ATTACHMENT 1

Performance Work Statement NY Exhibit Fabrication Services 1.0

BACKGROUND

1.1 The National Archives and Records Administration (NARA) is an independent Federal agency whose mission is to preserve and to provide continuing access to the historically valuable records of the Federal Government. These records are indispensable for documenting the rights of citizens, accounting for the actions of Federal officials, and understanding the national experience. Both the Government and the public rely on us to meet an almost unlimited range of information needs from our records. To help achieve its mission, NARA has facilities nationwide including, the National Archives Building (Archives I) in Washington, D.C., the National Archives at College Park (Archives II) building in College Park, Maryland, Presidential Libraries, Regional Record Service Facilities, and the Federal Register.

1.2 For the opening of the new National Archives at New York City facility in the Customs House in Lower Manhattan at 1 Bowling Green in April 2012, NARA will develop an exhibit program to include a 1,500 square foot temporary exhibit with brochure, a 40 square foot permanent exhibit area, modified layout of an existing exhibit component “NARA Across America” in the lobby (Attachment 3), exterior banners, and a wayfinding approach with a single unified “standard” graphic design.

1.2.1 The 1,500 square foot temporary exhibit of facsimiles will highlight New York documents with an accompanying brochure.

1.2.2 The 40 square foot permanent exhibit area within the Educational space on the third floor will display original documents.

1.2.3 An existing exhibit component from the Washington, DC Public Vaults exhibit titled “NARA Across America” will be displayed in or adjacent to the lobby.

1.2.4 External banners will announce the opening of the National Archives at New York City and the opening exhibit.

1.2.5 In addition, the wayfinding approach will address the entry, rotunda floor lobby, and the third floor location of the National Archives. A standard design motif for wayfinding will use the branding logo for the National Archives at New York City.

1.3 The NARA project manager and curator for the exhibit will be from the Washington, DC, exhibits office, working with a team from the National Archives at New York to determine exhibit content, including themes, selections, and text.

1.4 The purpose of this order is to procure design services for a 1,500 square foot temporary exhibit with brochure, a 40 square foot permanent exhibit area, layout/modification of an existing exhibit component, exterior banners, and a wayfinding approach with a single unified “standard” graphic design.

2.0

SCOPE

2.1 The Contractor shall provide all labor, facilities, materials, equipment, and travel, except as otherwise specified in this order, to provide Exhibit Design Services for the temporary exhibit, brochure, small permanent exhibit, layout/modification of an existing exhibit component, banners, and wayfinding approach with standard design for NARA in accordance with the Performance Work Statement (PWS). All design and production work including any pertinent government reviews must be completed by September 26, 2011.

2.2 The Contractor shall design to a production budget of $85,000. Included in the production budget are all exhibit elements (excluding exhibit cases and some AV equipment that will be Government-furnished) specified in the design, such as modular/moveable walls and pedestal fabrication, labels, mounts, frames, graphics, shipping, and installation.

3.0

EXHIBIT FABRICATION SERVICES

3.1 Phase 1: 50% Design 3.1.1 The Contractor shall participate in a meeting 3.1.1.1 Travel to the National Archives at New York City. Travel to the National Archives at New York City at 201 Varick Street, 12th Floor, for two (2) days by the Lead Designer. A Charette/Workshop with the NARA exhibit team and the NARA Project Manager will take place one day. The second day will be used to familiarize the Lead Designer with the exhibit and office spaces at the Custom House facility (1 Bowling Green) and allow time for measurements of exhibit spaces as well as review and measuring of preliminary exhibit selections (see below).

3.1.1.2 Participate in the Charette/Workshop. The Contractor shall participate in discussion of exhibit themes, typical selections, and bubble plans for the temporary exhibit. Discuss design approach. Identify requirements for selections and approach to mounts and framing. Refine schedule and deadlines.

3.1.1.3 Measure Exhibit Space and Selections. The Contractor shall assess and confirm measurements of the available exhibit spaces at the Custom House. The Contractor shall assess and confirm the dimensions of selected documents and artifacts at the Varick Street facility.

3.2 Phase 2: Prepare 50% Design 3.2.1 The Contractor shall develop a 50% Design. The 50% Design will include a conceptual floorplan and typicals of graphic design and label layouts. Four (4) copies of the design shall be submitted to the NARA Project Manager for review and approval.

3.2.2 Plan Format. The Contractor shall prepare 50% Design. At a minimum, the 50% Design shall contain the following:

3.2.2.1 Conceptual floor plan showing general layout of themes with intended elements, such as fabricated walls, pedestals, exhibit cases, and oversize elements.

3.2.2.2 Drawings need to provide a broad overview of the exhibits and their general appearance, and elevations of typicals;

3.2.2.3 Typicals of graphic design and text hierarchy;

3.2.2.4 Initial recommendations for the wayfinding approachand

3.2.3 Schedule with dates for completion of the assigned work.

3.2.4 Prepare Production Estimate. Prepare and submit a preliminary estimate of the cost to fabricate and install the proposed exhibits and collateral materials. The estimate shall fall within the production cost target identified.

3.2.5 Prepare Samples. Provide samples for all colors, materials, frames, mats, and finishes specified for the exhibits. The Contractor shall provide three (3) identical sample boards.

3.2.6 Make Presentation Trip 3.2.6.1 Travel to the National Archives at New York City. Travel to the National Archives at New York City for one (1) day. The Contractor will present the 50% Design to the NARA exhibit team and the NARA Project Manager.

3.2.6.2 Make Presentation. One (1) 8-hour day is required for the Presentation. The Presentation shall include review of the design as well as finalization of selections.

3.2.7 Revisions. Submit the revised 50% Design based on comments compiled by the NARA Project Manager. Provide revised design pages and/or samples to the NARA Project Manager.

3.3 Phase 3: Develop 100% Design and Provide Production-Ready Graphic Material.

3.3.1 The Contractor shall prepare 100% Design. Use the approved Revised 50% Design to develop 100% Design. The 100% Design submittal shall include:

3.3.1.1 Design Control Drawings with detailed floor plan; elevations; typical construction details; frame and mount schedule; and listing of all colors, materials, and finishes to be used;

3.3.1.2 Prepare Exhibit Layouts for all graphic/text panels, use the following software applications, AutoCad 2002; Adobe InDesign, Photoshop, and Illustrator; Quark Express. Color shall be actual in size or proportional to the final output size;

3.3.1.3 Color and Finish Sample Boards;

3.3.1.4 Final Production Estimate; and 3.3.1.5 Project Schedule 3.3.2 Make Presentation Trip 3.3.2.1 Travel to the National Archives at New York City. Travel to the National Archives at New York City for one (1) day. The Contractor will present the 100% Design to the NARA exhibit team and the NARA Project Manager.

3.3.2.2 Make Presentation. One (1) 8-hour day is required for the Presentation. The Presentation shall include review of the design as well as finalization of selections.

3.3.3 Revisions. Submit the revised 100% Design based on comments compiled by the NARA Project Manager. Provide revised design pages to the NARA Project Manager.

3.3.4 Produce Production-Ready Graphic Material 3.3.4.1 Prepare Production-Ready Graphic Material. Prepare computer-generated material that is ready for output by others that includes hi-resolution scans of graphic material, final text, colors and graphic treatments. Resolution of material shall be appropriate for the required final size. Provide full copies of the material and the computer discs that include all application and source files and complete documentation of source files. Use the following software applications--Adobe InDesign, Photoshop, and Illustrator; Quark Express. Output shall be actual size or proportional to the final output size. Final output device shall be identified and the color palette set for color matching.

3.3.4.2 Submit Production-Ready Graphic Material. Submit Production-Ready Graphic Material to NARA Project Manager for review and approval.

3.3.4.3 Revise Production-Ready Graphic Material. Submit the revised Production-Ready Graphic Material based on comments compiled by the NARA Project Manager. Provide revised Production-Ready Graphic Material to the NARA Project Manager.

4.0

OPTIONAL DESIGN

4.1 At the option of the Government, the following element may be exercised by the Contracting Officer. If an option is exercised, it will be incorporated into the order schedule:

4.2 The Contractor shall design wayfinding elements based on the wayfinding approach. In addition, all production-ready graphic material associated with the design will be produced.

5.0

PROJECT MANAGEMENT

5.1 The Contractor shall provide one Project Manager (PM) who will manage all elements of the order from start to finish. The Project Manager will be the primary point of contact between the Contractor and all subcontractors, and the NARA Project Manager, for all work performed under this order.

5.2 The PM must have full authority to act for the Contractor on all matters relating to operation of this order. Be available to take or respond to telephone calls or electronic mail messages during normal hours of operation (8:30 am - 5:00 pm ET). Establish office procedures to ensure that messages are relayed to the PM when out of the office. Emergency messages from the NARA Project Manager shall be responded to the same day they are received. All non-urgent messages from the NARA Project Manager shall be responded to in no less than two days.

5.3 The PM must prepare all order meeting agendas and meeting minutes and submit them to the NARA Project Manager for review and approval. The PM must also maintain and track project schedules to ensure that the project is completed according to the schedule.

5.4 The PM must prepare and submit information to the NARA Project Manager for review and approval. For the purpose of this order, a submittal is defined as all samples, documents (i.e., drawings, schedules, etc.), electronic files, and other materials that together represent the level of development of work at a given time, and shall be provided by the Contractor to the NARA Project Manager for review and approval.

5.5 The PM must review all submittals for legibility, accuracy, completeness, and compliance with order requirements. Accurately cross-reference all details within any single or multiple document(s). Receive and review all submittals that have been reviewed by the NARA Project Manager.

5.6 The PM must receive all NARA-Furnished materials and ensure that they are provided to the appropriate unit and/or person within the Contractor’s organization for use in the project. Inform the NARA Project Manager when Government--furnished materials are unsatisfactory for use in the project within seven days after receipt.

6.0

CONTRACTOR DELIVERABLES

6.1 All deliverables shall be submitted electronically in an appropriate MS Office application and in Contractor format to the COR for review and approval.

6.2 Deliverables will become the property of the Government.

6.3 The following lists the deliverables required under this order:

Deliverable
Notes
Due Date

Initial Meeting

Within 3 days of award.

Submission/Presentation of 50% Design

*Contractor to propose schedule.

Submission of 50% Design revisions

*Contractor to propose schedule.

Submission/Presentation of 100% Design
Four (4) copies of each design shall be submitted to the NARA Project Manager for review and approval. Develop 100% Design in both electronic and hard copy format.
*Contractor to propose schedule.

Submission of 100% Design revisions

*Contractor to propose schedule.

Submission of Production Ready Graphic Material

*Contractor to propose schedule.

Submission of Production Ready Graphic Material revisions

*Contractor to propose schedule.

6.4 Unless otherwise noted the COR will have 7 to 10 business days to review all deliverables.

7.0

GOVERNMENT FURNISHED PROPERTY AND EQUIPMENT

Government-furnished material during the design process will include:

7.1 An Exhibit Narrative with defined themes,

7.2 Bubble Plan,

7.3 Existing Floorplan (see Attachment 2) and updated floorplans (renovation of the 3rd floor spaces),

7.4 AV equipment list,

7.5 Master Selection List of documents and artifacts with preliminary measurements, draft and final Exhibit Text, and lo-and hi-resolution Digital Files for selections as needed.

7.6 Existing exhibit furniture includes cases and some AV equipment.

8.0

CONTRACTOR FURNISHED PROPERTY AND EQUIPMENT

The Contractor must provide all equipment and supplies, not furnished by the Government, required to perform in accordance with the requirements of this PWS.

9.0 CONTRACTOR QUALITY CONTROL. The Contractor shall develop and maintain quality control programs to ensure services are performed in accordance with the PWS and commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify and prevent the occurrence of defective services. The Contractor shall develop quality control procedures to remediate any processes where acceptable quality levels are not met. The Contractor will comply with all specification requirements for the required services.

9.1 Performance and Inspection. The Government will evaluate the Contractor's performance under this order. The COR will perform surveillance on those tasks listed in Attachment 5, Performance Requirements Summary (PRS), and will record all surveillance observations.

ATTACHMENT 2

Existing Floorplan for the Customs House

1 Bowling Green, New York City Note: See separate file

ATTACHMENT 3

“NARA Across America”

Note: Photograph of existing exhibit component from the Washington, DC Public Vaults exhibit

ATTACHMENT 4

Quality Assurance Surveillance Plan 4.1

INTRODUCTION:

This Quality Assurance Surveillance Plan (QASP) has been developed to provide the Quality Assurance Evaluator / Contracting Officer’s Representative (COR) an effective and systematic surveillance method for each listed service on the Performance Requirements Summary (PRS) in this order. The QASP describes a systematic method to evaluate the services the Contractor is required to furnish.

Any non-conformance with order requirements is a “defect.” A defect may be recorded for each item evaluated that failed to meet the standards as required by the subject SOW paragraph(s). Examples of defects that will be recorded include, but are not limited to:

a. Failure to perform a required task;

b. Failure to take corrective action to prevent reoccurrence of less than satisfactory performance; or

c. Performance of less than satisfactory work (quality work consists of completing the work in accordance with the appropriate SOW specifications, NARA requirements, manufacturer’s recommendations, or best industry practices).

Quality Assurance is based on the premise that the Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the order. The Government will follow guidance when performance is other than satisfactory.

Good management and use of an adequate quality control (QC) plan will allow the Contractor to operate within specified performance requirements. The COR shall be objective, fair, and consistent in evaluating Contractor performance against order requirements and standards. The main emphasis is on quality performance.

4.2

ACTUAL SURVEILLANCE:

Actual surveillance will be performed on a periodic basis or 100% as specified in the PRS in conjunction with the Statement of Work.

If satisfactory performance is not achieved, the COR will determine the possible cause of the less than satisfactory performance. The COR will initiate a Contract Discrepancy Report (CDR) for all defects that could not be re-performed and for all defects not corrected by the Contractor in a timely or satisfactory manner when requested by the Government. The COR will submit the CDR documentation recording the less than satisfactory performance and stating a recommended action to the CO including any proposed order deductions.

4.3

SURVEILLANCE METHODS:

Services shall have the results of the surveillance documented. The surveillance methods the Government will use to evaluate the Contractor’s performance for the listed tasks are 100% surveillance or periodic surveillance. Customer complaints will not solely be used to judge actual performance but will be used in conjunction with the above surveillance methods as an indicator of performance or as areas to emphasize further or future surveillance.

4.4

INFORM CONTRACT SITE-SUPERVISOR:

a. Regardless of the surveillance method, the Contractor should be kept informed of performance status. The COR will notify the Site-Supervisor of any defect(s) to be corrected. The time to re-perform and correct defects after notification will vary depending on the type of defect, the item being inspected, the level of the item (i.e., routine, urgent, or emergency), etc. The COR will inspect re-performed or corrected discrepancies. If corrected properly and timely, the defect(s) will not result in a payment deduction. However, the COR will maintain all documentation for file maintenance. Performance issues should also be an item of discussion during the weekly Contract Site-Supervisor / COR program status meetings.

b. CDR’s should be used to officially notify the Contractor of a performance problem. CDR use includes notifying the Contractor of:

(i) Non-performance or less than satisfactory performances when the Government elects not to have the Contractor re-perform the service;

(ii) Failure of the Contractor to re-perform non-performed or less than satisfactory performed services;

(iii) Non-performed or less than satisfactory services that cannot be re-performed due to the nature or the timing of the required services; and

(iv) Continuous, less than satisfactory service whether the service is re-performed or not.

c. Critical performance problems should be immediately communicated with a follow-up written CDR. The COR will complete the CDR and forward it to the COR for review and approval. The COR will sign and forward the CDR to the Contractor PM for the Contractor’s response and comments. The Contractor will have 7 calendar days (or such lesser time that the COR stipulates) to complete a response. After evaluating the Contractor’s response, the COR will forward the Contracting Officer any CDR requiring further action (order interpretation, problem resolution, reduced payments, deficiency letter notification, cure notice, etc.). The COR will provide the Contracting Officer recommended actions with supporting rationale.

4.5

REVISIONS TO QASP:

Revisions to this surveillance plan are the responsibility of NARA, the COR, and the Contracting Officer.

ATTACHMENT 5

Performance Requirements Summary 5.1 PERFORMANCE REQUIREMENTS SUMMARY (PRS). The PRS captures key requirements of the Statement of Work (SOW) at an outcome level (performance standard) and states the performance level and method of surveillance for the requirement. The absence of any order requirement from the PRS does limit the rights or remedies of the Government under any other provisions of the order.

5.2

Method of Surveillance. The PRS provides the surveillance method(s) the Government will use to evaluate the Contractor’s performance for the listed tasks. The primary surveillance methods used will be 100% surveillance, periodic surveillance, or customer complaints.

5.3

Government Quality Assurance. The Quality Assurance Surveillance Plan, Attachment 4, describes how the Government will inspect, in conjunction with this PRS, and how the COR, other performance evaluators, the Contractor, and the Contracting Officer will communicate to ensure satisfactory performance of order requirements.

PERFORMANCE REQUIREMENTS SUMMARY

REQUIREMENT SUMMARY ITEM (RS)
PERFORMANCE STANDARD
PERFORMANCE LEVEL
METHOD OF SURVEILLANCE
(RS-1) Project Management
The Contractor will provide a Project Manager (PM) for this effort. The Contractor's PM must be available as needed to ensure the requirements of the order are completed satisfactorily. The COR is kept informed on the status of complete order performance.
Satisfactory
Monthly
(RS-2) Exhibit Fabrication
The Contractor will provide exhibit fabrication services in accordance with the PWS.
Satisfactory
Periodic Surveillance
(RS-3) Deliverables
Deliverables are timely, accurate, complete, and provide the required information.
Satisfactory
Periodic Surveillance
(RS-4) Quality control
The QC plan has been submitted and approved by the COR. Personnel must conduct the QC program in accordance with the COR approved Contractor QC plan. QC inspections are completed as scheduled and are comprehensive enough to ensure order requirements are met. The QC program causes corrective action is to be taken to prevent recurrence of unacceptable performance and recognized valid customer complaints regarding lack of quality service performance.
Satisfactory
Periodic Surveillance

ATTACHMENT 6

NARA Terms and Conditions (Addenda to FAR 52.212-4)

1. FINAL DELIVERY/PLACE OF PERFORMANCE/ORDER TYPE

A. Final Delivery: All design and production work including any pertinent government reviews must be completed by September 26, 2011.

B. Place of Performance: Work under this order shall be performed at the Contractor’s facility.

C. Order Type: This is firm-fixed price order.

2. SUBMISSION OF FORMS AND REPORTS

All postage and fees relating to submitting information, including, but not limited to, forms, reports, etc., to the Contracting Officer (CO) or the Contracting Officer's Representative (COR) shall be prepaid by the Contractor.

3. MARKING OF INFORMATION OR REPORTS

All information or reports submitted shall prominently show on the cover of the report:

Name and business address of Contractor;

Contractor’s point of contact for report and phone number;

Contract number and/or Order number;

Contracting Officer’s name, phone number and address; and

Name and address of Contracting Officer's Representative (COR).

4. GOVERNMENT ORDER ADMINISTRATION

A. This order will be administered by:

National Archives and Records Administration

Acquisition Services Division, Code NAA

Room 3340

8601 Adelphi Road

College Park, MD 20740-6001

B. Order Administration:

TBD

Telephone:

The Contracting Officer (CO) has the overall responsibility for the administration of this order. Written communication to the Contract Specialist (CS) must make reference to the order number and must be mailed, postage prepaid, to the above address.

C. Contracting Officer (CO)

LaVerne Fields laverne.fields@nara.gov

The CO alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify, or deviate from the order terms, conditions, requirements, specifications, details and/or delivery schedules; make final decisions on disputed deductions from order payments for non-performance or unsatisfactory performance; terminate the order for convenience or default; and issue final decisions regarding order questions or matters under dispute. However, the CO may delegate certain other responsibilities to authorized representatives.

5. DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE (COR)

COR: TBD

Phone:

Fax:

E-Mail: @nara.gov

A. The individual named above is designated as the Contracting Officer’s Representative (COR) to assist the CS in the discharge of the CS’ responsibilities. The COR is responsible for monitoring, giving progress reports to the CS, and overall technical surveillance of services to be performed under this order and should be contacted regarding questions or problems of a technical nature. In no event will any understanding or agreement, modification, change order, or other matter deviating from the terms of the basic order between the Contractor and any person other than the CO be effective or binding upon the Government.

B. When, in the opinion of the Contractor, the COR requests effort outside the existing scope of the order, the Contractor must promptly notify the CS in writing.

C. No action will be taken by the Contractor under such technical instruction unless the CO has issued a contractual change.

D. The responsibilities of the COR include, but are not limited to, the following:

1) Serve as the point-of-contact through which the Contractor can relay questions or problems of a technical nature through the CS to the CO;

2) Be responsible for the inspection and acceptance of the services performed and determining the adequacy of performance by the Contractor in accordance with the terms and conditions of this order;

3) Conferring with representatives of the Contractor regarding any non-performance or unsatisfactory performance; following through to assure that all non-performance or unsatisfactory performance is performed/corrected or payment adjustment is recommended through the CS to the CO;

4) Review and certify invoices in accordance with invoicing instructions of the order. Maintain a file with copies of these documents;

5) Review and evaluate Contractor’s IDIQ estimates, furnish comments, and recommendations through the CS to the CO;

6) Advise the CS of any performance problems and make recommendations for corrective action to correct performance issues;

7) Furnish the CS with any requests for change, deviation, or waiver (whether generated by Government personnel or Contractor personnel), including all supporting paperwork in connection with such change, deviation, or waiver; and

8) Submit a written evaluation through the CS to the CO within 60 days of order completion. The evaluation must include:

(i) The quality and timeliness of the Contractor’s performance; and

(ii) A statement as to the uses made of any deliverables furnished by the Contractor.

E. In addition to the specific duties as listed above, you are also responsible for knowing the employment status of the Contractor’s personnel working at NARA. When you are notified that the Contractor’s employee is leaving the order or the work site has changed, you must notify NASS of the new status. You should also ensure that the Contractor’s employee returns the NARA issued identification and the proximity card for AII when they no longer need access to the buildings. Your signature is required on the Contractor’s Identification Card Authorization in order for the Contractor’s employee to be issued a NARA identification badge and a proximity card in the case of an AII work site. An identification badge and proximity card will not be issued without a signed Authorization that includes an expiration date. Please refer to NARA Directive 272 for more information on Contractor’s personnel’ identification badge and proximity card issuance.

6. INVOICE SUBMISSION REQUIREMENTS

A. All original invoices submitted for payment shall be sent electronically to the following e-mail address: NAR@BPD.TREAS.GOV. Protected Microsoft Excel Files are the preferred format; however, Adobe Acrobat Portable Document Format (PDF) and Microsoft Word are also acceptable. To receive a free notification of your electronic payment, register at http://fms.treas.gov/paid

B. If electronic invoices are not possible

1) Original invoices shall be sent to:

ARC/ASD/NAR

Avery Street 3-F

Bureau of the Public Debt

P.O. Box 1328

Parkersburg, WV 26106-1328

2) One copy to the Contract Specialist (identified above).

3) One copy to:

National Archives and Records Administration

Attn: COR (TBD)

Room

8601 Adelphi Road

College Park, MD 20740-6001

Email: @nara.gov

For Bureau of Public Debt paying office (ARC/ASD/NAR) payment and invoice questions, call 304-480-7000

C. The Contractor's invoice shall include the following information and/or attached documentation:

(1) Name of the business concern and invoice date;

(2) The complete contract number and/or delivery/task order number preceded by the letters NAMA;

(3) Description, price, and quantity of services actually delivered or rendered and segregated by CLIN and/or SUBCLIN number(s);

(4) Payment terms;

(5) DUNS number;

(6) Taxpayer's Identification Number (TIN);

(7) Government Fund Cite; and

(8) Government Organization ordering the items

D. All invoices must be submitted according to the following:

(1) CLIN 0001 Exhibit Design and Production services. The Contractor may invoice:

i. 10% of total CLIN amount upon acceptable completion of Phase 1, 50% Design;

ii. 35% of total CLIN amount upon acceptable completion of Phase 2, Prepare 50% Design; and

iii. 55% of total CLIN amount upon acceptable completion of Phase 3, Develop 100% Design and Provide Production-Ready Graphic Material.

(2) CLIN 0002 Travel and CLIN 0003 Optional Design services. The Contractor may invoice for permissible travel (note travel requirements) and optional design services in accordance with the PWS. Please note the not-to-exceed amounts listed for both CLINs.

E. All invoices will be paid using information from the Central Contractor Registration (CCR). Therefore, payment will be made to the EFT information that matches the DUNS number for this award.

7. INVOICE CERTIFICATION

A. The COR will review a copy of each invoice for correctness, services performed, etc. The COR will certify the invoice and:

(1) Submit it to the payment office for payment; or

(2) Authorize reimbursement by Government purchase card.

B. If the COR disagrees with the invoice, the COR will immediately:

(1) Notify the Contracting Officer and paying office;

(2) Withhold certification or, if applicable, Government purchase card reimbursement;

(3) Contact the Contractor to resolve any discrepancies;

(4) Obtain a corrected invoice; as appropriate; and

(5) Forward the corrected invoice to the paying office or authorize Government purchase card reimbursement.

C. If only a portion of the invoice costs are in dispute, the CO or COR, if assigned, will certify only the undisputed costs and, as appropriate, submit the invoice to the payment office for partial payment or authorize only partial Government purchase card payment. The COR will work with the Contractor to resolve any remaining disputed costs.

D. If the COR cannot resolve the invoice discrepancy with the Contractor, or if a problem has been noted with the Contractor’s performance, the COR must notify the Contracting Officer, in writing, with details of the problem.

8. FINAL PAYMENT

Before final NARA payment is made, the Contractor must furnish to the CO a written release of all claims against the Government arising by virtue of the order, other than claims in stated amounts as may be specifically excluded by the Contractor from the operation of the release. If the Contractor’s claim to amounts payable under the order has been assigned under the Assignment of Claims Act of 1940, as amended (31 U.S.C. 203, 41 U.S.C. 15), a release may also be requested of the assignee. To ensure that all necessary adjustments for non-performance or unsatisfactory performance have been made and a release of claims has been submitted before the order is closed out, the final NARA payment will be made in thirty (30) calendar days after receipt of a proper invoice, date of completion of performance, or receipt of release of claims by the CO, whichever is later.

9. OPTIONS

A. The Government will evaluate offers for award purposes by adding the total price for all optional contract line item(s) (CLIN) to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the optional contract line item(s).

B. The Government may require the Contractor to perform services and/or provide supplies identified as “optional” and outlined in the PWS. The Contracting Officer may exercise the optional contract line item(s) by written notice to the Contractor within 15 days before the contract expires.

10. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

(IAW FAR 52.107(b))

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.arnet.gov/far http://farsite.hill.af.mil/vffara.htm a.

FAR 52.245-1 GOVERNMENT PROPERTY (AUG 2010)

ATTACHMENT 7

Wage Determination http://www.wdol.gov/wdol/scafiles/std/05-2103.txt

WD 05-2103 (Rev.-10) was first posted on www.wdol.gov on 06/22/2010

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2005-2103

Shirley F. Ebbesen Division of | Revision No.: 10 Director Wage Determinations| Date Of Revision: 06/15/2010

States: District of Columbia, Maryland, Virginia Area: District of Columbia Statewide

Maryland Counties of Calvert, Charles, Frederick, Montgomery, Prince George's, St Mary's

Virginia Counties of Alexandria, Arlington, Fairfax, Falls Church, Fauquier, King George, Loudoun, Prince William, Stafford

**Fringe Benefits Required Follow the Occupational Listing** http://www.wdol.gov/wdol/scafiles/std/05-2375.txt WD 05-2375 (Rev.-9) was first posted on www.wdol.gov on 06/22/2010

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2005-2375

Shirley F. Ebbesen Division of | Revision No.: 9

Director Wage Determinations| Date Of Revision: 06/15/2010

State: New York Area: New York Counties of Bronx, Kings, New York, Putnam, Queens, Richmond, Rockland, Westchester

OCCUPATION NOTE:

Janitor: The rate for the Janitor occupation applies to Putnam, Rockland, and Weschester Counties only. See Wage Determination 1977-0225 for wage rates and fringe benefits for Bronx, Kings, New York, Queens, and Richmond Counties.

**Fringe Benefits Required Follow the Occupational Listing**

Note: These determinations have been included for reference. However, since the majority of work will be performed at the contractor’s facility, the applicable wage determination will be included in the final award document.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .