Questions and Answers 9/25/2025 N6893625Q5166 – Fence & Gate Installation at 8 Acres
| RFI # |
| Question |
| Government Response |
| Date Answered |
| 1 |
| Confirm that a 6-foot fence height is acceptable (UFC 4-022-03 recommends 7 ft minimum excluding barbed wire outriggers). |
| 6 Foot fence is acceptable. |
| 9/25/2025 |
| 2 |
| Confirm required chain link fabric gauge (UFC requires minimum 9-gauge, 2” mesh openings). |
| Confirmed |
| 9/25/2025 |
| 3 |
| Confirm if a bottom rail is required or if galvanized bottom tension wire is acceptable. |
| Bottom tension wire is acceptable |
| 9/25/2025 |
| 4 |
| Confirm if 3-strand barbed wire is required for this site. |
| No barbed wire is required |
| 9/25/2025 |
| 5 |
| Confirm total width for each lockable drive-through gate (assumed 24 ft, two 12-ft leaves each). |
| Confirmed |
| 9/25/2025 |
9/25/2025
| 6 |
| Confirm whether manual operation is acceptable or if powered gate operators are required. |
| Manual operation |
| 9/25/2025 |
| 7 |
| Confirm required compacted thickness for decomposed granite (DG). |
| 6 inches |
| 9/25/2025 |
| 8 |
| Confirm if 90% compaction to the sub (existing) grade is required. |
| Confirmed 90% compaction |
| 9/25/2025 |
| 9 |
| Confirm any color or gradation requirements for DG. |
| No color requirements |
| 9/25/2025 |
| 10 |
| Confirm if an as-built utility plan will be provided and identify any known underground utilities along the fence path. |
| No as-builts will be provided. |
Refer to Part 2 of the RFP #12 Existing Underground Utilities.
: Verify on-site utilities and have them marked out by an independent 3rd party utility locator service prior to the start of construction. Where existing piping, utilities, oil and gas lines, and underground obstructions of any type that are to remain are indicated in locations to be traversed by new piping, ducts, and other work provided herein, and such are not indicated or specified to be removed, the elevations of the existing utilities and obstructions shall be determined before the new work is laid closer than the nearest manhole or other structure at which an adjustment in grade could be made. Obtain required dig permits and notify the CORTPOC 15 calendar days prior to any excavation.
9/25/2025
| 11 |
| Confirm if removal of any existing structures, vegetation, or debris is within contractor’s scope. |
| The existing fence line on the south and west run will need to be removed. |
| 9/25/2025 |
| 12 |
| Confirm if compaction testing of DG and concrete break tests are required as part of QC. |
| Not required. |
| 9/25/2025 |
| 13 |
| Confirm minimum warranty duration for fence and gate work. |
| Per Part 2 of the RFP |
# 17 Warranty Warrant all materials and construction/installation work for not less than one year after final acceptance of the work, except as otherwise indicated. If required to provide remedial repair of previously installed work due to latent defect or unacceptable work performance, warrant the repaired work for one year after the completion and acceptance of the repair. For warranted items, furnish the manufacturers’ original written warranty accompanied by a copy of the supplier’s receipt showing place of purchase, telephone number of supplier, address, delivery order number if applicable, and ticket number.
9/25/2025
| 14 |
| Confirm if as-built drawings are required at project closeout. |
| Not required |
| 9/25/2025 |