Contract Data Requirements List (CDRL) DD 1423
CDRL Matrix
| Data Item |
| Post Award |
| SRR-II/PDR |
| CDR |
| CTR |
| SVR/PRR |
| IOC |
DACA
DACA
DACA
DACA
DACA
DACA
Admin/ Technical
| A001 |
| Integrated Master Schedule |
| X |
| X |
| X |
| X |
| X |
| A002 |
| Meeting/Review Agendas |
| X |
| X |
| X |
| X |
| X |
| A003 |
| Meeting/Review Presentations |
| X |
| X |
| X |
| X |
| X |
| A004 |
| Meeting/Review Minutes |
| X |
| X |
| X |
| X |
| X |
| A005 |
| Meeting/Review Action Items |
| X |
| X |
| X |
| X |
| X |
| A006 |
| Design Change Notice |
| A007 |
| Physical Configuration Audit Plan |
X
| A008 |
| Physical Configuration Audit Report |
X
| A009 |
| Layout of Components |
X
| A010 |
| Drawing Tree Structure/Top Down Breakdown |
X
| A011 |
| Engineering Drawing Package |
| A012 |
| Long Lead Items List for Pilot Production |
X
| A013 |
| Requirements Traceability Matrix |
| A014 |
| Systems Safety Hazard Analysis Report |
X
| A015 |
| Hazardous Materials Management Program Plan |
X
| A016 |
| Hazardous Materials Management Program Report |
X
| A017 |
| Reliability Predictions Report |
X
| A018 |
| Maintainability Predictions Report |
X
Testing
X
| T002 |
| Failure Reporting, Analysis, and Corrective Action System Plan |
X
| T003 |
| Failure Reporting, Analysis and Corrective Action System Report |
AS REQ
| T004 |
| Pilot Production Acceptance Test Procedures |
X
| T005 |
| Pilot Production Acceptance Test Report |
X
| T006 |
| Pilot Production Test I Procedures |
X
| T007 |
| Pilot Production Test I Report |
X
| T008 |
| Pilot Production Test II Procedures |
X
| T009 |
| Pilot Production Test II Report |
X
| T010 |
| High-Impact Shock Test Plan |
X
| T011 |
| High-Impact Shock Test Report |
X
| T012 |
| High-Impact Shock Test Mounting Fixture Drawings |
X
| T013 |
| Maintainability Demonstration Test Plan |
X
| T014 |
| Maintainability Demonstration Test Report |
X
X
| T016 |
| On-Site Support Trip Report |
AS REQ
| T017 |
| Production Acceptance Test Procedure |
X
| T018 |
| Production Acceptance Test Report |
X
Logistics
| LB01 |
| Task Execution Plan |
| X |
| LB02 |
| Get Well Plan |
| AS REQ |
| AS REQ |
| AS REQ |
| AS REQ |
| AS REQ |
| LB03 |
| System Allocation Document |
| X |
| X |
| X |
| X |
| X |
| LC01 |
| Initial Calibration Procedure Source Data |
X
X
| LC02 |
| Calibration and MeasurementRequirementsSummary Report |
| X |
X
| LC03 |
| Initial Calibration of Production Units |
X
| LI01 |
| Item Unique Identification Plan |
X
| LM01 |
| Logistics Product Data Candidate List |
X
| LM02 |
| Logistics Product Data Elements Input Data |
X
| LP01 |
| Statement of Prior Submission |
X
| LP02 |
| Supplemental Data for Provisioning |
X
X
| LS01 |
| Long Lead Time Items List for Provisioning |
X
| LS02 |
| Interim Support Items List |
| LT01 |
| Technical Manual Content And Product Plan |
| X |
| LT03 |
| XML Source File/MIL-PRF-28001 PDF |
X
| LT04 |
| Contractor Validation Plan |
X
| LT05 |
| Technical Manual Validation Certificates |
X
| LTR01 |
| Course Conduct Information Package |
X
| LTR02 |
| Training Course Outline |
X
X
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______________ TM ____________ OTHER ______X_______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A001 |
| Integrated Master Schedule |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See Block 16 |
| SOW Para 3.2.1 |
| NAVAIRLKE CODE: 1.3.1.8.1 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Blocks 12 & 13: Submit 15 calendar days prior to each program meeting/review
Block 14: “E” means Electronic Copy
Submit as Microsoft Project 2010 and/or Adobe (.pdf) files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90 Previous editions are obsolete
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______________ TM ____________ OTHER ______X_______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A002 |
| Meeting/Review Agendas |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See Block 16 |
| SOW Para 3.3.1.1 |
| NAVAIRLKE CODE: 1.3.1.8.1 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Blocks 12 & 13: Submit 15 calendar days prior to each program meeting/review
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______________ TM ____________ OTHER ______X_______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A003 |
| Meeting/Review Presentations |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See Block 16 |
| SOW Para 3.3.1.1 |
| NAVAIRLKE CODE: 1.3.1.8.1 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Blocks 12 & 13: Submit 15 calendar days prior to each meeting/review & updated 5 calendar days after meeting/review
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______________ TM ____________ OTHER ______X_______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A004 |
| Meeting/Review Minutes |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.3.1.2 |
| NAVAIRLKE CODE: 1.3.1.8.1 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Blocks 12 & 13: Submit within 15 calendar days after each meeting/review
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______________ TM ____________ OTHER ______X_______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A005 |
| Meeting/Review Action Items |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.3.1.2 |
| NAVAIRLKE CODE: 1.3.1.8.1 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Blocks 12 & 13: Submit within 15 calendar days after each meeting/review
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ X ________ TM ____________ OTHER ______ _______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A006 |
| Design Change Notice |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.1.1 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.
Block 12: DCN will be used to document design changes to the allocated baseline from the CTR until delivery of production hardware Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ X ________ TM ____________ OTHER ______ _______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A007 |
| Physical Configuration Audit Plan |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.2 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Block 12: Submit 15 calendar days prior to SVR/PRR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ X ________ TM ____________ OTHER ______ _______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A008 |
| Physical Configuration Audit Report |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.2 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Block 12: Submit 15 calendar days after audit completion
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ X ________ TM ____________ OTHER ______ _______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A009 |
| Layout of Components |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.3 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
LT
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 12: Submit 15 calendar days prior to SRR-II/PDR
Block 14: “E” means Electronic Copy
Submit as Adobe (.pdf) files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______X________ TM ____________ OTHER ______________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A010 |
| Drawing Tree Structure/Top Down Breakdown |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.4 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.
Blocks 12 & 13: Submit 15 calendar days prior to the SRR-II/PDR, CDR & SVR/PRR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
| Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733 |
| 15. TOTAL |
| 0 |
| 4E |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______X________ TM ____________ OTHER ______________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A011 |
| Engineering Drawing Package |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.5 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Format and content is provided in NAWCADLKE-DDR-486600-0004 Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10, 12 & 13: Submit drawing package representing the proposed pilot production units 15 calendar days prior to the CDR, submit complete drawings 15 days prior to CTR, update 15 days prior to SVR/PRR and Final drawings will be delivered 30 days after PCA (or with first production unit if PCA is not implemented)
Block 14: “E” means Electronic Copy
Submit as AutoCAD (.dwg) files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ X ________ TM ____________ OTHER ______ ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A012 |
| Long Lead Items List for Pilot Production |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.4.6 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to the SRR-II/PDR for pilot production unit requirements.
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A013 |
| Requirements Traceability Matrix |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 3.5 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| See Block 16 |
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: The Matrix shall be a grid. Contractor format acceptable.
Block 8: Allow 15 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 5 calendar days after receipt of Government comments.
Blocks 10, 12 & 13: Submit 15 calendar days prior to each meeting/review
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ ________ TM ____________ OTHER _______ X _______ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A014 |
| System Safety Hazard Analysis Report |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-SAFT-80101B |
| SOW Para 3.6.1 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: DI-SAFT-80101B to be used as guidance, Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to CDR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A015 |
| Hazardous Materials Management Program Plan |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-81398C |
| SOW Para 3.7.1 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: NAS 411 used as guidance. Contractor format is acceptable. NAS 411 tailoring: Paragraphs 4.2.1, 4.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.2.7, 4.2.8 and 4.2.10 apply. Paragraphs 4.2.9 and 4.2.11 are not required.
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to CDR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A016 |
| Hazardous Materials Management Program Report |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-81397C |
| SOW Para 3.7.2 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: NAS 411 used as guidance. Contractor format is acceptable. The report shall contain a data list that identifies all hazardous materials (HAZMAT) as defined in the specification. HAZMAT data shall include all information listed in paragraph 3.7.2 of the SOW. The Contractor shall obtain the required information from sub-contractors, vendors and suppliers. NAS 411 tailoring: Prohibited HAZMAT are identified as Restricted Chemicals per specification paragraph 3.3.11.4. Restricted HAZMAT are identified as Targeted Chemicals per specification paragraph 3.3.11.5. HAZMAT not identified as Restricted or Targeted in the specification are classified as Tracked HAZMAT IAW NAS 411 paragraph 2.2.13.
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to CDR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A017 |
| Reliability Predictions Report |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
DI-RELI-81497
DI-RELI-81496
| SOW Para 3.8.1 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: DI-RELI-81497 to be used as guidance for predictions report. DI-RELI-81496 to be used as guidance for block diagrams, Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to CDR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| A |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A018 |
| Maintainability Predictions Report |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MNTY-81602 |
| SOW Para 3.8.2 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: DI-MNTY-81602 to be used as guidance, Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to CDR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| T |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 4.1 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to SRR-II/PDR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| T |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| T002 |
| Failure Reporting, Analysis, and Corrective Action System Plan |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| See block 16 |
| SOW Para 4.2 |
| NAVAIRLKE CODE: 4.8.6.10 |
| 7. D0 250 REQ. |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. |
DISTRIBUTION
DD
b. COPIES
| 8. APP CODE |
| A |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
Final
A
| a. ADDRESSEE |
| Draft |
| Reg |
| Repro |
| 16. REMARKS |
| IPT Leader |
| 0 |
| 1E |
| 0 |
Block 4: MIL-HDBK-2155 and SAE JA1000-1 to be used as guidance, Contractor format acceptable
Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.
Blocks 10 & 12: Submit 15 calendar days prior to CTR
Block 14: “E” means Electronic Copy
Submit as Microsoft Office 2010 files See CDRL Matrix for submission timeframe (DACA).
DESTINATION OF DELIVERABLES
Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Asif Yeahia |
| 04 Aug 2014 |
| William Smykowski |
| 26 Feb 2015 |
DD Form 1423-2 Sep 90
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY |
| 00XX |
| T |
| TDP ______ ________ TM ____________ OTHER ______ X ________ |
| D. SYSTEM/ITEM |
| E. CONTRACT / PR NO. |
| F. CONTRACTOR |
| Pneumatic Cabin Pressure Leakage Tester |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| T003 |
| Failure Reporting, Analysis, and Corrective Action System Report |
| 4. AUTHORITY (Data Item Documentation No.) |
| 5. CONTRACT REFERENCE |