N6883625Q0052 A0003.pdf
PDF 819 KB Posted
- Attached to
- Administrative and Logistical Support Services Federal contract opportunity
- Solicitation number
- N6883625Q0053
About this file
This document is an Amendment to a Solicitation for Administrative and Logistical Support Services (Solicitation Number N6883625Q0053), issued by the Naval Supply Systems Command. The amendment, numbered 0003, changes the response date from 09-May-2025 10:00 AM to 12-May-2025 10:00 AM and provides the government's responses to 45 contractor questions. Key details include the requirement for services at multiple locations including Naval Construction Training Center Gulfport, MS, and learning sites at Fort Leonard Wood, MO and Sheppard Air Force Base, TX, with an estimated 11 labor categories ranging from Student Liaison to Facilities Maintenance Support.
The solicitation is a 100% set-aside for 8(a) participants under NAICS Code 561210, with Gemini Tech Services LLC as the incumbent contractor. The contract requires Secret clearance for certain positions, adherence to a Collective Bargaining Agreement, and involves supporting Seabee training through administrative, technical, and maintenance services. The government has estimated approximately 1,992 annual hours for most positions, with Light/Heavy Equipment Support requiring 5,976 hours. The amendment clarifies various requirements including security clearance timing, certification deadlines, telework restrictions, and travel funding limits, with travel not to exceed $15,000 annually for most contract line items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6883625Q0053 A0002.pdf | ||
| N6883625Q0053 A0001.pdf | ||
| Attachment 3 CBA.pdf | ||
| N6883625Q0053.pdf | ||
| Attachment 2 - WDs.pdf | ||
| Attachment 1 - PPQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is:
1.To provide the Governments response to questions recieved as a result of Amendment 0001. No additional questions w ill be accepted.
2. The required response date/time has changed from 09-May-2025 10:00 AM to 12-May-2025 10:00 AM.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-May-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6883625Q0053
X 9B. DATED (SEE ITEM 11)
22-Apr-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-May-2025
CODE
NAVSUP FLC JACKSONVILLE CONTRACTS DIV
ROBERT EDWARDS
110 YORKTOWN AVE, 3RD FLOOR
JACKSONVILLE FL 32212-0097
N68836 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6883625Q0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
A00001 QUESTIONS
Questions previously answered, if changed have been highlighted YELLOW. Questions received in response to Amendment 0001 are listed in RED.
NOTE: Some Questions have been re-numbered.
Question 1. Would it be possible for you to provide a copy of the CBA referenced on p. 76 of the solicitation?
Response: The Collective Bargaining Agreement (CBA) has been added as an attachment.
Question 2. Would you provide the contract number and value for the current contract?
Response: Purchase Order N6883623P0156
Question 3. Will the Government please confirm that bidders must use the CBA payrates and benefits requirements for those labor categories covered by the CBA?
Response: Quoters are responsible for reading the solicitation in its entirety, including all attachments. The requirements related to CBA-covered labor categories, including applicable pay rates and benefits, are addressed within the solicitation and its attachments. It is the Quoter’s responsibility to ensure compliance with all applicable provisions.
Question 4. Since there are current incumbent staff who have worked on this project for a number of years and accrue Paid Time Off in excess of 2 weeks (80 hours) per year, can the government please provide to all bidders the current incumbent staff hire dates (no names or positions, just their hire dates) so all bidders can accurately price the correct PTO accrual rates?
Response: On January 20, 2025, President Trump issued Executive Order 14148, which revoked EO 14055. As a result, federal contractors are no longer required to offer employment to predecessor contract employees under the nondisplacement provisions previously mandated by EO 14055
The Government is not providing incumbent staff hire dates.
Question 5: Please provide the hire dates of incumbent staff to ensure all offerors have the information needed to accurately price their solutions.
Response: See the Governments response to question 4.
Question 6. Is there a security requirement (s) for this project? If so, can the government advise what labor categories are required to hold a clearance and at what level?
Response: Yes, a Secret clearance is required for this project. The labor categories requiring clearance are identified in the Performance Work Statement (PWS). It is the Quoter’s responsibility to read the solicitation and all associated attachments in their entirety to ensure a complete understanding of all requirements, including security clearance obligations.
Question 7. If there is a security requirement for this project, will the government be issuing a DD254 for the project that lists those positions (labor categories) that must hold the requisite security clearance?
Response: A DD Form 254 will be issued. In Accordance With (IAW) FAR 4.402 (d)(1) Provided that the data submittal is unclassified, the DD Form 254 shall be completed electronically in the NISP Contract Classification System (NCCS), which is accessible at https://www.dcsa.mil/is/nccs/
Additional NCCS information can be found at: https://www.dcsa.mil/Systems-Applications/National-Industrial- Security-Program-NISP-Contract-Classification-System-NCCS/
Question 8. Mail room operations is often considered a critical task area that must be filled 100% of the time. Should the contractor mail operations clerk miss time due to Sick Leave, Paid Time Off or Military Reserve duty will the government provide staff to man the mail room during that absence or is the contractor 100% responsible to man the mail room for all hours required in the contract?
Response: The contractor is responsible for ensuring full coverage of all hours required in the contract to include when the clerk is on leave or reserve time.
Question 9. Will the Government provide details on the current staffing structure for this contract, including the labor categories and number of FTEs assigned at each performance location?
Response: the Government has estimated the following for informational purposes only:
Position Location Hours (per year)
2.1 (A) School Student Liaison NCTC Gulfport 1992
2.2 Mail Room Operations Support NCTC Gulfport 1992
2.3 Command Pass Coordinator Support Det. Sheppard 1992
2.4 Safety and Occupational Health Support NCTC Gulfport 1992
2.5 IT Support NCTC Gulfport 1992
2.6 Student Liaison Support Det. Fort Leonard Wood 1992
2.7 Light/Heavy Equipment Support NCTC Gulfport 5976
2.8 Administrative/Executive Command Support NCTC Gulfport 1992
2.9 Facilities Maintenance Support NCTC Gulfport 1992
2.10 Student Registrar/Command Personnel/Pay Administrator NCTC Gulfport 1992
2.11 CETARS Administrator/Training Technician NCTC Gulfport 1992
Question 10. We just started tracking the Administrative and Logistical Support Services (N6883625Q0053) opportunity and would like to know if there is a CBA involved on this mission and if it can be provided to offerors?
Response: The Collective Bargaining Agreement (CBA) has been added as an attachment.
Question 11: Will the government provide the previous/incumbent Performance Work Statement since it is not publicly available?
Response: No, the requested document is not being provided separately, as the applicable Performance Work Statement (PWS) is available and included as part of the current solicitation package.
Question 12: Will the government provide the historical level of effort, to include labor categories and Full Time Equivalents (FTEs)?
Response: the Government has estimated the following for informational purposes only:
Position Location Hours (per year)
2.1 (A) School Student Liaison NCTC Gulfport 1992
2.2 Mail Room Operations Support NCTC Gulfport 1992
2.3 Command Pass Coordinator Support Det. Sheppard 1992
2.4 Safety and Occupational Health Support NCTC Gulfport 1992
2.5 IT Support NCTC Gulfport 1992
2.6 Student Liaison Support Det. Fort Leonard Wood 1992
2.7 Light/Heavy Equipment Support NCTC Gulfport 5976
2.8 Administrative/Executive Command Support NCTC Gulfport 1992
2.9 Facilities Maintenance Support NCTC Gulfport 1992
Question 13: Will the government confirm if the Performance Work Statement requirements in the solicitation is identical to the Performance Work Statement in the previous/incumbent contract? If there are deviations between the two Performance Work Statements, can the government please identify those deviations?
Response: No. The government will not confirm whether the Performance Work Statement (PWS) in the current solicitation is identical to the PWS from the previous/incumbent contract. Offerors are advised to rely solely on the PWS provided in the current solicitation when preparing their proposals.
Question 14: Reference RFQ page 47, Paragraph Volume III Past Performance. The Past Performance has a 15-page limit but doesn’t have requirements for a past performance narrative. Is the 15-page limit for the
CPARS?
Response: The 15-page limit applies to all documents submitted as part of the Past Performance volume, including CPARS and any additional past performance narratives or supporting documentation.
Question 15: Reference RFQ page 47, Paragraph Volume III Past Performance. The Past Performance has a 15-page limit but doesn’t have requirements for a past performance narrative. Is the intent for the government to determine relevancy based on the CPARS?
Response: The Government's basis for evaluation of past performance, including the determination of relevancy, is outlined beginning on page 49 of the RFQ. The Government may use any available data to assist in its evaluation to include but not limited to CPARS assessments and submitted PPQs.
Question 16: Please consider this an official request that this solicitation be set-aside for Competitive 8(a) businesses.
Response: The acquisition approach is a competitive Firm-Fixed-Price contract, solicited as a 100% set aside for 8(a) participants under NAICS Code 561210.
Question 17: Document: N/A Pg Number: N/A | Paragraph Number: N/A | Question: Since the SCA is applied to this contract can you please provide the seniority dates for all incumbent personnel, to include the applicable WD/location as this would be needed for regulatory compliance and pricing purposes.
Response: The Government is not providing incumbent staff hire dates during this phase of the contracting process.
Locations are provided on the table below.
Position Location Hours (per year)
2.1 (A) School Student Liaison NCTC Gulfport 1992
2.2 Mail Room Operations Support NCTC Gulfport 1992
2.3 Command Pass Coordinator Support Det. Sheppard 1992
2.4 Safety and Occupational Health Support NCTC Gulfport 1992
2.5 IT Support NCTC Gulfport 1992
2.6 Student Liaison Support Det. Fort Leonard Wood 1992
2.7 Light/Heavy Equipment Support NCTC Gulfport 5976
2.8 Administrative/Executive Command Support NCTC Gulfport 1992
2.9 Facilities Maintenance Support NCTC Gulfport 1992
Question 18: Document: Solicitation | Pg Number: 46 | Paragraph: 2 (b) submission of quoters) : It states each volume should contain a cover sheet #1 and #3, does Volume 2 Technical Volume and Volume 4 Contractor Responsibility not need a cover sheet as well or not?
Response: As referenced in the above question, numbers 1 and 3 pertain to the below (information to be included on the coversheet):
Submission of Quotes. Quoters shall submit quotes in PDF format by volume as described below. Each volume shall contain a cover sheet with #1 and #3 below.
The quote shall contain the following information:
1. Solicitation number as indicated on page one (1) of the SF1449, Block 5 and the Title of the procurement.
2. Time specified for receipt of quotes: Quoters shall ensure that quotes are received by the Government point of contact no later than the date and time indicated on page one (1) of the SF1449, Block 8.
3. Name, title, e-mail address, and telephone number of the individual(s) with authority to bind the company.
Quoter’s POC information for contractual questions/discussions. CAGE Code, Unique Entity ID (UEI), and Business Size.
4. Technical Description: See volumes below.
5. Terms of any express warranty: Not modified.
6. Provide Price and any discount terms as described in Price Volume.
7. “Remit to” address: The Quoter shall submit all volumes of its quote electronically via the Government Point of Entry via email to Mr. Vincent Jones vincent.b.jones.civ@us.navy.mil and Mr. Robert Edwards at robert.s.edwards42.civ@us.navy.mil.
8. Representations and certifications: See Contractor Responsibility Volume.
9. Acknowledgment solicitation amendments: All amendments issued with signatures to acknowledge terms and conditions of amendments. Acknowledgement of all amendments issued to the solicitation shall be signed, dated, and returned.
10. Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information).
11. Quoters that fail to furnish required representations or information or reject the terms and conditions of the solicitation shall be excluded from consideration
Question 19: 8(a) teaming eligibility. Must every firm on the team—including all subcontractors and any joint-venture members—hold a current 8(a) certification, or is it sufficient that the prime contractor be 8(a) while allowing large-business or non-8(a) small-business subs?
Response: Pursuant to FAR Subpart 19.3, A joint venture can qualify as a small business if it meets the rules in 13 CFR 121.103(h) and 13 CFR 125.8. This generally means:
Either all members of the joint venture must be small businesses under the size standard in the solicitation, Or if it’s a mentor-protégé joint venture approved by the SBA, the protégé must be small under the size standard.
All Quoters must officially state their size and socioeconomic status in writing when they submit their initial quote.
A copy of the SBA approved Joint Venture and/or mentor protégé agreement must accompany your quote.
Question 20: Period of performance start date. The solicitation is silent on an exact start date; the pricing schedule implies 12-month CLINs but gives no transition window. What is the target award date and required contract start (Phase-In) date? Will the Government allow a transition period before full performance begins?
Response: Refer to the “DELIVERY INFORMATION” section of the RFQ beginning on page 39.
Question 21: Security-clearance timing. PWS 13 states Secret clearances are required, while 19 notes NACI/T1 packages must be submitted 30 days prior to start. Will the Government allow interim Secret or favorable fingerprint checks at day one, with final Secret adjudication to follow, or must all personnel hold fully adjudicated Secret clearances before reporting?
Response: Yes, personnel may begin work with an interim Secret clearance or a favorable fingerprint check on day one. Final Secret clearance adjudication may follow.
Question 22: Backup Mail Clerk coverage. 2.2 requires a qualified back-up Mail Clerk if the primary is absent for more than two days. Does the Government expect a second full-time FTE included in pricing, or is occasional surge coverage (e.g., on-call or cross-trained staff) acceptable?
Response: The contractor is responsible for ensuring full coverage of all hours required in the contract to include when the clerk is on leave or reserve time.
Question 23: Telework permissions & equipment. Several tasks are labeled “ADHOC/Situational telework capable with agency approval” (e.g., 2.4, 2.5, 2.7, 2.9). Should offerors assume these billets are 100 % on-site for pricing purposes unless base closure occurs, or may we propose routine remote work? Will the Government furnish GFE laptops/VMs for teleworkers, or should that cost be in the offeror’s price?
Response: Telework is not authorized. The PWS has been updated.
Question 24: Travel CLIN ceiling. CLINs 0004/1004/2004/3004/4004 set a $15 K NTE per year; CLIN 5004 sets $7.5 K. a. Will unused funds in one fiscal year be rolled into the next option year, or does each ceiling stand alone? b. Is airfare/prorated per diem subject to JTR “actuals” reimbursement, or is the contractor expected to budget/absorb overruns within the fixed NTE amount?
Response: Travel funding is Not to Exceed $15,000.00 for 0004 to 4004. 5004, if exercised and pursuant to FAR Clause 52.217-8, will be for no more than six months, and shall not exceed $7,500.00. Per PWS 9.0, all travel required during the performance of this requirement shall be approved in advance by the Contracting Officer Representative and shall adhere to the Federal Travel Regulations (for travel in 48 contiguous states), the Joint Travel Regulations, Volume 2, DOD Civilian Personnel, Appendix A (for travel to Alaska, Hawaii, Puerto Rico, and U.S. Territories and possessions).
The Contractor shall notify the Contracting Officer and Contracting Officer Representative when travel funds expended reach 80% of the funded amount
Question 25: Equivalent Federal Rates table. The “Statement of Equivalent Rates for Federal Hires” lists GS- 11 for multiple positions (Facilities, Admin, etc.) but omits others (e.g., Safety Specialist, Mechanic, Mailroom). Should we infer the unlisted positions default to SCLS WD only, or will an updated table be issued?
Response: The RFQ has been updated.
Question 26: OSHA/CPR instructor certification deadline. 2.4 requires the SOH Specialist to “be certified within three months of contract award.” If the incumbent already holds current credentials, may we count that toward the requirement, or will the three-month clock restart at award?
Response: The three-month qualification period applies only to personnel who do not already hold the required certification. If the incumbent already possesses current credentials, they will not need to requalify at award. They must simply maintain the certification in accordance with its renewal requirements.
Question 27: IT Assistant certification timeline. 2.5 allows six months after hire to obtain CompTIA Security+ CE. Will the Government accept a candidate whose current Security+ is due for renewal within the performance year, provided CEUs are maintained, or must certification remain valid for the entire base year at proposal time?
Response: Yes, the Government will accept a candidate whose CompTIA Security+ certification is valid but due for renewal during the base period, as long as the required Continuing Education Units (CEUs) are maintained to ensure the certification remains active.
Question 28: CETARS access approval. 2.11 tasks the Training Technician with site-admin privileges across four learning sites. What is the expected lead time for the Navy to approve new CETARS accounts and elevated roles so we can plan for transition overlap?
Response: New personnel must first obtain NMCI access before gaining access to CeTARS. Typically, 10 working days is sufficient to complete the approval process for new CeTARS accounts and elevated roles.
Question 29: Inventory ownership of special tools & parts. 2.7 states that parts are “ordered, picked up, and stored” by the contractor for equipment maintenance. Will the Government reimburse material cost via cost-reimbursable ODCs, or must all consumables be included in the fixed price?
Response: Except for CLINs 0004, 1004, 2004, 3004, 4004, and 5004, all pricing is firm-fixed-price. Regarding the ownership of special tools and parts, per section 2.7, the contractor is responsible for ordering, picking up, and storing parts for equipment maintenance. The Government will not reimburse material costs through cost-reimbursable ODCs; all consumables must be included in the fixed price.
Question 30: Collective Bargaining Agreement (CBA). Page 76 references a CBA between Gemini Tech Services LLC and IUOE Local 624 covering certain task areas. Is that CBA still in force and binding on the successor contractor under FAR 52.222-41(n)? If yes, can the Government furnish the full agreement?
Response: The Collective Bargaining Agreement (CBA) has been added as an attachment.
Question 31: Is Gemini Tech Services the incumbent. If not, who is the incumbent and if we are awarded this contract do you expect us to absorb their employees.
Response: Gemini Tech Services LLC is the incumbent contractor.
Question 32: How many FTEs are required for this requirement? (PWS Para 1.0 SCOPE, page 13).
Response: the Government has estimated the following for informational purposes only:
Position Location Hours (per year)
2.1 (A) School Student Liaison NCTC Gulfport 1992
2.2 Mail Room Operations Support NCTC Gulfport 1992
2.3 Command Pass Coordinator Support Det. Sheppard 1992
2.4 Safety and Occupational Health Support NCTC Gulfport 1992
2.5 IT Support NCTC Gulfport 1992
2.6 Student Liaison Support Det. Fort Leonard Wood 1992
2.7 Light/Heavy Equipment Support NCTC Gulfport 5976
2.8 Administrative/Executive Command Support NCTC Gulfport 1992
2.9 Facilities Maintenance Support NCTC Gulfport 1992
Question 33: What is the anticipated or estimated value of this contract requirement?
The Independent Government Estimate (IGE) cannot be shared. Contractors are encouraged to submit their quotes based on their own cost estimates and the requirements outlined in the solicitation.
Question 34: Can the government please provide a historical FTE count?
Response: the Government has estimated the following for informational purposes only:
Position Location Hours (per year)
2.1 (A) School Student Liaison NCTC Gulfport 1992
2.2 Mail Room Operations Support NCTC Gulfport 1992
2.3 Command Pass Coordinator Support Det. Sheppard 1992
2.4 Safety and Occupational Health Support NCTC Gulfport 1992
2.5 IT Support NCTC Gulfport 1992
2.6 Student Liaison Support Det. Fort Leonard Wood 1992
2.7 Light/Heavy Equipment Support NCTC Gulfport 5976
2.8 Administrative/Executive Command Support NCTC Gulfport 1992
2.9 Facilities Maintenance Support NCTC Gulfport 1992
Question 35: Can the Government provide the incumbent contractor’s, associated contract number?
Response: Purchase Order N6883623P0156
Question 36: Can the Government provide a copy of the published CBA and corresponding wage rates under the agreement for pricing purposes?
Response: The Collective Bargaining Agreement (CBA) has been added as an attachment.
Question 37: Are there any known performance challenges associated with the incumbent contract?
Response: Contractor performance assessments, including those documented in the Contractor Performance Assessment Reporting System (CPARS), are confidential and intended for internal government use only. These evaluations are based on the Government's assessment of the incumbent contractor's performance and are not publicly available to maintain fairness, protect proprietary information, and ensure an unbiased evaluation process for all parties involved. We encourage you to base your quote on the requirements outlined in the solicitation.
Question 38: Can the Government provide the historical labor hours associated with the incumbent Gemini Tech Services LLC?
Response: the Government has estimated the following for informational purposes only:
Position Location Hours (per year)
2.1 (A) School Student Liaison NCTC Gulfport 1992
2.2 Mail Room Operations Support NCTC Gulfport 1992
2.3 Command Pass Coordinator Support Det. Sheppard 1992
2.4 Safety and Occupational Health Support NCTC Gulfport 1992
2.5 IT Support NCTC Gulfport 1992
2.6 Student Liaison Support Det. Fort Leonard Wood 1992
2.7 Light/Heavy Equipment Support NCTC Gulfport 5976
2.8 Administrative/Executive Command Support NCTC Gulfport 1992
2.9 Facilities Maintenance Support NCTC Gulfport 1992
Question 39: Does the prime contractor need to possess an active facility clearance at the time of proposal submission, or may the prime apply for and obtain the required clearance after contract award, assuming contract selection?
Response: The prime contractor is not required to possess an active Facility Security Clearance (FCL) at the time of quote submission. However, if selected for award, the contractor must be eligible for sponsorship, and the Government will initiate the FCL process after award.
Question 40: We request that the NAICS code be changed back from 561210 to 561110, and the size standard be changed back from $47M to $12.5M.
Response: Following a detailed analysis of the labor categories, level of effort, and Full-Time Equivalents (FTEs) associated with this requirement, the Government determined that the principal purpose of the service being acquired more appropriately aligned with NAICS Code 561210 – Facilities Support Services rather than the previously assigned 561110 – Office Administrative Services.
This determination was made in coordination with the Office of Small Business Programs and in consultation with the Small Business Administration’s 8(a) Program Office. Based on this review and in accordance with FAR Part 19 and SBA’s size standards guidance, the NAICS code was revised to 561210 to ensure proper alignment to the principal purpose of the services being acquired.
The Government believes this designation most accurately reflects the nature of the requirement.
Question 41: We respectfully request clarification on the rationale behind these (NAICS Code) changes and how the agency intends to ensure all offerors are afforded an equal opportunity to compete.
Response: Following a detailed analysis of the labor categories, level of effort, and Full-Time Equivalents (FTEs) associated with this requirement, the Government determined that the principal purpose of the service being acquired more appropriately aligned with NAICS Code 561210 – Facilities Support Services rather than the previously assigned 561110 – Office Administrative Services.
This determination was made in coordination with the Office of Small Business Programs and in consultation with the Small Business Administration’s 8(a) Program Office. Based on this review and in accordance with FAR Part 19 and SBA’s size standards guidance, the NAICS code was revised to 561210 to ensure proper alignment to the principal purpose of the services being acquired.
The Government believes this designation most accurately reflects the nature of the requirement.
Question 42: Please provide the hire dates of incumbent staff to ensure all offerors have the information needed to accurately price their solutions.
Response: On January 20, 2025, President Trump issued Executive Order 14148, which revoked EO 14055. As a result, federal contractors are no longer required to offer employment to predecessor contract employees under the nondisplacement provisions previously mandated by EO 14055.
The Government is not providing incumbent staff hire dates.
Question 43: Because you have not provided a cost-reimbursable CLIN for the materials required for equipment maintenance under PWS section 2.7, please provide a complete equipment list.
Response: 89 units of civil engineering support equipment, currently ~ 22:1 ratio of equipment to mechanics.
Question 44: Because you have not provided a cost-reimbursable CLIN for the materials required for equipment maintenance under PWS section 2.7, please provide historical data on the nature, cost, number, and frequency of the minor and major repairs referenced in PWS section 2.7.
Response: Regarding cost, all parts are procured and provided by a separate command, so we do not track that information.
It's also difficult to provide historical maintenance totals due to the absence of a centralized reporting system.
However, last month we completed 35 preventative maintenance checks and 56 corrective (breakdown) repairs.
The volume of corrective, unscheduled maintenance each month varies based on class schedules, the type of training being conducted, and the specific equipment in use.
We currently maintain 89 units of equipment. Each unit undergoes at least quarterly preventative maintenance checks, tailored to the equipment type. Additional maintenance is triggered by factors such as hours of operation, mileage, usage conditions, and configuration changes (e.g., attachments or modifications).
Question 45: As part of amendment 0001, I see TX is covered in the CBA as a PA IV. Is the position at Ft Leonard wood also under the CBA or is that a straight local DOL wage determination (SCA)? It is not addressed anywhere.
Response: The Collective Bargaining Agreement (CBA) defines both the geographic areas of coverage and the positions subject to its terms. This agreement serves as the authoritative source for determining which employees and work locations fall within its scope, ensuring consistent and equitable application in accordance with applicable labor law and regulatory guidance.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 09-May-2025 10:00 AM to 12-May-2025 10:00 AM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .