. One file will be the native software file format. If the native software produces multiple files (such as CREO version 3), then these files will be collected into one Zipped file.

The second file will be a STEP AP214 file format. There will be three files per solid configuration (native, STEP & documentation). All three files will be placed together and named after that solid configuration.

This applies to the LLVIS component/subassembly-level CAD and the LLVIS top-level CAD.

The LLVIS top-level CAD shall include all lower-level CAD.

3.2.24 Structural Math Model and Reports

Title: Structural Math Model and Reports CDRL No: SE-6

SOW Paragraph: 4.4-A

Use:

To provide instrument analysis results, interface information, and structural math models integrated into system level analysis; load derivation, operational performance, stowed dynamic, and deployment dynamic analysis.

Maturity/Delivery Date:

Stowed and Deployed load assessment:

- Preliminary: 1 month prior to LLVIS PDR

- Update: 2 months prior to IC CDR

- Final: correlated model post transmissibility testing

Integrated Modeling (IM) Models for on-orbit performance assessment:

- Preliminary: 1 month prior to LLVIS PDR

- Update: 2 months prior to IC CDR

- Final: correlated model post transmissibility testing

- Note: If the deployed load assessment model can be used for IM purposes, only one deployed model needs to be provided

Both models: Updates after significant design changes

All structural math models shall be compliant with the Math Model Guidelines (WFIRST-

SPEC-05417).

Interface degrees of freedom shall be compatible with corresponding attachment degrees of freedom to the payload.

Stowed Dynamics structural math models shall be developed to be included in system level launch configuration analysis.

Internal Finite Element Model (FEM) data recovery list for Coupled Loads Analysis (CLA) shall be provided for all GFP interfaces and LLVIS identified critical locations. Data recovery list shall include maximum allowable loads for assessment against CLA results.

The on orbit structural math model shall include time histories of forces and torques generated by LLVIS operations.

The final update of the structural model shall include any modifications required to correlate the model to the physical test results.

Documentation of the Finite Element Model shall be compliant with the MMG.

3.2.25 Model Validation Plan

Title: Model Validation Plan CDRL No: SE-7

SOW Paragraph: 4.4-C

Use:

To define the processes, encompassing testing, correlation criteria, and correlation procedures, that will be used to generate Thermal and Structural Math Models that are sufficiently accurate to predict thermal distortion, long-term material stability (moisture desorption, etc.), and jitter responses to meet WFIRST needs.

Maturity/Delivery Date:

Preliminary: Proposal

Update: LLVIS PDR

The Optical, Thermal, and Structural Math Models will be integrated into the system

Integrated Model by the WFIRST Project Integrated Modeling team and used to predict thermal distortion, jitter, and long-term material stability (moisture desorption, etc.)-induced optical responses. A subset of the error budget terms, specifically short duration stabilities, are too small to be verified by test and so will be verified analytically using the system integrated model at the IC level by the WFIRST and at the observatory level by the Project IM team. The thermal distortion, long-term material stability, and jitter analyses use multiplicative Model

Uncertainty Factors (MUFs) to bound the prediction error in the Thermal, Thermal Distortion, and Dynamics models, to which the prediction error in the IC is a contributor.

The Model Validation Plan shall define the tests, measurements, model correlation criteria, and procedures that will be used to correlate the Thermal and Structural Math Models, and validate that they are sufficiently accurate, with respect to thermal, thermal distortion, long-term material stability, and dynamics, to verify the short-term stability requirements.

Additionally, the Model Validation Plan shall define the process used to develop multiplicative

MUFs for thermal distortion, long-term material stability, and jitter that bound prediction error at the IC level that will be incorporated into the system level MUFs.

3.2.26 LLVIS Contamination Control Implementation Plan

Title: LLVIS Contamination Control Implementation Plan CDRL No: SE-8

SOW Paragraph: 4.5-B

Use:

To provide the details of how the contractor contamination control program will be implemented; this information will be reviewed to ensure consistency with the WFIRST contamination requirements.

Applicable Documents: WFIRST-PLAN-06635 WFIRST Contamination Control Plan

Maturity/Delivery Date:

Draft: by LLVIS PDR

Final: by LLVIS MRR

The CCIP shall be prepared in compliance with the WFIRST Contamination Control Plan

(WFIRST-PLAN-06635), and shall:

1. Identify the contamination sensitive hardware

2. Contain a contamination budget for all phases of the ground and flight operations conducted by the Contractor

3. Reference or include as an appendix the analyses that were used to derive the contamination budget

4. Provide methodology for achieving and maintaining the required cleanliness, including bake-out, purge, cleaning, and bagging

5. Specify which measurement and monitoring methods are used, and provide procedures or references where the methods differ from the practices specified in this document

6. Define the sequence of cleanliness activities, frequency of verification, and the capabilities of the facilities which will be occupied

7. Define the roles and responsibilities of the organizations and individuals which will implement the requirements

8. Provide descriptions of when and how the cleanliness activities are to be reviewed

9. Provide information on design features for contamination control and materials selection criteria

10. Provide information on how to train personnel and assess them

11. Define how to deal with situations that may result in cleanliness specifications not being achieved

12. Define single-point failure modes that can affect cleanliness, including equipment failures and human errors

13. Define the risk of cross-contamination between hardware elements

14. Provide references to procedures

3.2.27 Structural Analyses Reports

Title: Structural Analyses Reports CDRL No: SE-9

SOW Paragraph: 5.1-C

Use:

To aid in making judgments and decisions regarding numerous specific technical subjects relative to the LLVISs and GSE design. These analyses shall be reviewed periodically through the program both formally (design reviews), and informally (with GSFC Mechanical engineers).

Place/Time/Purpose of Delivery:

- Preliminary: 1 month…