Statement of Work (SOW)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Particle_Counter_SOW_CDRLs_1.docx | DOCX document | |
| N6833519R0195_-_Particle_Counter_RFP1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQUISITION ENGINEERING AND LOGISTICS SUPPORT STATEMENT OF WORK FOR THE
PARTICLE COUNTER
Version 3.4 25 July 2019
DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U. S. DoD Contractors only (Administrative or Operational Use), (10 Dec 2013). Other request for this document shall be referred to Commander, Naval Air Systems Command (PMA-260), RADM William Moffett Bldg, 47123 Buse Rd, Bldg 2272 Patuxent River, MD 20670-1547.
This information is furnished upon the condition that it or knowledge of its possession will not be disclosed to another nation, and that it will not be used for other than the military purpose for which it is being provided without specific authority from the U.S. Department of the Navy; that individual or corporate proprietary rights contained within, whether patented or not, will be respected; that the information will be provided the same degree of security afforded it by the U.S. Department of Defense. Regardless of any declassification markings, this information may not be downgraded or declassified by a foreign recipient without the written approval of the originating U.S. agency.
EXPORT WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Dissemination accordance with provisions of DoD Directive 5230.25 DESTRUCTION NOTICE: For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of this document
UNCLASSIFIED//FOR OFFICIAL USE ONLY
THIS PAGE INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS
| 1.0 | SCOPE | 6 |
| 2.0 | APPLICABLE DOCUMENTS | 6 |
| 3.0 | REQUIREMENTS | 7 |
| 3.1 | GENERAL | 7 |
| 3.2 | PROGRAM MANAGEMENT REQUIREMENTS | 7 |
| 3.2.1 | INTEGRATED MASTER SCHEDULE (IMS) (CDRL A001) | 7 |
| 3.3 | MEETINGS AND REVIEWS (CDRL A002) | 7 |
| 3.3.1 | MEETING RESPONSIBILITIES | 8 |
| 3.3.2 | POST AWARD/LOGISTICS GUIDANCE CONFERENCE | 8 |
| 3.3.3 | SYSTEM REQUIREMENTS REVIEW-II (SRR-II)/PRELIMINARY DESIGN REVIEW (PDR) | 8 |
| 3.3.4 | CRITICAL DESIGN REVIEW (CDR) | 9 |
| 3.3.5 | CONTRACTOR TEST READINESS REVIEW (CTRR) | 9 |
| 3.3.6 | SYSTEM VERIFICATION REVIEW (SVR) / PRODUCTION READINESS REVIEW (PRR) | 10 |
| 3.4 | TECHNICAL DATA PACKAGE (TDP) | 10 |
| 3.4.1 | TOP ASSEMBLY DRAWING WITH INDENTURED BILL OF MATERIALS (BOM) (CDRL A003) | 11 |
| 3.5 | CONFIGURATION MANAGEMENT (CM) | 11 |
| 3.5.1 | ENGINEERING CHANGE PROPOSALS (ECP) (CDRL A004) | 11 |
| 3.6 | REQUEST FOR DEVIATION (RFD) | 11 |
| 3.7 | REQUIREMENTS TRACEABILITY MATRIX (CDRL A005) | 11 |
| 3.8 | SAFETY | 11 |
| 3.9 | QUALITY MANAGEMENT | 11 |
| 3.10 | END ITEM PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION | 11 |
| 4.0 | TESTING | 12 |
| 4.1 | MASTER TEST PLAN (CDRL T001) | 12 |
| 4.2 | FAILURE REPORTING, ANALYSIS AND CORRECTIVE ACTION SYSTEM (FRACAS) (CDRLS T002 & T003) | 12 |
| 4.3 | PILOT PRODUCTION TEST (PPT) PROGRAM | 13 |
| 4.3.1 | PILOT PRODUCTION ACCEPTANCE TESTING (PPAT) (CDRLS T004 & T005) | 12 |
| 4.3.2 | PILOT PRODUCTION TESTING I (PPT I) (CDRLS T006 & T007) | 12 |
| 4.3.3 | PILOT PRODUCTION TESTING II (PPT II) (CDRLS T008 & T009) | 13 |
| 4.3.4 | PILOT PRODUCTION UNITS REFURBISHMENT: | 13 |
| 4.4 | CONTRACTOR SUPPORT OF INDEPENDENT GOVERNMENT TESTING: | 13 |
| 4.5 | PRODUCTION ACCEPTANCE TESTING (PAT) (CDRLS T010 & T011) | 13 |
| 4.6 | FULL-RATE PRODUCTION (FRP) UNIT DELIVERY | 14 |
| 5.0 | ACQUISITION LOGISTICS SUPPORT (ALS) | 14 |
| 5.1 | VENDOR DATA REQUIREMENTS | 14 |
| 5.2 | SYSTEMS ALLOCATION DOCUMENT (SAD) (CDRL L001) | 14 |
| 5.3 | SUPPORT EQUIPMENT AND MATERIAL REQUIREMENTS: | 14 |
| 5.4 | LOGISTICS PRODUCT DATA (LPD) ELEMENTS INPUT DATA (CDRL L002) | 14 |
| 5.5 | VENDOR AND SUPPLY INFORMATION | 15 |
| 5.6 | ENGINEERING DATA FOR PROVISIONING (EDFP) (CDRL L003) | 15 |
| 5.7 | TECHNICAL MANUAL REQUIREMENTS (CDRL L004 AND L005) | 15 |
| 5.8 | INTERIM SUPPORT ITEMS LIST (ISIL) (CDRL L006) | 15 |
| 5.8.1 | ISIL PACKAGING REQUIREMENTS (CDRL L007 & CDRL L008) | 15 |
| 5.9 | TRAINING REQUIREMENTS SUMMARY (CDRL L009) | 16 |
| 5.9.1 | FAMILIARIZATION TRAINING CONDUCT REQUIREMENTS | 16 |
| 5.9.2 | COURSE CONDUCT INFORMATION PACKAGE (CCIP) (CDRL L010) | 16 |
| 5.9.3 | GOVERNMENT SUITABILITY DEVELOPMENTAL TEST TRAINING (DT TRNG)/TRAIN THE TESTERS CONDUCT | 16 |
| 5.9.4 | INITIAL FACTORY TRAINING (IFT) CONDUCT | 16 |
| 5.9.5 | GOVERNMENT FURNISHED INFORMATION (GFI) | 16 |
| 5.9.6 | SCHEDULE AND LOCATION | 16 |
| 5.10 | CALIBRATION REQUIREMENTS | 16 |
| 5.10.1 | CALIBRATION AND MEASUREMENT REQUIREMENTS SUMMARY (CMRS) (CDRL L011) | 17 |
| 5.10.2 | INITIAL CALIBRATION OF DELIVERABLE ASSETS (CDRL L012) | 17 |
| 5.10.3 | INSTRUMENT CALIBRATION PROCEDURES (ICPS) SOURCE DATA (CDRL L013) | 17 |
| 5.11 | OBSOLESCENCE MANAGEMENT | 17 |
| 5.11.1 | DIMINISHING MANUFACTURING SOURCES & MATERIAL SHORTAGES (DMSMS) MANAGEMENT PLAN (CDRL L014) | 17 |
| 5.12 | ITEM UNIQUE IDENTIFICATION (IUID) MARKING OF US MILITARY PROPERTY (CDRL L015) | 18 |
| 5.12.1 | CONSTRUCT AND METHOD | 18 |
| 5.12.2 | UID LOCATION AND MARKING | 18 |
| 5.12.3 | PERMANENCY AND LEGIBILITY | 18 |
| 5.12.4 | UID REGISTRATION | 18 |
| 5.12.5 | RECORDS | 18 |
| 5.13 | WARRANTY (CDRL L016) | 18 |
APPENDIX A TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) 19
APPENDIX B ACRONYMS 48
ii
| 1.0 | Scope: This Statement of Work (SOW) identifies the Contractor’s tasks required during the various phases of the program to design, manufacture, assemble, test, produce and support a Particle Counter that meets the requirements defined in the System Specification (SS) (PMA260C21/7120). |
| 2.0 | Applicable Documents: The following documents are applicable to this SOW, the appendices, and the enclosures to the extent specified herein and are in effect on the date of the RFP, unless otherwise stated. In the event of a conflict between this SOW and the references cited herein, this SOW shall take precedence. Nothing in the SOW, however, shall supersede applicable laws and regulations. All referenced documents are available upon request. |
| Document Number | |
| Date | |
| Purpose | |
| Document Title |
| ASQ/ANSI/ISO 9001:2015 |
| 10/12015 |
| Guidance |
| Quality Management Systems – Requirements |
| CENNAVAVNTECHTRA 1540 |
| 5/16/2003 |
| Guidance |
Impaired Training and Education Report (ITER) Policy and Reporting Procedures
| DFARS 252.223-7001 |
| 6/26/2015 |
| Guidance |
| Defense Federal Acquisition Regulation System Hazard Warning |
| DI-QCIC-80278C |
| 1/23/2017 |
| Required |
| Calibration and Measurements Requirements Summary (CMRS) |
| DI-SESS-81758A |
| 5/22/2013 |
| Required |
| Logistics Product Data |
| DI-SESS-81874 |
| 12/7/2012 |
| Required |
| Engineering Data For Provisioning (EDFP) |
| DOD 4160.21 |
| 8/18/1997 |
Defense Materiel Disposition Manual
| DOD 5220.22-M |
| 2/1/2006 |
| Required |
| National Industrial Security Program Operating Manual |
| GEIA-HB-0007 |
| 2/12014 |
| Guidance |
| Logistics Product Data Handbook |
| GEIA-STD-0007 |
| 5/1/2013 |
| Guidance |
| Logistics Product Data |
| ISO 10005 |
| 6/12018 |
| Guidance |
| Quality Management - Guidelines for Quality |
Plans
| ISO 9660 |
| 1/1/1988 |
| Guidance |
| Information Processing – Volume and File Structure of CD-ROM for Information Interchange – First Edition |
| MIL-HDBK-1839A |
| 11/27/2000 |
| Required |
| Calibration and Measurement Requirements |
| MIL-HDBK-2155 |
| 12/11/1995 |
| Guidance |
| Failure Reporting, Analysis, and Corrective Action Taken |
| MIL-HDBK-61A |
| 2/7/2001 |
| Guidance |
| Configuration Management Guidance |
| MIL-PRF-29612B |
| 8/31/2001 |
| Guidance |
| Training Data Product Specification |
| MIL-STD-130N |
| 11/16/2012 |
| Required |
| Identification Marking of U.S. Military Property |
| MIL-STD-1521B |
| 4/10/1995 |
| Guidance |
| Technical Reviews and Audits for Systems, Equipments, and Computer Software |
| MIl-STD-1839D |
| 5/12/2010 |
| Required |
| Department of Defense Standard Practice Calibration and Measurement Requirements |
MIL-STD-2073-1E
| 7/9/2018 |
| Guidance |
| Standard Practice for Military Packaging |
| MIL-STD-3001 |
| Series |
| Required |
| Preparation of Digital Technical Information for Multi-Output Presentation of Technical Manuals |
| MIL-STD-31000B |
| 10/31/2018 |
| Required |
| Technical Data Packages |
| MIL-STD-882E |
| 5/11/2012 |
| Required |
| Standard Practice System Safety |
| NAS 411 |
| 9/30/2013 |
| Required |
| Hazardous Materials Management Program |
| NAVAIR 17-35NCE-1 |
| 10/1/2013 |
| Required |
| Navy Calibration Equipment List |
| NAVAIR 17-35QAC-01B |
| 2/11/2015 |
| Required |
| Naval and Marine Corps Calibration Laboratory Audit / Certification Manual |
| NAVAIRINST 13640.1B |
| 9/5/2001 |
| Required |
| Naval Aviation Metrology and Calibration Program |
| NAVEDTRA 130B |
| 5/11993 |
| Guidance |
| Executive Overview of the Naval Education and Training 130 Series Manuals |
| PMA260C21/7120 |
| 12/1/2018 |
| Required |
| Particle Counter System Specification |
| SAE EIA-649-1 |
| 11/1/2014 |
| Guidance |
| Configuration Management Requirements For Defense Contracts |
| SAE JA1000-1 |
| 3/1/1999 |
(R 2012)
| Required |
| Reliability Program Standard Implementation Guide |
| SECNAV M-5510.36 |
| 6/1/2006 |
| Required |
| Department of the Navy Information Security Program |
3.0 Requirements:
| 3.1 | General: The Contractor shall provide the necessary personnel, facilities and equipment to perform the work identified herein. This SOW identifies the engineering, logistics, testing and other tasks to be performed by the Contractor for the production and support of the Particle Counter. The Contractor shall provide program management, engineering, fabrication, testing, technical and logistics support and other services in accordance with the detailed requirements in the following paragraphs. The design and end items procured under this contract shall meet the requirements set forth by the Particle Counter SS PMA260C21/7120. |
| 3.2 | Program Management Requirements: For the period of performance of this contract, the Contractor shall provide a Program Manager (PM). The PM has the full responsibility and a clear line of authority to the Contractor’s executive management for carrying out the specific requirements of this SOW. The PM shall manage this effort holding schedule reviews; tracking to detailed schedules and milestones and implementing and managing a risk mitigation process. The PM shall also authorize, oversee and manage budgets. The PM has responsibility and authority for overall compliance to this SOW, including the Management, Engineering, Production, Test, Quality Assurance activities. |
The PM shall provide visibility to the Government identified Point of Contact (POC) on the status of activities covered by this SOW and shall disclose existing or potential problems and a plan for problem resolution. The PM shall serve as a direct POC for program management concerns and shall maintain communication with Government identified POC personnel for matters relating to program performance and integration.
| 3.2.1 | Integrated Master Schedule (IMS) (CDRL A001) (CLIN 0008): The Contractor shall prepare, implement, manage, and maintain an IMS. The IMS shall be consistent with this SOW, all appendices, and CDRLs. The IMS must be detailed sufficiently that critical and high-risk efforts are identified and planned as realistically as possible to assure executability. The IMS shall include scheduling of all contract deliverables and when these tasks are to be performed and completed. All days shall be considered to be calendar days not business days. Prior to the release for production of the Particle Counter, the Contractor shall provide details for the production, acceptance and delivery of the hardware to the Government. |
| 3.3 | Meetings and Reviews (CDRL A002) (CLIN 0009): The Contractor shall participate in the meetings listed in the table below. During these reviews, the Contractor shall present the status of the program as agreed to with PMA-260. Status shall be communicated through a presentation that shall include agenda, IMS, production status, technical performance issues, logistics, recommended solutions, meeting minutes, action items, and additional information as required. Unless otherwise specified, each meeting shall be hosted at the Contractor's location. |
Table 1 - Meetings/Reviews Summary
| Meeting / Review |
| Required Performance |
(Days After Contract Award)
| Location |
| Minimum Required Personnel |
| Post Award/Logistics Guidance Conference |
| 30 DACA |
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
| System Requirements Review (SRR)-II/Preliminary Design Review (PDR) |
| 90 DACA |
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
| Critical Design Review (CDR) |
| 210 DACA |
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
| Contractor Test Review (CTR) |
| 330 DACA |
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
| System Verification Review (SVR) / Production Readiness Review (PRR) |
| 510 DACA |
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
| Technical manual in-process reviews and verification |
| 30 DAYS PRIOR TO PDR |
7 DAYS AFTER CDR
30 DAYS PRIOR TO CTRR
30 DAYS AFTER SVR/PRR
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
| Training (developmental test training and initial factory training) |
| 330 DACA |
60 DAYS PRIOR TO IOC
| Contractor’s Facility |
| Contractors (Prime and Sub), Engineering, and Logistics Personnel |
NOTE: The above are the minimum number of meetings/reviews that will be held. Additional reviews can be proposed. Where possible, Manufacturing, Logistics and Integrated Product Team (IPT) reviews will be combined.
| 3.3.1 | Meeting responsibilities: Prior to each meeting, the Contractor shall submit to the Government a draft PowerPoint presentation with detailed background information to inform the Government of current program status. The presentation shall also include identification of risks to the program’s execution that have been identified by the Contractor. Each risk shall include a description of the risk, potential impact, and the intended strategy to mitigate the risk. The Contractor shall record minutes and action items from each meeting and provide tracking resolution. Unless otherwise noted, the Contractor shall be responsible for ensuring that each item identified as an entrance criterion is provided to the Government at least 15 days prior to the related meeting. All exit criteria shall be presented at the meeting. Failure to complete entrance/exit criteria will result in Requests for Action (RFAs) written by the Government and provided to the Contractor. Until all RFAs are completed (closed out), the review milestone cannot be passed. RFAs will be provided to the Contractor within 5 days after each review. The Contractor shall also be responsible for updating the presentation to a final revision following the meeting in order to capture any changes discussed and submit it to the Government within 5 days after the meeting/review. |
| 3.3.2 | Post Award/Logistics Guidance Conference: The Contractor shall host a Post Award/Logistics Guidance Conference NLT 30 days after contract award. The contractor shall provide a full review of the SS and SOW requirements. The Contractor shall demonstrate understanding of the underlying performance baseline set forth in the SS, identify the design approach, drawing practices, preliminary selection of major components, the testing requirements/facilities, all environmental requirements, and any areas of risk. Logistics Guidance Conference will consist of government briefing for each logistics deliverable. This will allow the contractor the opportunity to clarify any questions. |
| 3.3.3 | System Requirements Review-II (SRR-II)/Preliminary Design Review (PDR): The Contractor shall host a SRR-II/PDR NLT 90 DACA. The Contractor shall demonstrate understanding of the underlying performance baseline set forth in the SS, identify the design approach, selection of components, the testing requirements/facilities and all environmental requirements while identifying areas of risk. The review shall address the IMS, engineering, configuration management, logistics management, ILS data development guidance, and test processes. The Contractor shall also provide a diagram showing the layout of components. |
Entrance Criteria
· Meetings and Reviews (CDRL A002)
· Submittal of Requirements Traceability Matrix (CDRL A005)
· Submittal of the System Allocation Document (SAD) (CDRL L001)
· Submittal of Logistics Product Data (LPD) Elements Input Data (CDRL L002)
· Submittal of the Preliminary Calibration Measurement Requirements Summary (CMRS) (CDRL L011)
· Submittal of the Preliminary Item Unique Identification (IUID) Plan (CDRL L015)
Exit Criteria
· Allocated Baseline established
· Risks identified and accepted by Program leadership
· IMS is executable
· All RFAs are resolved
· Required CDRLs (above) have been approved by the Government
3.3.4 Critical Design Review (CDR): The Contractor shall host a CDR NLT 210 DACA. The CDR shall be a detailed review of the hardware for the system; shall provide a traceability matrix demonstrating the design furnished at CDR implements the performance requirements of the SS and present the methods used to verify and validate the design. Once the CDR is approved any changes to the design must be reviewed and approved by the Government.
Entrance Criteria
· Meetings and Reviews (CDRL A002)
· Submittal of Top Assembly Drawing with Bill of Materials (BOM) (CDRL A003)
· Submittal of Requirements Traceability Matrix (A005)
· Submittal of the Master Test Plan (CDRL T001)
· Submittal of the Pilot Production Acceptance Test Procedures (CDRL T004)
· Submittal of the Pilot Production Test (PPT) I Procedures (CDRL T006)
· Submittal of the Updated System Allocation Document (SAD) (CDRL L001)
· Submittal of the Preliminary Engineering Data for Provisioning (EDFP) (CDRL L003)
· Submittal of the Updated Calibration Measurement Requirements Summary (CMRS) (CDRL L011)
· Submittal of the Final IUID Plan (CDRL L015)
Exit Criteria
· Initial Product Baseline established
· Risks are identified and accepted by Program leadership
· The IMS is executable
· All RFAs are resolved
· Required CDRLs (above) have been approved by the Government
3.3.5 Contractor Test Readiness Review (CTRR): The Contractor shall host a CTRR NLT 330 DACA. The test configuration baseline will be established at CTRR. This baseline represents the Particle Counter configuration that will be formally tested to verify conformance to the requirements of the SS. All deliverables shall match the unit design for testing. The IMS submission for the CTRR shall contain a detailed test schedule to include start and end dates for each test as well as test locations (name of laboratory/city, state) and estimated shipping times to/from each location.
Entrance Criteria
· Meeting/Review Agendas and Presentations (CDRL A002)
· Presentation shall include a detailed discussion of any changes to the initial product baseline that was established at the CDR.
· Submittal of updated Top Assembly Drawing with BOM (CDRL A003)
· Submittal of updated Requirements Traceability Matrix (CDRL A005)
· Submittal of updated Master Test Plan (CDRL T001)
· Approved Failure Reporting, Analysis, and Corrective Action System Plan (CDRL T002)
· Approved Pilot Production Acceptance Test Report (CDRL T005)
· Approved PPT I Report (CDRL T007)
· Approved PPT II Procedures (CDRL T008)
· All required test resources (people, facilities, test articles, test instrumentation) are identified and are available for testing
· Submittal of the Updated SAD (CDRL L001)
· Submittal of Updated EDFP (CDRL L003)
· Submittal of the Preliminary Interim Support Items List (ISIL) (CDRL L006)
· Submittal of Training Materials (CDRLs L009 & L010)
· Submittal of Source Data for Forecasting DMSMS (Diminishing Manufacturing Sources & Material Shortages) (CDRL L014)
Exit Criteria
· Test Baseline established
· Risks are identified and accepted by Program leadership
· The IMS is executable
· All RFAs are resolved
· Required CDRLs (above) have been approved by the Government
3.3.6 System Verification Review (SVR) / Production Readiness Review (PRR): The Contractor shall host a SVR/PRR NLT 510 DACA. The SVR/PRR will be used to confirm that any changes negotiated during PPT and Independent Government Testing have been incorporated into the design and that a representative Particle Counter exists with those design elements incorporated. The Contractor shall have a final BOM and Top Assembly Drawing available for Government review at least 15 days prior to the SVR/PRR as well as a printed copy at the review. The final product baseline is established at this review. This baseline is the configuration to which all production Particle Counters will be built. This baseline will be represented by an updated, complete Technical Data Package (TDP) representing the current configuration incorporating any changes that resulted from the PPT or Independent Government Testing failures/ Deficiency Reports (DRs). The Government decision to enter into full rate production (i.e. award production options on the contract) will not be considered until the SVR/PRR milestone is approved.
Entrance Criteria
· Meeting/Review Agendas and Presentations (CDRL A002)
· Submittal of final Top Assembly Drawing with BOM (CDRL A003)
· Submittal of final Requirements Traceability Matrix (CDRL A005)
· Approved Pilot Production Test II Report (CDRL T009)
· Submittal of the Production Acceptance Test Procedures (CDRL T010)
· Submittal of the Final SAD (CDRL L001)
· Submittal of the Final EDFP (CDRL L003)
· Submittal of the Final ISIL (CDRL L006)
· Submittal of the Final ICP Source Data (CDRL L013)
Exit Criteria
· Production Baseline established
· Risk level identified and accepted by Program leadership
· The IMS is executable (technical/cost risks)
· All RFAs are resolved
· Required CDRLs (above) have been approved by the Government
3.4 Technical Data Package (TDP): The Contractor shall develop a TDP to support the Government’s review of the Particle Counter’s design. During review of the TDP, any potential risk areas seen by the Government will be brought to the attention of the Contractor. However, it is ultimately the Contractor’s responsibility to pass the verification requirements of the SS and therefore the Contractor alone is responsible for making design decisions based on assessment of risk.
| 3.4.1 | Top Assembly Drawing with Indentured Bill Of Materials (BOM) (CDRL A003) (CLIN 0010): The Contractor shall prepare and deliver a Top Assembly Drawing, including an exploded view, in Contractor drawing format with an Indentured BOM which includes all repairable components and parts removed or replaced during repair or maintenance. The exploded view can be given as a 3D model, but not required. |
| 3.5 | Configuration Management (CM): The Contractor shall develop a CM program, using NAVAIRINST 4130.1D for guidance. Any change affecting the Particle Counter after CDR and prior to CTR will require the Contractor to inform the Government of the change. Any change affecting the Particle Counter after CTR will require Government approval. The Government must also approve any changes required to technical manuals, LPD Record, Top Assembly Drawing with BOM, specifications, EDFP etc. due to configuration changes. If noncompliance with the requirements of the configuration identification and/or the established baseline becomes necessary, the Contractor shall request a deviation or waiver. The Contractor shall manage obsolescence issues throughout performance on this contract. This includes ongoing review and identification of actual and potential obsolescence problems for all components and piece parts of the Particle Counter. The Contractor shall be responsible for all costs associated with obtaining replacement parts to support development/production efforts in this contract if and when parts become obsolete. The Contractor shall have the responsibility to interface with vendors and Original Equipment Manufacturers (OEMs) to ensure continued operation and support under the contract. |
| 3.5.1 | Engineering Change Proposals (ECP) (CDRL A004) (CLIN 0011): Upon delivery of production Particle Counters to the Government, changes to the Particle Counter design shall require an ECP. All design changes to the product baseline shall be approved by the Government prior to implementation. Class I ECP shall be required for all changes to fit, form and function. Class II changes shall be provided to the Government. See MIL-HDBK-61A for guidance. |
| 3.6 | Request for Deviation (RFD): The Contractor shall not offer items, for acceptance by the Government, that incorporate a known departure from requirements, unless an RFD has been submitted, classified (critical, major, or minor), and approved. A critical deviation consists of a departure involving safety; major deviation consists of a departure involving performance, interchangeability, reliability, survivability, maintainability, durability, health, effective use/operation, and weight/size; minor deviation consists of a departure that does not involve any of the critical and major deviation factors. Deviations classified with Government concurrence shall be submitted for information. Classification disagreements shall be referred to the IPT chair and co-chairs for decision; the PCO will document and disseminate a decision in writing. Authorized deviations apply to a specific quantity of items and will not constitute change to the Particle Counter baseline as defined by the TDP, or SS. The Contractor may process a RFD if, during or after repair of an item that incorporates a known departure from requirements, it is determined that the item is considered suitable for use “as is” or after repair by an approved method. |
| 3.7 | Requirements Traceability Matrix (CDRL A005) (CLIN 0012): A Requirements Traceability Matrix shall be maintained showing, by paragraph, how each requirement of sections 3 & 4 of the SS will be met by the system/system components. |
| 3.8 | Safety: The Contractor shall perform all work under this contract in full compliance with all applicable Federal, State, and local environmental and occupational safety and health regulations. System safety design guidance precedence of MIL-STD-882E shall be followed for the unit, its components, and all of its man and machine interfaces. |
| 3.9 | Quality Management: The contractor shall continually manage and improve the quality of all products and services delivered under this contract and the processes by which they are realized. The system used by the contractor to manage quality shall be compliant with all requirements of, and at a minimum be functionally equal to, a current active version of the ASQ/ANSI/ISO 9001:2015, Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing. The Government shall have the right to audit the contractor's quality system for ASQ/ANSI/ISO 9001:2015 compliance. The Government shall have access, for review and analysis purposes, to contractor QMS documents; raw data that have not been subjected to processing or any other manipulation; summarized, tabularized, or graphical depictions of the data; and records under this contract. |
| 3.10 | End Item Packaging, Handling, Storage, and Transportation: The contractor shall use best commercial practices when packaging and shipping the Particle Counter in its storage/transit case. The Contractor’s packaging personnel shall identify the necessary requirements and planning to ensure that all systems, equipment, and support items are properly preserved, packed, handled, stored, and transported. This encompasses protecting materiel from environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment in the Defense Transportation System. Refer to the Particle Counter SS for storage/transit case requirements. |
| 4.0 | Testing (CLIN 0004): The Contractor’s test effort shall include a logical sequence of tests that shall demonstrate compliance with the SS and supportability requirements of the Particle Counter. The Contractor shall document, via test plans/procedures, the tests required in this section. The Contractor shall provide all test equipment necessary to simulate all significant modes of operation and provide sufficient information to determine suitable test modes and operating environments. The Contractor is responsible for maintaining calibration of all test and measurement equipment and/or ensuring test subcontractor certification. The results of the tests shall be documented and submitted in the appropriate test reports. The Government shall reserve the right to witness any and all testing performed on the Particle Counter hardware. The Contractor will notify the Government when a test is scheduled to commence at least 21 days prior to the test. |
| 4.1 | Master Test Plan (CDRL T001) (CLIN 0013): The Contractor shall submit a Master Test Plan that describes the testing and checkout of the Particle Counter hardware. The test plan shall address all development testing by the Contractor and all testing up to and including Production Acceptance Testing (PAT) of the Particle Counter. The plan shall identify the groups/individuals responsible for the implementation of the test program and describe the testing equipment, manuals, and other resources required. The Master Test Plan shall identify any materials needed to support Government Testing for a minimum of 100 hours of operation. The Master Test Plan shall also include a master schedule of all tests required by this SOW. |
| 4.2 | Failure Reporting, Analysis And Corrective Action System (FRACAS) (CDRLs T002 & T003) (CLINs 0014 & 0015): The Contractor shall utilize a FRACAS Plan in accordance with SAE JA1000-1 Method A.11 and MIL-HDBK-2155 to track, evaluate, and correct failures that occur during the test program. The FRACAS Plan shall identify responsibilities within the IPT for identifying, analyzing, reporting, and scoring failures and potential failures. Each failure or potential failure experienced during testing of the Particle Counter shall have a preliminary Failure Reporting, Analysis and Corrective Action System (FRACAS) Report prepared and submitted within 24 hours of the discovery of the failure or potential failure. A final FRACAS Report shall be submitted within 30 days of the preliminary report. |
| 4.3 | Pilot Production Test (PPT) Program (CLINs 0001, 0002 & 0003): The Contractor shall produce ten (10) PPUs (six (6) Hydraulic Particle Counter units, two (2) Phosphate Ester “Skydrol™” Particle Counter units, and two (2) Navy Oil Analysis Program (NOAP) labs Particle Counter units) for use during Pilot Production Test (PPT) and Independent Government Testing. The Pilot Production Units (PPUs) shall be calibrated by the Contractor prior to PPT I. Additionally, any follow-on calibration required during the testing phase Pilot Production Acceptance Testing (PPAT), PPT I, PPT II, Independent Government Testing, and Production Acceptance Testing (PAT) shall also be performed by the Contractor. All PPUs shall undergo all PPT I which encompasses PPAT. A QTY of four (4) PPUs will be shipped FOB Destination to Naval Air Warfare Center Aircraft Division, 22763 Saufley Rd, Unit 1, Building 1405, Patuxent River, MD 20670, 330 DACA for Independent Government Testing while PPT II is ongoing. The PPU Units shipped to the Naval Air Warfare Center Aircraft Division, Patuxent River, MD should consist of two (2) Hydraulic Particle Counters, one (1) Phosphate Ester Particle Counter and one (1) NOAP Particle Counter. The Contractor is required to complete CTR prior to shipment of these units. These Particle Counters, along with the technical data package, will represent the intended Final Product Baseline and will serve as models to which all production Particle Counters will be built. Upon completion of testing the Contractor shall refurbish the PPUs to production level standards. |
| 4.3.1 | Pilot Production Acceptance Testing (PPAT) (CDRLs T004 & T005) (CLINs 0016 & 0017): PPAT consists of simple performance checks of the SS requirements that each Particle Counter shall meet. The Contractor shall compile PPAT procedures based on the PPAT selected requirements in Appendix F of the SS and the approved Requirements Traceability Matrix. The Contractor may substitute commercial acceptance procedures as PPAT procedures following Government approval. PPAT shall not begin until Government approval of the PPAT procedures (CDRL T004) and successful completion of the Critical Design Review (CDR). All PPUs shall be subjected to all PPAT. The Contractor shall complete all PPAT NLT 120 days from the approval of PPAT procedures. Upon completion of PPAT, the Contractor shall document the test findings and submit a PPAT report. The report shall document all major subassembly serial numbers, acceptance / failures and results of testing. The report shall also provide a record of the testing performed. The report shall consist of: (a) a summary of tests, (b) a test log which provides a history of the formal tests, (c) a test data sheet which provides formal test results, (d) a summary of the analysis and evaluation of the test results, and (e) recommendations. The Contractor shall document verification of all specification requirements, by paragraph number, identified as having a verification method of “Analysis” or “Inspection” as defined in Appendix C of the SS. The report provides the Government with a permanent record of the formal testing which can be used to denote acceptance of the production baseline. |
| 4.3.2 | Pilot Production Testing I (PPT I) (CDRLs T006 & T007) (CLINs 0018 & 0019): PPT I will be used to test basic performance requirements of the SS ensuring the Particle Counter can perform its mission at the contractor’s facility prior to PPT II. The Contractor shall compile PPT I procedures based on the PPT I selected requirements in Appendix C of the SS and the approved Requirements Traceability Matrix. PPT I testing shall not begin until Government approval of the PPT I procedures. The Contractor will have NLT 60 days to complete PPT I testing. The Government may ask for a demonstration of any or all of the PPT I tests. Upon completion of PPT I, the Contractor shall document the test findings and submit a PPT I test report. The report shall document all major subassembly serial numbers, acceptance / failures and results of testing. The report shall also provide a record of the testing performed. The report shall consist of: (a) a summary of tests, (b) a test log which provides a history of the formal tests, (c) a test data sheet which provides formal test results, (d) a summary of the analysis and evaluation of the test results, and (e) recommendations. The Contractor shall document verification of all specification requirements, by paragraph number, identified as having a verification method of “Analysis” or “Inspection” as defined in Appendix C of the SS. The report provides the Government with a permanent record of the formal testing which can be used to denote acceptance of the production baseline. |
| 4.3.3 | Pilot Production Testing II (PPT II) (CDRLs T008 & T009) (CLINs 0020 & 0021): PPT II will be used to verify that the Particle Counter complies with environmental, certification, and reliability & maintainability type requirements. The Contractor shall compile PPT II procedures based on the PPT II selected requirements in Appendix F of the SS and the approved Requirements Traceability Matrix. The plan and procedure shall be in contractor format and include a summary description of all tests; test data sheets; lists of test equipment, accessories, and test fixtures required; and detailed test procedures. PPT II testing shall not begin until Government approval of PPT II procedures and the successful completion of PPT I on the Particle Counters. Throughout testing, the Contractor will provide weekly progress reports to the Government. The Contractor will have NLT 180 days from the approval of PPT II procedures and the completion of the PPT I milestone in which to complete all PPT II testing. Upon completion of PPT II, the Contractor shall document the test findings and submit a PPT II report. The report shall document all major subassembly serial numbers, acceptance / failures and results of testing. The report shall also provide a record of the testing performed. The report shall consist of: (a) a summary of tests, (b) a test log which provides a history of the formal tests, (c) a test data sheet which provides formal test results, (d) a summary of the analysis and evaluation of the test results, and (e) recommendations. The Contractor shall document verification of all specification requirements, by paragraph number, identified as having a verification method of “Analysis” or “Inspection” as defined in Appendix C of the SS. The report provides the Government with a permanent record of the formal testing which can be used to denote acceptance of the production baseline. |
| 4.3.4 | Pilot Production Units Refurbishment (CLIN 5000): The PPUs shall be refurbished to production configuration and condition NLT 180 days after release for Full-Rate Production (FRP). . At a minimum, this shall include the following: |
· Removal and treatment of any corrosion
· Replacement of any damaged component
· Fresh paint as necessary
· New filters
· Labels, Placards and Stickers like new or replaced
· Fasteners replaced as required
· Operational in all configurations
· Passed Acceptance Test Procedure (ATP)
· Specification compliance
· Full Warranty IAW the Contract
| 4.4 | Contractor Support of Independent Government Testing (CLIN 0005): The Contractor shall provide support during the suitability/supportability evaluation by the Government. The Contractor shall provide any parts that may fail during the evaluation period. All materials listed in the Master Test Plan identified to support Government testing shall be delivered with the PPUs for the start of testing. The Government will conduct the evaluation of the Particle Counter at the Patuxent River, MD testing facility. The Contractor shall provide up to 2 on-site technical support visits to support Government testing. This support shall be provided by the Contractor within 72 hours of being notified of the requirement/need unless otherwise agreed upon between the Contractor and the Government. |
| 4.5 | Production Acceptance Testing (PAT) (CDRLs T010 & T011) (CLINs 0022 & 0023): The Contractor shall provide a PAT Procedure for Government approval. The PAT Procedure is a simple list of performance checks of SS requirements that the refurbished PPUs and each production Particle Counter shall meet. The Contractor shall compile a PAT Procedure based on the requirements indicated in Appendix C of the SS. The Contractor shall provide two electronic copies of the PAT Report detailing the results for each production Particle Counter and the refurbished PPUs. The PAT Report shall display successful passing, failure, and failure resolution of the PAT Procedure for each Particle Counter tested. The Contractor shall include a copy of the Calibration Certificate as part of each PAT. |
| 4.6 | Full-Rate Production (FRP) Unit Delivery (Production CLINs 100X, 200X, 300X, 400X): Full-Rate Production (FRP) Units will be ordered in accordance with the contract, provided that release for production has been authorized. Production of the PPUs does not constitute full release for production. NLT 180 days after award of the first production delivery order, the Contractor shall deliver the first FRP unit. The Government will supply shipping instructions for each delivery order after contract award. |
| 5.0 | Acquisition Logistics Support (ALS) |
| 5.1 | Vendor Data Requirements: The Contractor shall require as part of its purchase agreements with components sub-vendors, that these sub-vendors submit product specification data [i.e. part number, Original Equipment Manufacturer (EM) info etc.). The contractor shall insure that all manufacturers provided on the ISIL by CAGE code must maintain active registration in the System of Award Management (SAM) database throughout the period of performance on this contract. Technical Manual submissions will include sub-vendor data. Sub-vendor should only be provided if part is not modified by the prime vendor. |
| 5.2 | Systems Allocation Document (SAD) (CDRL L001) (CLIN 0024): System Allocation Document such as a spreadsheet or database which identifies all source data and drawings used with their revision letter and revision date must be provided at each formal logistics or engineering review such as Tech Manual Reviews, Maintenance Planning Reviews and SETRs. Hard copies of documents/drawings identified shall be available at all reviews. Use of SAD format shown in MIL-STD-1521, (cancelled) Para 40.18.2 is encouraged. This is needed to ensure any future engineering changes during program development are properly incorporated into the logistics product support elements. |
| 5.3 | Support Equipment and Material Requirements: If any software, support equipment, material or special tools are required for the operation and/or maintenance of the Particle Counter, the Contractor shall identify each for Government approval at the Post Award Guidance Conference or as soon as the requirement is identified. The Contractor shall identify Support Equipment and Material Requirements for each corrective and preventive maintenance task. Support Equipment is defined as all special tools or test sets required to accomplish a given task, with the following exceptions: |
a. Common hand tools need not be individually identified however common metric hand tools need to be identified. When required, they shall be documented with a single entry in the task inventory using “30003” for the “CAGE”, “VARIOUS” for the reference number and “COMMON HAND TOOLS” for the Item Name.
b. Common measuring devices, such as torque wrenches, voltmeters, etc. shall be documented by range, e.g. 0 – 150 ft.-lbs.
c. Those items of Support Equipment identified will be reviewed by the Government to determine if a similar, suitable item already exists in the Government’s inventory. Those items identified as peculiar to the Particle Counter will be provided by the Contractor to the Government to evaluate during Government testing and will be identified by Part Number, CAGE, source of supply, drawing and estimated cost.
Material Requirements are defined as all consumable items required to accomplish a specific task such as o-rings, seals, rags, oils, and lubricants.
5.4 Logistics Product Data (LPD) Elements Input Data (CDRL L002) (CLIN 0025): The Contractor shall provide the following data elements which are defined in GEIA-STD-0007, for all parts identified in support of the End Item.
Data shall be submitted in a Microsoft Excel format for all components within the system and shall be updated as required IAW the CDRL L002. The Contractor shall identify changes and additions within each LPD Element Input data submission by highlighting that amended portion of the Excel document and submitting deliveries IAW the CDRL. Each LPD Element Input Data submission shall be accompanied by a Top Down Break Down (TDBD) engineering drawing tree which substantiates the Logistics Control Number (LCN) structure and TDBD provided in the LPD Elements Input Data spreadsheet IAW the CDRL L014.
The following data elements are required for all parts in support of the end item: DTN #2790, DTN #1520, DTN #4400, DTN #1070, DTN #2280, DTN #3520, DTN #2520, DTN #4830, DTN #4190, DTN #5700, DTN #3990, DTN #4020, DTN #2730, DTN #2080, DTN #1740, DTN #1820.
For all those parts deemed repairable or maintenance significant consumable items, these additional data elements are also required: DTN #3510, DTN #5820, DTN #3380, DTN #3270, DTN #3380, DTN #5010.
| 5.5 | Vendor and Supply Information: The vendor and supply information, documented in the LPD Element Input Data and supporting documentation, shall be the direct source of manufacturing/supply/original equipment manufacturer (OEM) for the part. This information governs how DLA and NAVSUP will acquire the part(s) in question. The direct vendor's part number and CAGE shall be documented as the primary source of supply. If the primary vendor/suggested source of supply is not the design control authority, then the design control authority part number and CAGE, e.g. 30003 CAGE code items, shall be documented as an alternate/secondary supply reference. If the direct source of manufacturing/supply/OEM of the part only sells their parts through a recommended distributor, then the required distributor's part number and CAGE shall be documented as the primary source of supply. In this case, the direct source of manufacturing/supply/OEM for the part shall have their part number and CAGE documented as an alternate/secondary source of supply. Further, if the direct source of manufacturing/supply/OEM for the part does not sell directly and insists on requiring purchasing/sale through their distributor, then a letter documenting said fact shall be delivered as an attachment to the Provisioning Parts List (PPL) to support the provisioning data. |
| 5.6 | Engineering Data For Provisioning (EDFP) (CDRL L003) (CLIN 0026): Form, fit, and function data is used synonymously with Engineering Data for Provisioning (EDFP). EDFP is defined as technical data which provides definitive identification of dimensional, material, mechanical, electrical, functional and/or other characteristics that depict the physical characteristics, location, and function of the item. It includes specifications, standards, photographs, descriptions, assembly and general arrangement drawing, schematic diagrams, wiring, cabling diagrams, and similar data needed to indicate the location and functions of the item. |
The Contractor shall submit EDFP for all items contained within the LPD Element Input data and Design Change Notice (DCN) submissions. All items that are in the LPD Element Input data that have been previously identified in the ISIL must have specification sheets submitted. EDFP for repairable assemblies and consumables obtained from vendors and subcontractors shall be submitted in the same manner. Consumable items will be provided without any further breakdown of the Top Assembly Drawing. EDFP shall be submitted in PDF file format and can be delivered via Compact Disk (CD) or through an approved electronic data file transfer. Files names shall include the appropriate reference/part number.
Revised EDFP shall be submitted for subsequent changes to the product baseline and shall include any additions, superseding, or modification of the end item or any provisioned part of the end item. The revisions shall be used to identify changes to the original EDFP.
| 5.7 | Technical Manual Requirements (CDRLs L004 & L005) (CLINs 0027 & 0028): This section specifies the requirements for development, validation/verification and delivery of the End Item Technical Manuals (TM). A complete Operation and Maintenance Instructions Technical Manual with Illustrated Parts Breakdown (IPB) shall be developed for the in-service operation, and training of the End Item. A Pre-Operational (Pre-Op) and Maintenance Requirement Card (MRC) will also be created. The TM shall be developed and delivered in accordance with the Technical Manual Contract Requirement (TMCR) Number 17-002 as provided in APPENDIX A, CDRL L004 and L005. |
| 5.8 | Interim Support Items List (ISIL) (CDRL L006) (CLIN 0029): The Contractor shall provide an Interim Support Item List (ISIL) in accordance with GEIA-0007 that reflects the recommended Contractor furnished (including vendor items) spares, high usage repair parts and scheduled maintenance parts required to support the Particle Counter for a period of 24 months (from IOC to MSD). In addition to the ISIL, catalog specification sheets, showing the OEM part number and leading technical characteristics for each vendor item shall be included. The following data elements are the minimum data requirements for the ISIL: DT #2790, DT #1520, DT #4400, DT #3520, DT #4830, DT #3060, DT #4210, DT #5710, DT #4020, DT #5410, DT #1820 and DT #3920 |
| 5.8.1 | ISIL Packaging Requirements (CDRLs L007 & CDRL L008) (CLINs 0030 & 0031): The Contractor shall preserve, pack materiel as specified below and shall contractually require same by vendors and subcontractors (for materiel being shipped to the government): |
a. MIL-STD-2073-1E, Military Preservation with Military Packing Level A. For items entering the military distribution system (includes any storage at a DOD facility for subsequent destinations), O-CONUS surface shipments.
b. MIL-STD-2073-1E, Military Preservation with Military Packing Level B. For items entering the military distribution system (includes any storage at a DOD facility for subsequent destinations), O-CONUS air (APO/FPO), O-CONUS freight forwarder, or CONUS domestic shipments.
c. All ISIL material shall be marked in accordance with the requirements of MIL-STD-129.
| 5.9 | Training Requirements Summary (CDRL L009) (CLIN 0032): The training method established herein is designed to ensure adequate Navy training capability based on the results of the supportability task analysis and test evaluation for the Particle Counter. It shall enable Navy maintenance and instructor artisans to provide initial familiarization and/or formal follow-on training to fleet Support Equipment (SE) operators/maintainers. Training shall be part of the IPT/design process in order to ensure that design decisions are carefully considered for impact on training. All impacts shall be evaluated and resolved by training/human factors personnel. Submittal of a training course outline is required IAW CDRL-L009. |
| 5.9.1 | Familiarization Training Conduct Requirements: The Contractor shall evaluate approved Particle Counter source data and develop familiarization training sessions in accordance with the stated requirements contained within this document. |
| 5.9.2 | Course Conduct Information Package (CCIP) (CDRL L010) (CLIN 0033): The Contractor shall provide a completed CCIP that will consist of an approved course outline of instruction, course material, attendance sheet, trainee evaluation of training (course critique), and student certificate of completion of training. |
The Contractor shall provide attendees a certificate and the DAPML with a copy of attendance sheet and evaluations at the end of the training session. Development Test personnel will require an indoctrination that is more comprehensive than customary user/maintainer training. Training personnel shall be capable of explaining the system operation and functionality to the depth necessary to support a comprehensive government engineering test and evaluation program.
The Contractor shall submit a draft course…