WIFT_Attachments_A _C _P _R _Q_ENGINEERING_CDRLS.doc
DOC document 673 KB Posted
- Attached to
- V-22 Wire Intermittent Fault Tester (WIFT)
- Solicitation number
- N6833516R0166
About this file
WIFT Exhibits A C P R Q
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-16-R-0166-0001.docx | DOCX document | |
| WIFT_ATTACHMENT_9-CDRL_Distribution_Statement.docx | DOCX document | |
| WIFT_Attachment_4-3909as9999_REV_B_14_June_2016.pdf | ||
| WIFT_Solicitation_N68335-16-R-0166.docx | DOCX document | |
| WIFT_Attachment_5-CDRLaddress_list_22Jan2016.doc | DOC document | |
| WIFT_Attachment__7_Appendix_A_of_NAVAIR_SWP_4800_001_RevA.docx | DOCX document | |
| WIFT_Attachment_3-SGFP_Listing.pdf | ||
| WIFT_Attachment_6-PPQ.docx | DOCX document | |
| WIFT_Attachment_2-SGFP_Listing_Excel.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. CONTRACT LINE ITEM No.
B. EXHIBIT
C C. CATEGORY: TDP (X) TM ( ) Other ( ) Technical Data Package (TDP)
D. System/Item
WIFT: V-22 PSE
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
C001
2. Title of Data Item
SYSTEM HARDWARE PRODUCT DRAWINGS
3. SUBTITLE
Engineering Data
4. AUTHORITY (DATA ID NO.)
See Block 16
5. Contract Reference
SOW PARA. 3.2.1
6. Requiring Office
NAVAIR LKE Code 1327LO
7. DD 250 REQ
DD
9. Dist. Statement Req.
“D”
10. Frequency
(See Block 16)
12. Date of first submission
(See Block 16)
14. Distribution
SEE BLOCK 16
8. APPCODE
A (See Block 16)
11. As of Date
N/A
13. DATE OF SUBSEQUENT SUBMISSION
(See Block 1)
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
BLOCK 4: Authority (DI-SES-8100C, DI-SES-81001C, DI-SES-81002D, DI-SES-81003C, System Hardware Product Drawings (SHPD) shall be prepared in contractor format and delivered in an electronic form compatible with MS Office Professional 2010. For preferred NAVAIR Technical Drawing Requirements see NAVAIR Standard Work Package WP4800-001Rev A, Appendix A: NAVAIR Drawings Requirements for Aircraft Launch and Recovery Equipment (ALRE) enclosed at contract section J Attachment 7.
BLOCK 8: The government will have 14 days for review and acceptance/rejection of each submission. The contractor shall have 14 days to resubmit. The initial submission and all subsequent changes require approval of the contracting officer or designee. Class I and II changes affecting technical scope, physical or functional requirements in approved configuration documents or cost require approval prior to implementation.
BLOCK 10: System Hardware Product Drawings shall be submitted by the contractor to the government, for the following SETR reviews: PDR, CDR, and PRR.
- BLOCK 11: System Hardware Product Drawings delivered as part of SETR shall be delivered to the government NLT 30 days prior to the scheduled start of the SETR.
- BLOCK 12: First submissions of System Hardware Product Drawings shall take place at the PDR.
- BLOCK 13: (a). Production Acceptance Test Unit baseline System Hardware Product Drawings shall be submitted at the CDR.
(b). Final Production Acceptance Test (PAT) Unit System Hardware Product Drawings shall be delivered with the six PAT units.
(c). Final System Hardware Product Drawings shall be delivered with the first WIFT production Lot delivery.
BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provided to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
(4.8.6.7)
NAVAIR LKE
(4.8.1.3)
NAVAIR LKE
4.8.1.2
NAVAIR LKE
4.8.6.3
NAVAIR LKE
6.7.6.1
NAVAIR LKE
4.8.6.11
FRC East 4.5
G. Prepared By
Benjamin Yearwood
B. Yearwood, NAVAIR 4.8.6.7 H. Date
I. Approved By
William E. Deeley
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
DD FORM 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE PAGE ( 1 ) OF ( 1 )
16 July 2013
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
C C. Category:
TDP ( X ) TM ( ) Other ( )
D. System/Item
WIFT: V-22 PSE
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
C002
2. Title of Data Item
SYSTEM/SUBSYSTEM SOFTWARE SPECIFICATION (SSS)
3. Subtitle
Technical Data Package (TDP)
4. Authority (Data ID No.)
SEE BLOCK 16
5. Contract Reference
SOW PARA. 3.2.2.1
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
DD
9. Dist. Statement Required
“D”
10. Frequency
See Block 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| copies |
| Draft |
| Reg |
| Repro |
16. Remarks
BLOCK 4: Authority (DI-IPSC-81431). System Software Specification (SSS) shall be prepared in contractor format and delivered in an electronic form compatible with MS Office Professional 2010.
BLOCK 8: The government will have 10 days for review and acceptance/rejection of each submission. The contractor shall have 10 days to resubmit. Class I and II changes affecting technical scope, physical or functional requirements in approved configuration documents or cost require the approval prior to implementation.
BLOCK 10: Frequency of submission is 3TIMES - 3 separate instances consisting of a draft and final publication. Each submission shall correlate with and support the established program IMS schedule dates for PDR, CDR, and PRR SETR milestones.
- BLOCK 12: First submission (draft) of the SSS publication shall happen NLT 30 business Days before PDR. Submit final submission NLT 10 day after receipt of USG comments.
- BLOCK 13: Subsequent submission of SSS shall happen NLT 30 business Days before the established program IMS schedule dates for CDR and PRR SETR milestones.
BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
C C. Category: TDP ( X ) TM ( ) Other ( )
Technical Data Package (TDP)
D. System/Item
WIFT: V-22 PSE
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
C003
2. Title of Data Item
SYSTEM SOFTWARE DESIGN DETAILED DESCRIPTION (SSDDD)
3. Subtitle
N/A
4. Authority (Data ID No.)
SEE BLOCK 16
5. Contract Reference
SOW PARA. 3.2.2.2
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
DD
9. Dist. Statement Req.
“D”
10. Frequency
ONE/P, SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date N/A
13. Date of Subsequent Submission
R/ASR (SEE BLOCK 16)
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (DI-IPSC-81435A) System Software Detailed Design Description shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
BLOCK 8: The government will have 30 days for review and acceptance/rejection of each submission. The contractor shall have 30 days to resubmit. Class I and II changes affecting technical scope, physical or functional requirements in approved configuration documents or cost require the approval prior to implementation.
BLOCK 10: Frequency of submission is 1TIME – one time preliminary draft and revised final. Each submission shall support and happen 30 Days prior to schedule milestones for PDR, CDR SETR events and Performance Acceptance Test (PAT) Unit delivery.
- BLOCK 12: First submission of the SSDDD preliminary shall take place 30 Days prior to CDR; final 15 Day s after comments.
- BLOCK 13: Each subsequent submission shall entail revisions of the preceding preliminary submission.
(a). Second submission of a Production Acceptance Test Unit baseline SSDDD shall happen 30 Days prior to schedule milestones for CDR; final 15 Days after comments.
(b). Third submission of Production Acceptance Test Unit SSDDD shall happen 30 Days prior to schedule milestones for Production Acceptance Test Unit delivery; final 15 Days after comments.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provided to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3, 4.8.6.3 (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
C C. Category: TDP ( ) TM ( ) Other (XX)
Technical Data Package (TDP)
D. System/Item
WIFT: V-22 PSE
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
C004
2. Title of Data Item
REQUIREMENTS TRACEABILITY MATRIX (RTM)
3. Subtitle
N/A
4. Authority (Data ID No.)
N/A
5. Contract Reference
SOW PARA. 3.2.2.3
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
DD
9. Dist. Statement Req.
“D”
10. Frequency
ONE/P, SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repro |
16. Remarks
- BLOCK 4: Authority (N/A). Requirement Traceability Matrix shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010. Each RTM submittal shall be considered to be approved when the particular SETR is passed by the contractor (i.e. when the contractor fulfills all SETR exit criteria and the government declares the SETR to be passed by the contractor).
BLOCK 8: The government will have 10 days for review and acceptance/rejection of each submission. The contractor shall have 10 days to resubmit. Class I changes affecting technical scope, physical or functional requirements in approved configuration documents or cost require approval prior to implementation.
BLOCK 10: Frequency of submission is one time preliminary and revisions – one time preliminary and revisions. Each submission shall support and happen 30 Days prior to schedule milestones for PDR, CDR SETR events.
- BLOCK 12: First submission of the RTM preliminary shall take place 30 Days prior to PDR; final 10 Day s after comments.
- BLOCK 13: Each subsequent submission shall entail revisions of the preceding preliminary submission.
(a). Second submission of a RTM shall happen 30 Days prior to schedule milestones for CDR; final 15 Days after comments.
(b). Third submission of RTM shall happen 30 Days prior to schedule milestones for Production Acceptance Test Unit delivery; final 10 Days after comments.
- - BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
Administrative & Engineering Management Data
D. System/Item
V-22 PSE
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A001
2. Title of Data Item
MEETING AGENDA
3. Subtitle
N/A
4. Authority (Data ID No.)
SEE BLOCK 4
5. Contract Reference
SOW PARA. 3.3.3.1
6. Requiring Office
NAVAIR LKE CODE 1.3.2.7
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
ASREQ
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
11. As of Date
13. Date of Subsequent Submission
ASREQ, SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
BLOCK 4: Authority (DI-ADMIN-81249A). Meeting Agenda shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010. V-22 Support Equipment IPT Leader, NAVAIR code 1.3.2.7 shall approve all conference, review or meeting agenda.
BLOCK 8: The government will have 5 days for review and acceptance/rejection of each submission. The contractor shall have 5 days to resubmit.
BLOCK 10: Frequency of submission is as required. Submissions shall support and correlate with established program IMS schedules and milestones to include Post Award, SRR, TIM, PDR, CDR, TRR, and PRR reviews and meetings.
- BLOCK 12: First submission of the Meeting Agenda Review agenda happen with Post Award Review.
(a). SETR agenda shall be submitted NLT 15 days prior to the scheduled start of the SETR (b). Non SETR meeting agenda shall be submitted NLT 15 days prior to the scheduled event.
- BLOCK 13: Subsequent submission of Meeting Agenda will occur sequentially for the event identified in Block 10 according to the IMS.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government's electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
| 17. Price Group |
| 18. Estimated Total Price: |
G. Prepared By
Benjamin Yearwood
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A002
2. Title of Data Item
Meeting Minutes
3. Subtitle
N/A
4. Authority (Data ID No.)
SEE BLOCK 4
5. Contract Reference
SOW PARA. 3.3.3.1
6. Requiring Office
NAVAIR LKE CODE 1.3.2.7
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
ASREQ
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent Submission
ASREQ, SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (DI-ADMIN-81250A). Meeting Minutes shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
BLOCK 8: The government will have 5 days for review and acceptance/rejection of each submission. The contractor shall have 5 days to resubmit.
BLOCK 10: Frequency of submission is as required. Publication submissions shall correlate with established program IMS schedules and milestones to include Post Award, SRR, TIM, PDR, CDR, TRR, and PRR reviews and meetings.
- BLOCK 12: First publication of the Meeting Minutes shall happen with Post Award.
(a). SETR Meting Minutes shall be published NLT 15 business Days after the conference/review event.
(b). Non SETR Meeting Minutes shall be published NLT 5 business days after conference/review event.
- BLOCK 13: Subsequent submission of Meeting Minutes shall correlate with established program IMS schedules and occur NLT 15 businesses days prior to milestone dates for SRRs, TIMs, PDR, CDR, TRR, and PRR reviews and meetings.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item
B. Exhibit
C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A003
2. Title of Data Item
SETR REVIEW POWERPOINT PRESENTATIONS
3. Subtitle
Formal Review Data Package
4. Authority (Data ID No.)
N/A
5. Contract Reference
SOW PARA. 3.3.3.2
6. Requiring Office
NAVAIR LKE CODE 1.3.2.7
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
ASREQ
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
11. As of Date
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (N/A). Presentations Shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010. V-22 Support Equipment IPT Leader, NAVAIR code 1.3.2.7 shall approve all conference, review or meeting agenda.
- BLOCK 8: The government will have 6 business days for review and acceptance or rejection of each submission. The contractor shall have 6 business days to resubmit.
BLOCK 10: Frequency of submission is as required. Publication submissions shall correlate with established program IMS schedules and milestones to include Post Award, SRR, TIM, PDR, CDR, TRR, and PRR reviews and meetings. SETR Review PowerPoint Presentations shall be submitted for all SETR reviews (Post Award, SRR PDR, CDR, TRR, PRR, and TIMs).
- BLOCK 12: First publication of the SETR Presentation shall happen with Post Award. SETR Presentations shall be published NLT 15 business days before the conference/review event.
- BLOCK 13: Subsequent submission of PowerPoint Presentations shall correlate with established program IMS schedules and occur NLT 15 businesses days prior to milestone dates for SRRs, TIMs, PDR, CDR, TRR, and PRR reviews and meetings.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government's electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A004
2. Title of Data Item
PROGRAM MANAGEMENT PLAN(PMP)
3. Subtitle
N/A
4. Authority (Data ID No.)
DI-MISC-81650,
5. Contract Reference
SOW PARA. 3.3.3.3
6. Requiring Office
NAVAIR LKE CODE 1.3.2.7
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
SEMIA
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent
Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (N/A). Program Management Plan (PMP) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 30 days for review and acceptance/rejection of each submission. The contractor shall have 30 days to resubmit.
- BLOCK 10: Frequency of submission is semi-annually with revisions. Submissions of PMP publication shall correlate with established program IMS schedules and major milestones.
- BLOCK 12: First submission of the PMP publication shall happen 30 business Days prior to the scheduled start of the PDR SETR event.
- BLOCK 13: Subsequent submission of PMP publication shall happen 6 Months after USG acceptance of the first publication.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A005
2. Title of Data Item
INTEGRATED MASTER SCHEDULE (IMS)
3. Subtitle
N/A
4. Authority (Data ID No.)
N/A
5. Contract Reference
SOW PARA. 3.3.3.3
6. Requiring Office
NAVAIR LKE CODE 1.3.2.7
7. DD 250 REQ
DD
9. Dist. Statement Req.
“D”
10. Frequency
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
SEE BLOCK 16
11. As of Date
N/A
13. Date of Subsequent
Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (N/A) Integrated Master Schedule (IMS) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 15 days for review and acceptance/rejection of each submission. The contractor shall have 15 days to resubmit.
- BLOCK 10: Frequency of submission is semi-annually with revisions. Submissions of IMS publication shall correlate with established program IMS schedules and milestones.
- BLOCK 12: First submission of the IMS publication shall happen 30 business Days prior to the scheduled start of the PDR SETR event.
- BLOCK 13: Subsequent submission of IMS publication shall happen 6 Months after USG acceptance of the first publication.
BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A006
2. Title of Data Item
SYSTEM ENGINEERING & DESIGN ENGINEERING PLAN (SEP)
3. Subtitle
N/A
4. Authority (Data ID No.)
SEE BLOCK 16
5. Contract Reference
SOW PARA. 3.3.3.4 & 3.3.3.19
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
11. As of Date
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (DI-SESS-81785) System Engineering Plan (SEP) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 30 days for review and acceptance/rejection of each submission. The contractor shall have 30 days to resubmit.
- BLOCK 10: Frequency of SEPDEP submission is 3 TIME 3 separate submittals. Each submittal consists of a draft and final. Publication submissions shall correlate with established program IMS schedules and milestones.
- BLOCK 12: First submission of the SEPDEP publication by the contractor to the USG shall happen 45 business Days after contract.
- BLOCK 13: Subsequent submittals of the SEPDEP publication shall happen 30 business Days prior to the scheduled start of the SRR, PDR and CDR.
BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provide to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A007
2. Title of Data Item
TEST & EVALUATION MASTER PLAN (TEMP)
3. Subtitle
N/A
4. Authority (Data ID No.)
N/A
5. Contract Reference
SOW PARA. 3.3.3.5; 3.3.1.2.1; 3.3.1.3.1; 3.3.1.5.1
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (N/A) Test & Evaluation Master Plan (TEMP) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 30 days for review and acceptance/rejection of each submission. The contractor shall have 30 days to resubmit.
- BLOCK 10: Frequency of TEMP submission is 4 TIMES, 4 separate submittals. Each submittal consists of a draft and final. Publication submissions shall correlate with established program IMS schedules and milestones for PDR, CDR, TRRs, and VAL/VER.
- BLOCK 12: First submission of the TEMP publication by the contractor to the USG shall happen 30 business Days prior to the scheduled start of the PDR.
- BLOCK 13: Subsequent submittals of the TEMP publication shall happen 30 business Days prior to the scheduled start of the CDR, TRRs, and, VAL/VER.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provide to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
(1.3.2.7LO)
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A008
2. Title of Data Item
PROGRAM RISK MANAGEMENT PLAN (RMP)
3. Subtitle
N/A
4. Authority (Data ID No.)
DI-IPSC-81432A
5. Contract Reference
SOW PARA. 3.3.3.6 & 3.3.3.19, 3.3.1.2.1; 3.3.1.3.1; 3.3.1.5.1;
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
11. As of Date
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (DI-IPSC-81432A) Risk Management Plan (RMP) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 15 days for review and acceptance/rejection of each submission. The contractor shall have 15 days to resubmit.
- BLOCK 10: Frequency of submission RMP publication is 12TIME - 12 separate submittals. Submissions of RMR shall correlate with planned Monthly Risk Reviews and Major program milestones to include PDR, CDR.
- BLOCK 12: First submission of the RMP publication by the contractor to the USG shall happen 30 business Days after Post Award. First submittal consists of a draft and final incorporating Risk Management Report for that month as an annex.
- BLOCK 13: Subsequent submittals of the RMP publication shall happen 30 business Days after acceptance of the first submittal. Each subsequent RMP submittal will be in contractor Risk Management Report format encompassing risk identification matrix, tracking, and risk management strategy for each contractor or USG identified as medium and high risks levels.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provided to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A009
2. Title of Data Item
SYSTEM DESIGN THEORY CONCEPT OF OPERATION REPORT (DTCO)
3. Subtitle
N/A
4. Authority (Data ID No.)
DI-MISC-81608
5. Contract Reference
SOW PARA. 3.3.3.7; 3.3.1.2.1; 3.3.1.3.1
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (DI-MISC-81608) System Design Theory & Concept Of Operation (DTCO) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 30 days for review and acceptance/rejection of each submission. The contractor shall have 30 days to resubmit.
- BLOCK 10: Frequency of submission DTCO publication is 2TIME - 2 separate submittals. Submissions of DTCO shall correlate with program schedule dates for the PDR and CDR.
- BLOCK 12: First submission of the DTCO publication by the contractor to the USG shall happen 30 business Days prior to PDR. First submittal consists of a draft and final incorporating Risk Management Report for that month as an annex.
- BLOCK 13: Subsequent submittals of the DTCO publication shall happen 30 business Days prior CDR.
- BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address List for distribution emails and delivery addresses. (a). Contractor shall ensure that an electronic copy of the transmittal letter and the deliverable documents master copy will be deposited into the Government’s electronic storage drop box (V-22 Data MGMT) and notification of document drop shall be provided to: NAVAIR LKE (1.3.2.7LO). (b). Copies of transmittal letter, deliverable document signature page and electronic copy of the entire document shall be provided to NAVAIR LKE 4.8.1.3. (c). Copies of the transmittal letter only without attachment shall be provided to: NAVAIR LKE (1.3.2.7LO).
NAVAIR LKE
| Letter Only |
| 2 |
| V-22 Data MGMT |
| Letter |
| 1 |
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
NAVAIR LKE
FRC East 4.5
G. Prepared By
H. Date
I. Approved By
W. E. Deeley, NAVAIR 1.3.2.7 J. Date
22 Dec 2015
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPROVED OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM ( ) Other (X)
D. System/Item
E. Contract/PR No.
N68335-XX-X-XXXX
F. Contractor
TBD
1. Data Item No.
A010
2. Title of Data Item
HUMAN SY STEM INTERFACE (HSI) DESIGN REPORT
3. Subtitle
N/A
4. Authority (Data ID No.)
DI-MISC-81608
5. Contract Reference
SOW PARA. 3.3.3.8; 3.3.1.2.1; 3.3.1.3.1
6. Requiring Office
NAVAIR LKE Code 1327
7. DD 250 REQ
LT
9. Dist. Statement Req.
“D”
10. Frequency
SEE BLOCK 16
12. Date of first submission
SEE BLOCK 16
14. Distribution
SEE BLOCK 16
8. APPCODE
A
11. As of Date
N/A
13. Date of Subsequent Submission
SEE BLOCK 16
| Address |
| Draft |
| Reg |
| Repr |
16. Remarks
- BLOCK 4: Authority (DI-HFAC-80747B) Human System Interface (HSI) shall be prepared in contractor format. Submissions of this technical data shall be delivered in an electronic form compatible with MS Office Professional 2010.
- BLOCK 8: The government will have 15 days for review and acceptance/rejection of each submission. The contractor shall have 15 days to resubmit.
- BLOCK 8: The HSI shall be considered accepted following contractor receipt of US Government review comments, the adjudication of same comments jointly with the contractor and publication of a revised version incorporating agreed to changes the contractor. USG review comments are due 15 business Days after receipt from contractor.
- BLOCK 10: Frequency of submission HSI publication is 2TIME - 2 separate submittals. Submissions of HSI shall correlate with program schedule dates for the PDR and CDR.
- BLOCK 12: First submission of the HSI publication by the contractor to the USG shall happen 30 business Days prior to PDR.
- BLOCK 13: Subsequent submittals of the HSI publication shall happen 30 business Days prior to CDR.
BLOCK 14: For each address code cited, see Contract Attachment # CDRL Address…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .