19R0003_Solicitation.docx

DOCX document 98 KB Posted

Attached to
Avionics Mechanical Assemblies
Solicitation number
N6893619R0003
Issued by

About this file

N6893619R0003 Solicitation

View the file

Other files

File Type Posted
19R0003_Solicitation_Amendment.docx DOCX document
Solicitation_Amendment.docx DOCX document
Amended_Solicitation_19R0003.docx DOCX document
19R0003_Solictiation_Amendment.docx DOCX document
19R0003_Solicitation_Amendment.docx DOCX document
19R0003_Attachments.zip ZIP file
SOW.doc DOC document
N68936-19-R-0003_Drawings.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6893619R0003

Section A - Solicitation/Contract Form

CLAUSES INCORPORATED BY FULL TEXT

FOR YOUR INFORMATION:

The following addresses and points of contact are provided:

Name:Neil Flint
Phone: 760-939-3580
DSN:437-3580
FAX:760-939-3095
Email address: neil.flint@navy.mil

Name: Chris Bigelow, Procurement Contracting Officer

Phone: 760-939-2530
DSN: 437-2530
FAX: 760-939-3095
Email Address: christopher.bigelow@navy.mil

U.S Postal Service Mailing Address:

COMMANDER
CODE 254430D (N. Flint – 760-939-3580)
NAVAIRWARCENWPNDIV
1 Admin Circle. Mail Stop 1303
China Lake, CA 93555-6108

Direct Delivery Address (UPS, FedEx, etc):

COMMANDER
CODE 254430D (N. Flint)
NAVAIRWARCENWPNDIV
BLDG 02334, Mail Stop 1303
China Lake, CA 93555-6108

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Avionics Test Set Part 3156193-4

FFP

FIRST ARTICLE: The contractor shall manufacture, test, package, and deliver one (1) set of Avionics Test Set Part 3156193-4 in accordance with the Statement of Work (SOW) in Section C of the solicitation and the Drawings listed in Section 2 of the SOW. The Government will perform the First Article Acceptance Test (FAAT) on the first Avionics Test Set Part 3156193-4 delivered in accordance with the SOW/drawings. The contractor shall not proceed with manufacturing the additional test sets until approval of the First Article by the Government.

FOB: Destination

NSN: 66501000000829

PURCHASE REQUEST NUMBER: 1300747643

PSC CD: 6650

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20
Each

Avionics Test Set Part 3156193-4

Upon approval of the First Article, the contractor shall manufacture, test, package, and deliver Avionics Test Set Part 3156193-4 in accordance with the Statement of Work (SOW) in Section C of the solicitation and the drawings listed in Section 2.0 of the SOW.

Production Year 1 (11 Oct 2019 to 10 Oct 2020)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 2 (11 Oct 2020 to 10 Oct 2021)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 3 (11 Oct 2021 to 10 Oct 2022)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 4 (11 Oct 2022 to 10 Oct 2023)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 5 (11 Oct 2023 to 10 Oct 2024)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

FOB: Destination

NSN: 66501000000829

PURCHASE REQUEST NUMBER: 1300747643

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Avionics Test Set Part 3156193-10

FIRST ARTICLE: The contractor shall manufacture, test, package, and deliver one (1) set of Avionics Test Set Part 3156193-10 in accordance with the Statement of Work (SOW) in Section C of the solicitation and the Drawings listed in Section 2 of the SOW. The Government will perform the First Article Acceptance Test (FAAT) on the first Avionics Test Set Part 3156193-10 delivered in accordance with the SOW/drawings. The contractor shall not proceed with manufacturing the additional test sets until approval of the First Article by the Government.

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20
Each

Avionics Test Set Part 3156193-10

Upon approval of the First Article, the contractor shall manufacture, test, package, and deliver Avionics Test Set Part 3156193-10 in accordance with the Statement of Work (SOW) in Section C of the solicitation and the drawings listed in Section 2.0 of the SOW.

Production Year 1 (11 Oct 2019 to 10 Oct 2020)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 2 (11 Oct 2020 to 10 Oct 2021)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 3 (11 Oct 2021 to 10 Oct 2022)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 4 (11 Oct 2022 to 10 Oct 2023)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

Production Year 5 (11 Oct 2023 to 10 Oct 2024)

QTYUNITPRICE
1Each$

2 - 4 Each $ 5 or more Each $

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
AMOUNT
0005
Contract Data Requirement List

NSP

Data in accordance with DD 1423-1

Section C - Descriptions and Specifications

STATMENT OF WORK

STATEMENT OF WORK

FOR THE AVIONICS MECHANICAL ASSEMBLIES

1. SCOPE

Introduction

Naval Air Warfare Center Weapons Division (NAWCWD) Point Mugu Code 486M00E intends to procure Avionics Mechanical Assemblies on an Indefinite Delivery Indefinite Quantity (IDIQ) basis. The Avionics Mechanical Assemblies house all of the Electronic Assemblies and the Cable Assemblies to make complete test sets. These test sets are used to test Avionics. NAWCWD Code 486M00E has a requirement to fabricate the following Avionics Mechanical Assemblies for the customers. Listed in paragraph 2.1 are the applicable drawings for the Avionics Mechanical Assemblies:

2. APPLICABLE DOCUMENTS

2.1 Drawings

2.1.1 Avionics Mechanical Assemblies consist of the following drawings (available on CD):

2289616 Rev. -, Transit Case Assembly, RIA/PIA 2902331 Rev. Y, Decal Safety Hazards 2959106 Rev. C, Gasket, Connector 2964480 Rev. F, Stiffener, Horizontal 2964481 Rev. G, Stiffener, Vertical 2964482 Rev. H, Spring, Flat 2964483 Rev. H, Ejector 2964524 Rev. F, Card Retainer, Wedge Lock 3100828 Rev. R, Circuit Card Assembly, 286 CPU (A5) (Prod) 3100848 Rev. B, Heat Sink 3116053 Rev. D, Adhesive, Heat Sink 3116054 Rev. B, Insulator, Thermally Conductive 3156152 Rev. D, Cable Assembly, Tether 3156170 Rev. J, Family Tree, Guided Missile – Launcher Test Set AN/GSM-396 3156175 Rev. F, Circuit Card Assembly, Critical Signals/Power Control (1A2A1) 3156180 Rev. N, Circuit Card Assembly, Analog I/O (1A2A2, 1A2A3) 3156185 Rev. R, Circuit Card Assembly, HARM Communication (1A2A4) 3156189 Rev. K, Circuit Card Assembly, GMLTS Motherboard (1A2A7) 3156193 Rev. D, Test Set, Guided Missile-Launcher, AN/GSM-396 3156194 Rev. H, Adapter Unit Assy, Interface 3156195 Rev. M, Panel Assembly, IAU 3156214 Rev. L, Panel, Interface 3156215 Rev. E, Wall, CCA Chassis 3156216 Rev. F, Gasket, Enclosure 3156217 Rev. B, Panel, CCA Chassis 3156218 Rev. C, Leg, Support 3156219 Rev. B, Cover, CCA Chassis 3156220 Rev. C, Gasket, Connector 3156221 Rev. E, Support, Harness 3156233 Rev. M, Transit Case Assembly, Computer 3156234 Rev. K, Case, Transit 3156235 Rev. G, Interface Assembly, Reprogramming (RIA) 3156239 Rev. J, Saver, Connector Circular 3156244 Rev. B, Decal, Interface Panel 3156248 Rev. K, Circuit Card Assembly, Smart Card 3156255 Rev. F, Enclosure, Lower 3156256 Rev. G, Enclosure, Upper 3156266 Rev. D, Cover, Enclosure 3156267 Rev. B, Housing, Enclosure 3156268 Rev. D, Hinge, Computer Tray 3156269 Rev. E, Tray, Computer 3156270 Rev. C, Hinge, Arm 3156271 Rev. E, Arm, Computer Tray 3156272 Rev. G, Identification Plate, Guided Missile-Launcher Test Set 3156273 Rev. C, Decal, Interface Panel 3156275 Rev. F, Contact, Connector 3156287 Rev. D, Connector Assembly (J2) 3156288 Rev. C, Adapter, Connector 3156289 Rev. E, Clip 3156305 Rev. B, Cable, Retaining 3156307 Rev. B, Spacer, Connector 3156310 Rev. D, Cap, Protective 3156312 Rev. D, Gasket, Bulkhead Connector 3156313 Rev. H, Decal Inventory 3156316 Rev. C, Nut, Receptacle 3156317 Rev. C, Guard, Connector 3156324 Rev. J, Housing Assembly, RF Source 3156325 Rev. D, Transit Case Assembly, RF/ATR 3156331 Rev. D, Housing, Modified, RF Source 3156332 Rev. E, Shield, Dunnage, RF 3156333 Rev. B, Support, RF Component 3156336 Rev. E, Bracket, Support, RF 3156337 Rev. F, Support, Circuit Card Assembly 3156340 Rev. F, Bracket Assembly, RF 3156341 Rev. C, Dunnage Assy, Shield RF 3156342 Rev. B, Screw, Captive, Modified 3156344 Rev. D, Guard Corner 3156345 Rev. C, Block, Bungee, RF 3156347 Rev. G, Circuit Card Assembly – ATR (1A2A6) 3156389 Rev. A, Decal, RIA, Caution 3156392 Rev. E, Shield, RF 3156393 Rev. D, Plate, Reflection 3156394 Rev. D, Plate, Holding, RF 3156395 Rev. E, Hinge 3156396 Rev. F, Holding Assembly, RF 803786 Rev. D, Washer, Spring Curved 704AS3916 Rev. -, Plate Identification Serial Number 704AS12153 Rev. -, Guard, Switch 1164AS452 Rev. D, Captive Fastener

3. REQUIREMENTS

The Contractor shall manufacture, package and deliver all Avionics Mechanical Assemblies as listed below in accordance with the drawings listed in paragraph 2.1.

A. Avionics Mechanical Assemblies (Drawing 3156193-10 Configuration). Each set consists of the following items with the quantity per set as listed below:

1. One (1) Interface Adapter Unit Assembly (Drawing 3156194-5) except Find Numbers 6, 19, 20. IAU Panel Assembly (Drawing 3156195-1), the contractor is not responsible to provide Find Numbers 16, 17, 18, 19, 20, 21, 22, 33, 34, 35, 83.

2. One (1) Computer Transit Case Assembly (Drawing 3156233-8) except Find Numbers 4, 8, 9, 11, 20, 21, 24, 25, 26, 34, 35, 36, 38.

3. One (1) RF/ATR Transit Case Assembly (Drawing 3156325-1) except Find Numbers 6, 7, 16. RF Source Assembly 3156324-2 shall be used instead of 3156324-1. In RF Source Assembly (Drawing 3156324-2), the contractor is not responsible to provide Find Numbers 9, 25. In RF Bracket Assembly (Drawing 3156340-1), the contractor is not responsible to provide Find Numbers 2, 3, 4, 5, 6, 7, 9, 10, 18, 19, 20. In Reprogramming Interface Assembly (Drawing 3156235-1), the contractor is not responsible to provide Find Numbers 3, 28.

4. Five (5) Spring, Flat (Drawing 2964482-1)*.

5. Ten (10) Card Retainer, Wedge Lock (Drawing 2964524-1)*.

6. Ten (10) Ejector (Drawing 2964483-1)*.

7. Five (5) Stiffener, Vertical (Drawing 2964481-1)*.

8. Five (5) Stiffener, Horizontal (Drawing 2964480-1)*.

9. One (1) Heat Sink (Drawing 3100848-1).

10. One (1) Insulator (Thermal) (Drawing 3116054-1).

11. The contractor shall be provided the marking instructions for the following drawings: 3156272, 3156313, 3156234 Note 7(C, D, E) and 704AS3916.

* The contractor is responsible to install the above items 4, 5, 6, 7 and 8 onto the Government supplied Circuit Card Assemblies.

B. Avionics Mechanical Assembly (Drawing 3156193-4 Configuration). Each set consists of the following items with the quantity per set as listed below:

1. One (1) Interface Adapter Unit Assembly (Drawing 3156194-4) except Find Numbers 3, 6, 8. IAU Panel Assembly (Drawing 3156195-2), the contractor is not responsible to provide Find Numbers 16, 17, 18, 19, 20, 21, 22, 33, 34, 35, 83, 95.

2. One (1) Computer Transit Case Assembly (Drawing 3156233-4) except Find Numbers 2, 4, 8, 9, 11, 12, 16, 20, 21, 22, 23, 24, 25, 26, 28, 29, 30.

3. One (1) RF/ATR Transit Case Assembly (Drawing 3156325-2) except Find Numbers 6, 7, 8, 9, 10, 16. RF Source Assembly 3156324-2 shall be used instead of 3156324-1. In RF Source Assembly (Drawing 3156324-2), the contractor is not responsible to provide Find Numbers 9, 25. In RF Bracket Assembly (Drawing 3156340-1), the contractor is not responsible to provide Find Numbers 2, 3, 4, 5, 6, 7, 9, 10, 18, 19, 20. In Reprogramming Interface Assembly (Drawing 3156235-1), the contractor is not responsible to provide Find Numbers 3, 28.

4. Six (6) Spring, Flat (Drawing 2964482-1) **.

5. Twelve (12) Card Retainer, Wedge Lock (Drawing 2964524-1) **.

6. Twelve (12) Ejector (Drawing 2964483-1) **.

7. Six (6) Stiffener, Vertical (Drawing 2964481-1) **.

8. Six (6) Stiffener, Horizontal (Drawing 2964480-1) **.

9. One (1) Heat Sink (Drawing 3100848-1).

10. One (1) Insulator (Thermal) (Drawing 3116054-1).

** The contractor is responsible to install the above items 4, 5, 6, 7 and 8 onto the Government supplied Circuit Card Assemblies

3.1 Items must meet all drawing dimensions, tolerances, specifications requirements and performance requirements in this Section. The Government shall perform the First Article Acceptance Test (FAAT) on the first set of each Configuration of the Avionics Mechanical Assemblies delivered by the Contractor unless the Contractor had previously manufactured these items and the Government had accepted the deliveries from the Contractor. The Contractor shall not continue with the production quantity until the Government grants the FAAT approval. Form, fit and function shall be conducted during FAAT to ensure total compliance with the drawing requirements and SOW requirements.

The contractor’s risk mitigation plan shall be addressed in the proposal and shall be enforced by the contractor upon early detection of risk occurring and shall be mitigated by the contractor to avoid negative impact on delivery schedules. On time delivery of the Avionics Mechanical Assemblies is an absolute requirement. Late delivery shall not be accepted. Quality assurance processes and methods on completed Avionics Mechanical Assemblies are the sole and full responsibilities of the contractor. The contractor’s Quality Management System must be certified to be in conformance to AS9100D with ISO 9001:2015 as a minimum. Contractor must provide a copy of the Certificate of Registration in order to propose and be considered under this solicitation.

Periodic Task Review Meetings to review status of deliverables, progress, quality assurance checks and inspect shall be conducted by NAWCWD Point Mugu representatives at the Contractor’s Facility on a mutually agreed upon meeting schedule.

3.2 The contractor shall ensure adequate consideration of packaging, handling, storage, and transportation (PHS&T) requirements for all deliverable items in accordance with industry standards.

4. DATA REQUIREMENTS

The Contractor shall provide a Quality Assurance Certification with the delivery of each unit to certify that quality control and inspection have been performed to ensure the proper materials were used and the parts made are in full compliance with the drawing requirements. CDRL A001

5. ***GOVERNMENT TECHNICAL REPRESENTATIVE

Commander, NAWCWD
Code XXXXXXX, Bldg. XXX
Point Mugu, CA. 93042
Attn: XXXXX
Tel #: XXX-XXX-XXXX
Fax #: XXX-XXX-XXXX
Email Address:

6. DELIVERY INSTRUCTION

6.1 ***The First Article Units shall be shipped to the following address for First Article Acceptance Test to be performed by the Government:

Commander, NAWCWD
Code XXXXX, Bldg. XXX
Point Mugu, CA. 93042
Attn: XXXXX

6.2 The deliverable units shall be shipped to the same address listed in paragraph 6.1

*** To be completed at contract award.

C-TXT-ECMRA REQUIRED ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA) INFORMATION (NOV 2017)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [NAMED COMPONENT] via a secure data collection site. Contracted services, excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom - Telecommunications Transmission (D304) and Internet (D322) ONLY.
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address "https://www.ecmra.mil.”
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at "https://www.ecmra.mil.”

Section D - Packaging and Marking

5252.247-9508PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9509PRESERVATION, PACKAGING, PACKING AND MARKING (NAVAIR)(JUL 1998)
(a) Preservation, packaging and packing shall conform to prevailing industry standards for the type of commodity purchased under this contract.
(b) All packages will be clearly marked with applicable contract number/delivery order number, and will contain appropriate packing slip. All deliveries will be marked for and/or consigned as follows:

*To Be Completed At Contract Award

(c) In the event of any discrepancy in material shipped (overage, technical rejection, damage), the contractor shall, immediately upon request of the Contracting Officer, furnish disposition instructions. Normally, such disposition instruction shall be a properly completed Commercial Bill of Lading, which includes, but is not limited to, the mode of shipment, routing, special handling, and so forth.
(d) If the contractor is required to install equipment upon delivery, then the contractor shall inform the Government of the date of shipment from the contractor's facilities and the anticipated date of arrival at the site. This report shall be made no later than the actual date that the shipment is made from the contractor’s facilities. The report may be made by facsimile or e-mail, to the point of contact listed in Section G. All transportation, rigging, drayage, packing, unpacking, and handling necessary to accomplish the installation shall be the responsibility of the contractor.
5252.247-9510PRESERVATION, PACKAGING, PACKING AND MARKING FOR FOREIGN MILITARY SALES (FMS) REQUIREMENTS (NAVAIR)(OCT 2005)
(a) Unless specified elsewhere in the contract, packing and packaging shall comply with MIL-STD-129 and other applicable DoD regulations. Packing and packaging materials shall provide protection from abuse during handling and from environmental, magnetic, and electrical damage during handling and subsequent future storage, possibly under less than desirable conditions.
(b) Marking: All unit and exterior containers/packs shall as a minimum be marked as follows:
(1) FMS Case Number.
(2) Part Number (with CAGE Code).
(3) For - the organization/address the material is shipped to.
(4) The applicable MILSTRIP number (identified separately for each line item of the contract/delivery order)
(5) Project Code number.
(6) Project Directive Line Item (PDLI) Number.
(7) Requisition Serial Number (RSN).
(8) Quantity.
(9) From - the contractor's address shipped from.
(10) Ship to - the shipping address provided in the contract.
(11) Transportation Priority
(12) Required Delivery Date
(c) The contractor shall affix labels to the outside of each external pack warning all handlers that fragile, delicate, etc., equipment is contained within and to warn against particular improper handling and storage procedures/conditions as may be applicable to the item(s) ordered.
5252.247-9514TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
N/A
N/A
N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-16
Responsibility For Supplies
APR 1984
5252.246-9512INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by the High-Speed Anti-Radiation Missle (HARM) Avionics Support Equipment Program, Code 486M00E.
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9514INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
4 mths. ADC
1
COMMANDER, NAWCWD

ANH CHU

CODE 486M00E, BLDG. 356

575 I AVE., SUITE 1

POINT MUGU CA 93042

(805) 989-0040

N68936

0002
POP 11-SEP-2019 TO

10-SEP-2024

N/A
(SAME AS PREVIOUS LOCATION)

N68936

0003
4 mths. ADC
1
(SAME AS PREVIOUS LOCATION)

N68936

0004
POP 11-SEP-2019 TO

10-SEP-2024

N/A
(SAME AS PREVIOUS LOCATION)

N68936

0005
N/A
N/A
N/A
N/A
52.211-17
Delivery of Excess Quantities
SEP 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
52.247-55
F.O.B. Point For Delivery Of Government-Furnished Property
JUN 2003
52.211-8TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY DELIVERY SCHEDULE

0001 1 EA 4 Months After Date of Contract

0002 20 EA 6 Months after issuance of the Delivery Order

0003 1 EA 4 Months After Date of Contract

0004 20 EA 6 Months after issuance of the Delivery Order

0005 1 LO In Accordance with DD1423

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY DELIVERY SCHEDULE

00011 EA
000220 EA
00031 EA
000420 EA
00051 LO

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

5252.247-9505TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.
(1) PCO, Code [insert code].
(2) ACO, Code [insert code].
[insert additional code addresses, as necessary]
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses: [insert the abbreviation and mailing address to match]

*To Be Completed At Contract Award

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF

Pay Official DoDAAC

Issue By DoDAAC
N68936

Admin DoDAAC**

Inspect By DoDAAC
N61326
Ship To Code
N63126
Ship From Code
____
Mark For Code
N63126
Service Approver (DoDAAC)
N68936
Service Acceptor (DoDAAC)
N63126
Accept at Other DoDAAC
____
LPO DoDAAC
____
DCAA Auditor DoDAAC
____
Other DoDAAC(s)
____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

*To Be Completed At Contract Award

5252.201-9500TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)
(a) The Technical Point of Contact (TPOC) for this contract is

Commander, NAWCWD Code 486M00E, Bldg. 356 575 I Ave., Suite 1 Point Mugu, CA. 93042 Attn: Anh Chu, Phone: 805-989-0040

(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).
(c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires.
(d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.
5252.204-9503EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
5252.242-9511CONTRACT ADMINISTRATION DATA (NAVAIR)(NOV 2017)
(a) Contract Administration Office.
(1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order.
(b) Special Instructions (see FAR 42.202(b) and (c)):
(1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)):
Functions Retained
Retained for Performance By:
FAR 42.302(a), (3), (4), (30), (51), (58), (59), (62)
PCO
FAR 42.302(a) (38), (44), (45), (46), (47), (48)
TPOC
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
Additional Functions
Retained for Performance By:
FAR 42.302(b) (1), (3), (4), (5), (6), (9), (10)
See the ADMINISTERED BY Block on the face page of the contract, modification or order.

(c) Inquiries regarding payment should be referred to: MyInvoice through the Wide Area Workflow eBusiness Suite: https://wawf.eb.mil.

G-TXT-0001 PAYMENT INSTRUCTIONS (FEB 2018)

Note: Payment Clause [insert specific clause] applies to this contract.

FOR GOVERNMENT USE ONLY

Contract/Order Payment Clause
Type of Payment Request
Supply
Service
Construction
Payment Office

Allocation Method

52.212-4 (Alt I), Contract Terms and Conditions—Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts

Cost Voucher
X
X
N/A
Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-1, Payments
Navy Shipbuilding Invoice (Fixed Price)
X
N/A
N/A
Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under Fixed-Price Research and Development Contracts;

52.232-3, Payments under Personal Services Contracts;

52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers

Invoice
X
X
N/A
Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.
52.232-5, Payments Under Fixed-Price Construction Contracts
Construction Payment Invoice
N/A
N/A
X
Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Payments
Progress Payment*
X
X
N/A
Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.

52.232-29, Terms for Financing of Purchases of Commercial Items;

52.232-30, Installment Payments for Commercial Items

Commercial Item Financing*
X
X
N/A
Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
52.232-32, Performance-Based Payments
Performance-Based Payments*
X
X
N/A
Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign Military Sales Acquisitions
Progress Payment*
X
X
N/A
Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

Section H - Special Contract Requirements

5252.211- 9510CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011)
(a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall:
(1) Not by word or deed give the impression or appearance of being a Government employee;
(2) Wear appropriate badges visible above the waist that identify them as contractor employees when in Government spaces, at a Government-sponsored event, or an event outside normal work spaces in support of the contract/order;
(3) Clearly identify themselves as contractor employees in telephone conversations and in all formal and informal written and electronic correspondence. Identification shall include the name of the company for whom they work;
(4) Identify themselves by name, their company name, if they are a subcontractor the name of the prime contractor their company is supporting, as well as the Government office they are supporting when participating in meetings, conferences, and other interactions in which all parties are not in daily contact with the individual contractor employee; and
(5) Be able to provide, when asked, the full number of the contract/order under which they are performing, and the name of the Contracting Officer’s Representative.
(b) If wearing a badge is a risk to safety and/or security, then an alternative means of identification maybe utilized if endorsed by the Contracting Officer’s Representative and approved by the Contracting Officer.
(c) The Contracting Officer will make final determination of compliance with regulations with regard to proper identification of contractor employees.
5252.216-9512PAPERLESS CONTRACTING (NAVAIR)(JUN 2009)
(a) Orders and requests for proposals are hereby authorized to be issued by facsimile or by electronic commerce (including e-mail and paperless methods of delivery). Nothing in this contract should be read to prohibit these types of orders. In the event of a conflict with any other provision of this contract, this clause shall govern.
(b) To the extent the terms "written", "mailed", or "physically delivered" appear in other provisions of this contract, these terms are hereby defined to explicitly include electronic commerce, email, or paperless delivery methods.
5252.225-9506VERIFICATION OF "SHIP TO" AND/OR "NOTICE OF AVAILABILITY" ADDRESS (NAVAIR) (JAN 1992)
The contractor shall submit a request in duplicate to the Transportation Office of the cognizant Contract Administration Office for verification of the "Ship to" address. If the offer/release instructions require a "Notice of Availability" the contractor shall also request verification of the address to which notification will be made (the 'IAC 3' address). Such requests shall be submitted at least ten (10) days in advance of (i) date Notice of Availability is to be submitted, or (ii) actual shipping date, if shipment is to be released automatically.

Section I - Contract Clauses

52.202-1
Definitions
NOV 2013
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
MAY 2014
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-17
Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-2
Security Requirements
AUG 1996
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7
System for Award Management
OCT 2018
52.204-13
System for Award Management Maintenance
OCT 2018
52.204-19
Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-21
Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.204-23
Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-5
Material Requirements
AUG 2000
52.211-16
Variation In Quantity
APR 1984
52.211-17
Delivery of Excess Quantities
SEP 1989
52.215-1
Instructions to Offerors--Competitive Acquisition
JAN 2017
52.215-2
Audit and Records--Negotiation
OCT 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-11
Price Reduction for Defective Certified Cost or Pricing Data--Modifications
AUG 2011
52.215-14
Integrity of Unit Prices
OCT 2010
52.215-21 Alt IV
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) - Alternate IV
OCT 2010
52.219-4 (Dev)
Notice of Price Evaluation Preference for HUBZone Small Business Concerns (DEVIATION 2019-O0003).
DEC 2018
52.219-6 (Dev)
Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003).
DEC 2018
52.219-8
Utilization of Small Business Concerns
OCT 2018
52.222-3
Convict Labor
JUN 2003
52.222-19
Child Labor -- Cooperation with Authorities and Remedies
JAN 2018
52.222-20
Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
MAY 2014
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-35
Equal Opportunity for Veterans
OCT 2015
52.222-36
Equal Opportunity for Workers with Disabilities
JUL 2014
52.222-37
Employment Reports on Veterans
FEB 2016
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
JAN 2019
52.222-54
Employment Eligibility Verification
OCT 2015
52.223-6
Drug-Free Workplace
MAY 2001
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.223-20
Aerosols
JUN 2016
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.229-3
Federal, State And Local Taxes
FEB 2013
52.232-1
Payments
APR 1984
52.232-8
Discounts For Prompt Payment
FEB 2002
52.232-9
Limitation On Withholding Of Payments
APR 1984
52.232-11
Extras
APR 1984
52.232-13
Notice Of Progress Payments
APR 1984
52.232-16
Progress Payments
APR 2012
52.232-17
Interest
MAY 2014
52.232-23
Assignment Of Claims
MAY 2014
52.232-25
Prompt Payment
JAN 2017
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
OCT 2018
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-1
Disputes
MAY 2014
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.242-5
Payments to Small Business Subcontractors
JAN 2017
52.242-13
Bankruptcy
JUL 1995
52.242-15
Stop-Work Order
AUG 1989
52.243-1
Changes--Fixed Price
AUG 1987
52.244-5
Competition In Subcontracting
DEC 1996
52.244-6
Subcontracts for Commercial Items
JAN 2019
52.245-1
Government Property
JAN 2017
52.245-9
Use And Charges
APR 2012
52.246-15
Certificate of Conformance
APR 1984
52.246-23
Limitation Of Liability
FEB 1997
52.248-1
Value Engineering
OCT 2010
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
APR 2012
52.249-8
Default (Fixed-Price Supply & Service)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.204-7000
Disclosure Of Information
OCT 2016
252.204-7002
Payment For Subline Items Not Separately Priced
DEC 1991
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7006
Billing Instructions
OCT 2005
252.204-7008
Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.211-7001
Availability of Specifications, Standards, and Data Item Descriptions Not Listed in the Acquisition Streamlining and Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents
MAY 2006
252.211-7002
Availability For Examination Of Specifications, Standards, Plans, Drawings, Data Item Descriptions, And Other Pertinent Documents
DEC 1991
252.211-7003
Item Unique Identification and Valuation
MAR 2016
252.211-7007
Reporting of Government-Furnished Property
AUG 2012
252.211-7008
Use of Government-Assigned Serial Numbers
SEP 2010
252.225-7001
Buy American And Balance Of Payments Program-- Basic
DEC 2017
252.225-7002
Qualifying Country Sources As Subcontractors
DEC 2017
252.225-7012
Preference For Certain Domestic Commodities
DEC 2017
252.225-7027
Restrictions on Contingent Fees for Foreign Military Sales
APR 2003
252.225-7048
Export-Controlled Items
JUN 2013
252.226-7001
Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.227-7013
Rights in Technical Data--Noncommercial Items
FEB 2014
252.227-7016
Rights in Bid or Proposal Information
JAN 2011
252.227-7025
Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends
MAY 2013
252.227-7026
Deferred Delivery Of Technical Data Or Computer Software
APR 1988
252.227-7030
Technical Data--Withholding Of Payment
MAR 2000
252.227-7037
Validation of Restrictive Markings on Technical Data
SEP 2016
252.232-7002
Progress Payments For Foreign Military Sales Acquisitions
DEC 1991
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010
Levies on Contract Payments
DEC 2006
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
DEC 2012
252.244-7000
Subcontracts for Commercial Items
JUN 2013
252.244-7001
Contractor Purchasing System Administration
MAY 2014
252.245-7001
Tagging, Labeling, and Marking of Government-Furnished Property
APR 2012
252.245-7002
Reporting Loss of Government Property
DEC 2017
252.245-7003
Contractor Property Management System Administration
APR 2012
252.245-7004
Reporting, Reutilization, and Disposal
DEC 2017
252.246-7005
Notice of Warranty Tracking of Serialized Items
MAR 2016
252.246-7006
Warranty Tracking of Serialized Items
MAR 2016
252.246-7007
Contractor Counterfeit Electronic Part Detection and Avoidance System
AUG 2016
252.246-7008
Sources of Electronic Parts
MAY 2018
252.247-7023
Transportation of Supplies by Sea
FEB 2019
52.209-4FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(a) The Contractor shall deliver 1 unit each of Items 0001 and 0003 within 4 months from the date of this contract to the Government at NAWCWD, Point Mugu, CA for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.