PCPLT_SOW_CDRLs.doc

DOC document 2 MB Posted

Attached to
Drawings
Solicitation number
N68335-15-R-0135
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
3867AS109.pdf PDF
PCPLT_System_Spec_(SS).docx DOCX document
N68335-15-R-0135_Ammendment_0002.doc DOC document
PCPLT_SOW_CDRLs.docx DOCX document
PCPLT_SOW_V1_8.docx DOCX document
1353AS156rKs1.pdf PDF
5SE00363_30003_NULL_J_0001_J_NULL_0001_29_U_N_N_N.pdf PDF
1905AS300rAs1.pdf PDF
Dwg_3909AS9999_Identification_Plate_Tool_Cases.pdf PDF
Amendment_One.docx DOCX document
PCPLT_SOW_CDRLs_final.docx DOCX document
PCPLT_SOW_V1_7.docx DOCX document
N68335-15-R-0135.doc DOC document
PCPLT_System_Spec_(SS)_1_6.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Data Requirements List (CDRL) DD 1423

CDRL Matrix

Data Item
Post Award
SRR-II/PDR
CDR
CTR
SVR/PRR
IOC

DACA

DACA

DACA

DACA

DACA

DACA

Admin/ Technical

A001
Integrated Master Schedule
X
X
X
X
X
A002
Meeting/Review Agendas
X
X
X
X
X
A003
Meeting/Review Presentations
X
X
X
X
X
A004
Meeting/Review Minutes
X
X
X
X
X
A005
Meeting/Review Action Items
X
X
X
X
X
A006
Design Change Notice
AS REQ
AS REQ
A007
Physical Configuration Audit Plan

X

A008
Physical Configuration Audit Report

X

A009
Layout of Components

X

A010
Drawing Tree Structure/Top Down Breakdown
X
X

X

A011
Engineering Drawing Package
X
X
A012
Long Lead Items List for Pilot Production

X

A013
Requirements Traceability Matrix
X
X
X
X
A014
Systems Safety Hazard Analysis Report

X

A015
Hazardous Materials Management Program Plan

X

A016
Hazardous Materials Management Program Report

X

A017
Reliability Predictions Report

X

A018
Maintainability Predictions Report

X

Testing

T001
Master Test Plan

X

T002
Failure Reporting, Analysis, and Corrective Action System Plan

X

T003
Failure Reporting, Analysis and Corrective Action System Report

AS REQ

T004
Pilot Production Acceptance Test Procedures

X

T005
Pilot Production Acceptance Test Report

X

T006
Pilot Production Test I Procedures

X

T007
Pilot Production Test I Report

X

T008
Pilot Production Test II Procedures

X

T009
Pilot Production Test II Report

X

T010
High-Impact Shock Test Plan

X

T011
High-Impact Shock Test Report

X

T012
High-Impact Shock Test Mounting Fixture Drawings

X

T013
Maintainability Demonstration Test Plan

X

T014
Maintainability Demonstration Test Report

X

T015
Test Materials List

X

T016
On-Site Support Trip Report

AS REQ

T017
Production Acceptance Test Procedure

X

T018
Production Acceptance Test Report

X

Logistics

LB01
Task Execution Plan
X
LB02
Get Well Plan
AS REQ
AS REQ
AS REQ
AS REQ
AS REQ
LB03
System Allocation Document
X
X
X
X
X
LC01
Initial Calibration Procedure Source Data

X

X

LC02
Calibration and MeasurementRequirementsSummary Report
X

X

LC03
Initial Calibration of Production Units

X

LI01
Item Unique Identification Plan

X

LM01
Logistics Product Data Candidate List

X

LM02
Logistics Product Data Elements Input Data

X

LP01
Statement of Prior Submission

X

LP02
Supplemental Data for Provisioning

X

X

LS01
Long Lead Time Items List for Provisioning

X

LS02
Interim Support Items List
X
X
LT01
Technical Manual Content And Product Plan
X
LT02
Technical Manuals
X
X
X
X
LT03
XML Source File/MIL-PRF-28001 PDF

X

LT04
Contractor Validation Plan

X

LT05
Technical Manual Validation Certificates

X

LTR01
Course Conduct Information Package

X

LTR02
Training Course Outline

X

X

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______________ TM ____________ OTHER ______X_______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A001
Integrated Master Schedule
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See Block 16
SOW Para 3.2.1
NAVAIRLKE CODE: 1.3.1.8.1
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

LT

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Blocks 12 & 13: Submit 15 calendar days prior to each program meeting/review

Block 14: “E” means Electronic Copy

Submit as Microsoft Project 2010 and/or Adobe (.pdf) files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90 Previous editions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______________ TM ____________ OTHER ______X_______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A002
Meeting/Review Agendas
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See Block 16
SOW Para 3.3.1.1
NAVAIRLKE CODE: 1.3.1.8.1
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

LT

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Blocks 12 & 13: Submit 15 calendar days prior to each program meeting/review

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______________ TM ____________ OTHER ______X_______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A003
Meeting/Review Presentations
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See Block 16
SOW Para 3.3.1.1
NAVAIRLKE CODE: 1.3.1.8.1
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

LT

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Blocks 12 & 13: Submit 15 calendar days prior to each meeting/review & updated 5 calendar days after meeting/review

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______________ TM ____________ OTHER ______X_______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A004
Meeting/Review Minutes
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.3.1.2
NAVAIRLKE CODE: 1.3.1.8.1
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

LT

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Blocks 12 & 13: Submit within 15 calendar days after each meeting/review

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______________ TM ____________ OTHER ______X_______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A005
Meeting/Review Action Items
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.3.1.2
NAVAIRLKE CODE: 1.3.1.8.1
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

LT

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Blocks 12 & 13: Submit within 15 calendar days after each meeting/review

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ X ________ TM ____________ OTHER ______ _______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A006
Design Change Notice
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.1.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.

Block 12: DCN will be used to document design changes to the allocated baseline from the CTR until delivery of production hardware Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ X ________ TM ____________ OTHER ______ _______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A007
Physical Configuration Audit Plan
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.2
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Block 12: Submit 15 calendar days prior to SVR/PRR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ X ________ TM ____________ OTHER ______ _______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A008
Physical Configuration Audit Report
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.2
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Block 12: Submit 15 calendar days after audit completion

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ X ________ TM ____________ OTHER ______ _______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A009
Layout of Components
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.3
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

LT

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 12: Submit 15 calendar days prior to SRR-II/PDR

Block 14: “E” means Electronic Copy

Submit as Adobe (.pdf) files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______X________ TM ____________ OTHER ______________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A010
Drawing Tree Structure/Top Down Breakdown
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.4
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.

Blocks 12 & 13: Submit 15 calendar days prior to the SRR-II/PDR, CDR & SVR/PRR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______X________ TM ____________ OTHER ______________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A011
Engineering Drawing Package
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.5
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Format and content is provided in NAWCADLKE-DDR-486600-0004 Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10, 12 & 13: Submit drawing package representing the proposed pilot production units 15 calendar days prior to the CDR, submit complete drawings 15 days prior to CTR, update 15 days prior to SVR/PRR and Final drawings will be delivered 30 days after PCA (or with first production unit if PCA is not implemented)

Block 14: “E” means Electronic Copy

Submit as AutoCAD (.dwg) files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ X ________ TM ____________ OTHER ______ ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A012
Long Lead Items List for Pilot Production
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.4.6
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to the SRR-II/PDR for pilot production unit requirements.

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A013
Requirements Traceability Matrix
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 3.5
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

AS REQ
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

See Block 16
a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: The Matrix shall be a grid. Contractor format acceptable.

Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.

Blocks 10, 12 & 13: Submit 15 calendar days prior to each meeting/review

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER _______ X _______
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A014
System Safety Hazard Analysis Report
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-SAFT-80101B
SOW Para 3.6.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: DI-SAFT-80101B to be used as guidance, Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to CDR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A015
Hazardous Materials Management Program Plan
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81398C
SOW Para 3.7.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: NAS 411 used as guidance. Contractor format is acceptable. NAS 411 tailoring: Paragraphs 4.2.1, 4.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.2.7, 4.2.8 and 4.2.10 apply. Paragraphs 4.2.9 and 4.2.11 are not required.

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to CDR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A016
Hazardous Materials Management Program Report
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-81397C
SOW Para 3.7.2
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: NAS 411 used as guidance. Contractor format is acceptable. The report shall contain a data list that identifies all hazardous materials (HAZMAT) as defined in the specification. HAZMAT data shall include all information listed in paragraph 3.7.2 of the SOW. The Contractor shall obtain the required information from sub-contractors, vendors and suppliers. NAS 411 tailoring: Prohibited HAZMAT are identified as Restricted Chemicals per specification paragraph 3.3.11.4. Restricted HAZMAT are identified as Targeted Chemicals per specification paragraph 3.3.11.5. HAZMAT not identified as Restricted or Targeted in the specification are classified as Tracked HAZMAT IAW NAS 411 paragraph 2.2.13.

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to CDR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A017
Reliability Predictions Report
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

DI-RELI-81497

DI-RELI-81496

SOW Para 3.8.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: DI-RELI-81497 to be used as guidance for predictions report. DI-RELI-81496 to be used as guidance for block diagrams, Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to CDR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A018
Maintainability Predictions Report
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MNTY-81602
SOW Para 3.8.2
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: DI-MNTY-81602 to be used as guidance, Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to CDR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
T
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
T001
Master Test Plan
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 4.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to SRR-II/PDR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
T
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
T002
Failure Reporting, Analysis, and Corrective Action System Plan
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
See block 16
SOW Para 4.2
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
IPT Leader
0
1E
0

Block 4: MIL-HDBK-2155 and SAE JA1000-1 to be used as guidance, Contractor format acceptable

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 calendar days prior to CTR

Block 14: “E” means Electronic Copy

Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).

LSE
0
1E
0
Design Engineer
0
1E
0
Logistician
0
1E
0

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
4E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
T
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
T003
Failure Reporting, Analysis, and Corrective Action System Report
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .