L-1_Cost_Spreadsheet.xls

XLS spreadsheet 74 KB Posted

Attached to
Fleet Weapons Support (FWST) Federal contract opportunity
Solicitation number
N6893617R0011
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

L-1 Cost Spreadsheet

View the file

Other files for this federal contract opportunity

Other files attached to Fleet Weapons Support (FWST), newest first.
File Type Posted
17-R-0011_Solicitation_5.doc DOC document
L-2_Past_Performance_Information_Form_2.pdf PDF
L-1_Cost_Spreadsheet_2.xls XLS spreadsheet
Q&A_Document.doc DOC document
N68936-17-R-0011,_Amendement_01,_Conformed_Copy.pdf PDF
L-3_Contractor_Performance_Assesment_Questionnaire_.doc DOC document
L-2_Past_Performance_Information_Form.pdf PDF
17-R-0011_Solicitation.doc DOC document
L-1_Cost_Spreadsheet.xls XLS spreadsheet
Exhibit_1-_CDRLs.pdf PDF
L-3_Contractor_Performance_Assesment_Questionnaire_.doc DOC document
L-2_Past_Performance_Information_Form.pdf PDF
Exhibit_1-_CDRLs.pdf PDF
17-R-0011_Solicitation_2.doc DOC document
17-R-0011_Solicitation_-_Draft.docx DOCX document
Contractor_Performance_Assessment_Questionaire.docx DOCX document
Past_Performance_Information_Form.pdf PDF
Cost_Spreadsheet.xls XLS spreadsheet
L-4_Fully_Burdened_Labor.xls XLS spreadsheet
CDRL.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor
1Enter Prime offeror name into Cell A3.
2Enter all Prime employee names in Column A (starting at Row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all Prime labor categories in Column C (starting at Row 9) If necessary, insert additional rows--but ensure integrity of formulas. In Column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the Government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In Column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In Column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For each subcontractor, enter the Subcontractor name, total hours, and total amount for each period of performance.
12Please note if more Subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The Prime should insert the Subcontractor handling charge, if any.
14The Prime should insert the fixed fee rate applied to its cost excluding Subcontractor labor.
15The Prime should insert the fixed fee rate it is applying to the Subcontractor labor, if any.
16Under Other Direct Costs, the Prime contractor should separate by Travel and Material.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into Cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A31, A38, etc.
2Enter all Subcontractor employee names in Column A (starting at Row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all Subcontractor labor categories in Column C (starting at Row 9) If necessary, insert additional rows--but ensure integrity of formulas. In Column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the Government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In Column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In Column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For Subcontractor cost summary sheets, delete Rows 40-59.
12When submitting this file, the instructions may be deleted.

&LSection L, Attachment L-6&CCost Summary Spreadsheet&RSolicitation N68936-16-R-0031

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEETSection L, Attachment L-1
Prime Offeror Name:Cost Summary Spreadsheet
Subcontractor Name (if applicable):Solicitation N68936-17-R-0011
Year 1Year 2Year 3Year 4Year 5+ 6 mo. Extension OptionOption Period 5Total for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1Program Manager9180918091809180918004,59002,295
Administrative Assistant9759759759759754,8750
Equipment Specialist24,96024,96024,96024,96024,960124,8000
Equipment Specialist (Japan)5,7605,7605,7605,7605,76028,8000
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
- 00
Total Direct Labor Cost000000163,0650
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost0000000
COM
Total Prime Contractor Labor Cost0000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Total proposed subcontractor labor cost and fee0000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)0
Other Direct Costs
Other Direct Costs (ODCs) - Travel92,964
Other Direct Costs (ODCs) - Material717,168
Total ODCs810,132
Total CPFF all CLINs (Labor and ODCs)0
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%
*Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

Summary

CLIN Summary Sheet
CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
0001CPFF Labor
0002Other Direct Costs (ODCs) - Travel and Material
0003DataNSPNSPNSPNSP
Total

&LSection L, Attachment L-6&CCost Summary Spreadsheet&RSolicitation N68936-16-R-0031

File details come from the government source that posted it.