Attachment_L-1_Cost_Summary_Spreadsheet.xls
XLS spreadsheet 63 KB Posted
- Attached to
- Electronic Warfare Integrated Laboratory
- Solicitation number
- N6893618R0015
About this file
Attachment L-1 Cost Summary Spreadsheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated_L-2.xls | XLS spreadsheet | |
| 18R0015__Amended_Solicitation_2.doc | DOC document | |
| 18R0015_Solicitation_Amendment.docx | DOCX document | |
| Attachment_L-2_Annual_Fully_Burdened_Labor.xls | XLS spreadsheet | |
| Exhibit_A_-_CDRLs.pdf | ||
| Attachment_L-3_Past_Performance_Information_Form.pdf | ||
| 18R0015_Solicitation.doc | DOC document | |
| Attachment_L-2_Annual_Fully_Burdened_Labor.xls | XLS spreadsheet | |
| Attachment_L-4_CPAQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for Prime Contractor: | |
| 1 | Enter Prime offeror name into cell A3. |
| 2 | Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. |
| 3 | Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor) |
| 4 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 5 | All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| 6 | All dollar figures shall be carried out no further than two decimal places. |
| 7 | In column D, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces. |
| 8 | Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly. |
| 9 | For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance. |
| 10 | Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas. |
| 11 | The prime should insert the subcontractor handling charge, if any. |
| 12 | The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor. |
| 13 | The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 14 | Under Other Direct Costs, the prime contractor should separate by Travel and Material as applicable. |
| 15 | Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions. |
| 16 | On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet |
| 17 | When submitting this file, the instructions may be deleted. |
| 1 | |
| Instructions for Subcontractors: | |
| 1 | Enter Prime offeror name into cell A3. |
| 2 | Replace Prime Contractor with Subcontractor in A7, A8, A51 (Prime Contractor Indirect Cost), and A58 (Total Prime Contractor Labor Cost). |
| 3 | Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. |
| 4 | Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor) |
| 5 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 6 | All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. |
| 7 | All dollar figures shall be carried out no further than two decimal places. |
| 8 | In column D, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces. |
| 9 | Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly. |
| 10 | For subcontractor cost summary sheets, delete Rows 50-86. |
| 11 | When submitting this file, the instructions may be deleted. |
| 26 | |
| 86 | |
| 2 |
&LSection L, Attachment L-4 &RN68936-16-R-0030
Cost Summary Spreadsheet
| COST SUMMARY SPREADSHEET | |||||||||||||||||||||||
| Prime Offeror Name: | |||||||||||||||||||||||
| Subcontractor Name (if applicable): | |||||||||||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Extra | Total for All Periods | |||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | Site | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||||||
| General and Operations Manager | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||
| Acquisition Specialist/Management Analyst | |||||||||||||||||||||||
| Information Management and Technology Analyst | |||||||||||||||||||||||
| System Administrator | |||||||||||||||||||||||
| Business Systems Analyst | |||||||||||||||||||||||
| Computer Scientist | |||||||||||||||||||||||
| Help Desk Support Specialist | |||||||||||||||||||||||
| Systems Specialist | |||||||||||||||||||||||
| Informational Management and Technology Analyst | |||||||||||||||||||||||
| Computer Scientist | |||||||||||||||||||||||
| Test Engineer | |||||||||||||||||||||||
| Systems Specialist | |||||||||||||||||||||||
| Financial Manager | |||||||||||||||||||||||
| Data Management Specialist | |||||||||||||||||||||||
| Drafter/CAD Operator | |||||||||||||||||||||||
| Administrative Assistant | |||||||||||||||||||||||
| Total Direct Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||||||
| Overhead | |||||||||||||||||||||||
| Fringe Benefits | |||||||||||||||||||||||
| G&A | |||||||||||||||||||||||
| Total Indirect Labor Cost | |||||||||||||||||||||||
| Total Direct and Indirect Labor cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| COM | |||||||||||||||||||||||
| Total Prime Contractor Labor Cost | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| Subcontractor Labor Cost | |||||||||||||||||||||||
| Subcontractor proposed cost and fee | |||||||||||||||||||||||
| Acquisition Specialist/Management Analyst | |||||||||||||||||||||||
| Information Management and Technology Analyst | |||||||||||||||||||||||
| Etc. | |||||||||||||||||||||||
| Total proposed subcontractor labor cost and fee | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||
| Prime contractor pass through (not including fee) | |||||||||||||||||||||||
| Handling | |||||||||||||||||||||||
| G&A | |||||||||||||||||||||||
| Other (if any) | |||||||||||||||||||||||
| Total pass through (not including fee) | |||||||||||||||||||||||
| Total Subcontractor Cost including pass through | 0 | ||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | |||||||||||||||||||||||
| Fixed Fee | |||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | |||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | |||||||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | |||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | 0 | ||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||
| Travel | |||||||||||||||||||||||
| Material | |||||||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | |||||||||||||||||||||||
| Total ODCs | |||||||||||||||||||||||
| Total CPFF all CLINs (Labor and ODCs) | 0 | ||||||||||||||||||||||
| Grand Total of CPFF all CLINs | |||||||||||||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | |||||||||||||||||||||
| Subcontractor proposed cost and fee | $0 | ||||||||||||||||||||||
| Pass Through Amount (not including fee) | $0 | ||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | $0 | ||||||||||||||||||||||
| Total Pass Through Amount (including fee) | $0 | 0% | |||||||||||||||||||||
| Maximum Pass Through Allowed by SeaPort-e IDIQ Contract | 8% | ||||||||||||||||||||||
| Fee Analysis - Total for All Years | Amount | Percent | |||||||||||||||||||||
| Prime Contractor Labor Cost | $0 | ||||||||||||||||||||||
| Fixed Fee for Labor Performed by Prime Contractor | $0 | 0% | |||||||||||||||||||||
| Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract | |||||||||||||||||||||||
| * When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B. |
&LSection L, Attachment L-1 &CCost Summary Spreadsheet Breakout &RN68936-18-R-0015 &LKTR: (name)&C3 &RSource Selection Information - See: FAR 2.101 and 3.104
Summary
| CLIN Summary Sheet | |||||
| CLINS | CLIN Description | Total Hours | Total Cost | Total Fixed Fee | Total Value $ |
| 0001 | |||||
| 0002 | |||||
| 0003 | |||||
| X005 | |||||
| Total |
&LSection L, Attachment L-4 &CSummary Tab&RN68936-16-R-0030 &C4
File details come from the government source that posted it.