Attachment_L-1_Cost_Summary_Spreadsheet.xls

XLS spreadsheet 63 KB Posted

Attached to
Electronic Warfare Integrated Laboratory
Solicitation number
N6893618R0015
Issued by

About this file

Attachment L-1 Cost Summary Spreadsheet

View the file

Other files

File Type Posted
Updated_L-2.xls XLS spreadsheet
18R0015__Amended_Solicitation_2.doc DOC document
18R0015_Solicitation_Amendment.docx DOCX document
Attachment_L-2_Annual_Fully_Burdened_Labor.xls XLS spreadsheet
Exhibit_A_-_CDRLs.pdf PDF
Attachment_L-3_Past_Performance_Information_Form.pdf PDF
18R0015_Solicitation.doc DOC document
Attachment_L-2_Annual_Fully_Burdened_Labor.xls XLS spreadsheet
Attachment_L-4_CPAQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories.
3Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
4The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
5All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
6All dollar figures shall be carried out no further than two decimal places.
7In column D, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
8Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
9For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
10Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
11The prime should insert the subcontractor handling charge, if any.
12The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
13The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
14Under Other Direct Costs, the prime contractor should separate by Travel and Material as applicable.
15Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
16On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
17When submitting this file, the instructions may be deleted.
1
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
2Replace Prime Contractor with Subcontractor in A7, A8, A51 (Prime Contractor Indirect Cost), and A58 (Total Prime Contractor Labor Cost).
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
9Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
10For subcontractor cost summary sheets, delete Rows 50-86.
11When submitting this file, the instructions may be deleted.
26
86
2

&LSection L, Attachment L-4 &RN68936-16-R-0030

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 5ExtraTotal for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategorySiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
General and Operations Manager00000000
Acquisition Specialist/Management Analyst
Information Management and Technology Analyst
System Administrator
Business Systems Analyst
Computer Scientist
Help Desk Support Specialist
Systems Specialist
Informational Management and Technology Analyst
Computer Scientist
Test Engineer
Systems Specialist
Financial Manager
Data Management Specialist
Drafter/CAD Operator
Administrative Assistant
Total Direct Labor Cost00000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost0000000
COM
Total Prime Contractor Labor Cost0000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Acquisition Specialist/Management Analyst
Information Management and Technology Analyst
Etc.
Total proposed subcontractor labor cost and fee0000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)0
Other Direct Costs
Travel
Material
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs
Total CPFF all CLINs (Labor and ODCs)0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Maximum Pass Through Allowed by SeaPort-e IDIQ Contract8%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%
Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

&LSection L, Attachment L-1 &CCost Summary Spreadsheet Breakout &RN68936-18-R-0015 &LKTR: (name)&C3 &RSource Selection Information - See: FAR 2.101 and 3.104

Summary

CLIN Summary Sheet
CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
0001
0002
0003
X005
Total

&LSection L, Attachment L-4 &CSummary Tab&RN68936-16-R-0030 &C4

File details come from the government source that posted it.