N68335-15-R-0135_Ammendment_0002.doc

DOC document 252 KB Posted

Attached to
Drawings
Solicitation number
N68335-15-R-0135
Issued by

About this file

Ammendment 0002

View the file

Other files

File Type Posted
3867AS109.pdf PDF
PCPLT_System_Spec_(SS).docx DOCX document
PCPLT_SOW_CDRLs.docx DOCX document
PCPLT_SOW_V1_8.docx DOCX document
1353AS156rKs1.pdf PDF
5SE00363_30003_NULL_J_0001_J_NULL_0001_29_U_N_N_N.pdf PDF
1905AS300rAs1.pdf PDF
Dwg_3909AS9999_Identification_Plate_Tool_Cases.pdf PDF
Amendment_One.docx DOCX document
PCPLT_SOW_CDRLs_final.docx DOCX document
PCPLT_SOW_V1_7.docx DOCX document
N68335-15-R-0135.doc DOC document
PCPLT_System_Spec_(SS)_1_6.pdf PDF
PCPLT_SOW_CDRLs.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N68335-15-R-0135

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMMEND 0002

The purpose of this ammendment is to:

1. Clarify Pre-production unit requirements and hereby incorporate a revised Statement of Work into Section J.

2. Hereby incorporate a revised Performance Specification into section J.

3. The summary of changes is as follows:

Statement of Work

The Statement of Work, page 19, paragraph 4.3 has changed from:

The Contractor shall produce a maximum of four PPUs for use during PPT and the PPUs shall be calibrated by the Contractor prior to PPT I. Additionally, any follow-on calibration required during the testing phase PPAT, PPT I, PPT II, Independent Government Testing, and PAT shall also be performed by the Contractor. All PPUs shall undergo all PPT I which encompasses PPAT. A number of PPUs specified by the Government will be shipped to Naval Air Warfare Center Aircraft Division, 22763 Saufley Rd, Building 1405, Patuxent River, MD 20670, 360 DACA for Independent Government Testing while PPT II is ongoing. The Contractor is required to complete CTR prior to shipment of these units. These PCPLTs, along with the technical data package, will represent the intended Final Product Baseline and will serve as models to which all production PCPLTs will be built. Upon completion of testing the Contractor shall refurbish the PPUs to production level standards.

To:

The Contractor shall produce a maximum of five PPUs for use during PPT and the PPUs shall be calibrated by the Contractor prior to PPT I. Additionally, any follow-on calibration required during the testing phase PPAT, PPT I, PPT II, Independent Government Testing, and PAT shall also be performed by the Contractor. All PPUs shall undergo all PPT I which encompasses PPAT. A number of PPUs specified by the Government will be shipped to Naval Air Warfare Center Aircraft Division, 22763 Saufley Rd, Building 1405, Patuxent River, MD 20670, 360 DACA for Independent Government Testing while PPT II is ongoing. The Contractor is required to complete CTR prior to shipment of these units. These PCPLTs, along with the technical data package, will represent the intended Final Product Baseline and will serve as models to which all production PCPLTs will be built. Upon completion of testing the Contractor shall refurbish the PPUs to production level standards.

The Statement of Work, page 9, paragraph 3.3.3 has changed from:

Entrance Criteria

· Meeting/Review Agendas (CDRL A002)

· Meeting/Review Presentations (CDRL A003)

· Submittal of updated Drawing Tree/Top Down Breakdown (CDRL A010)

· Submittal of an Engineering Drawing Package (CDRL A011)

· Submittal of Requirements Traceability Matrix (A013)

· Submittal of the System Safety Hazard Analysis Report (CDRL A014)

· Submittal of the HMMP Report (CDRL A016)

· Submittal of the Reliability Prediction Report (CDRL A017)

· Submittal of the Maintainability Predictions Report (CDRL A018)

· Submittal of the Master Test Plan (CDRL T001)

· Submittal of the Pilot Production Acceptance Test Procedures (CDRL T004)

· Submittal of the Pilot Production Test (PPT) I Procedures (CDRL T006)

· Submittal of the Shock Test Plan (CDRL T010)

· Submittal of the SAD (CDRL LB03)

· Submittal of the CMRS Report (CDRL LC02)

· Submittal of the Statement of Prior Submission (SPS) (CDRL LP01)

· Submittal of the Supplemental Data for Provisioning (SDFP) (CDRL LP02)

· Submittal of the Long Lead Time Items List (LLTIL) for Production (CDRL LS01)

· Submittal of TM for Second Review (CDRL LT02)

To:

Entrance Criteria

· Meeting/Review Agendas (CDRL A002)

· Meeting/Review Presentations (CDRL A003)

· Submittal of updated Drawing Tree/Top Down Breakdown (CDRL A010)

· Submittal of an Engineering Drawing Package (CDRL A011)

· Submittal of Requirements Traceability Matrix (A013)

· Submittal of 3-D Models (CDRL A019)

· Submittal of the System Safety Hazard Analysis Report (CDRL A014)

· Submittal of the HMMP Report (CDRL A016)

· Submittal of the Reliability Prediction Report (CDRL A017)

· Submittal of the Maintainability Predictions Report (CDRL A018)

· Submittal of the Master Test Plan (CDRL T001)

· Submittal of the Pilot Production Acceptance Test Procedures (CDRL T004)

· Submittal of the Pilot Production Test (PPT) I Procedures (CDRL T006)

· Submittal of the Shock Test Plan (CDRL T010)

· Submittal of the SAD (CDRL LB03)

· Submittal of the CMRS Report (CDRL LC02)

· Submittal of the Statement of Prior Submission (SPS) (CDRL LP01)

· Submittal of the Supplemental Data for Provisioning (SDFP) (CDRL LP02)

· Submittal of the Long Lead Time Items List (LLTIL) for Production (CDRL LS01)

· Submittal of TM for Second Review (CDRL LT02)

The Statement of Work, page 10, paragraph 3.3.4 has changed from:

Entrance Criteria

· Meeting/Review Agendas (CDRL A002)

· Meeting/Review Presentations (CDRL A003)

· Presentation shall include a detailed discussion of any changes to the initial product baseline that was established at the CDR.

· Submittal of updated Engineering Drawing Package (CDRL A011)

· Submittal of updated requirements traceability matrix (CDRL A013)

· Approved Failure Reporting, Analysis, and Corrective Action System Plan (CDRL T002)

· Approved Pilot Production Acceptance Test Report (CDRL T005)

· Approved PPT I Report (CDRL T007)

· Approved PPT II Procedures (CDRL T008)

· Approved Maintainability Demonstration (MDEMO) Test Plan (CDRL T013)

· Submittal of the Test Materials List (CDRL T015)

· All required test resources (people, facilities, test articles, test instrumentation) are identified and are available for testing

· Submittal of the SAD (CDRL LB03)

· Submittal of the Preliminary Interim Support Items List (ISIL) (LS02)

· Submittal of TM for Third Review (CDRL LT02)

· Submittal of Training Materials (CDRLs LTR01 & LTR02)

To:

Entrance Criteria

· Meeting/Review Agendas (CDRL A002)

· Meeting/Review Presentations (CDRL A003)

· Presentation shall include a detailed discussion of any changes to the initial product baseline that was established at the CDR.

· Submittal of updated Engineering Drawing Package (CDRL A011)

· Submittal of updated requirements traceability matrix (CDRL A013)

· Submittal of updated 3-D Models (A019)

· Approved Failure Reporting, Analysis, and Corrective Action System Plan (CDRL T002)

· Approved Pilot Production Acceptance Test Report (CDRL T005)

· Approved PPT I Report (CDRL T007)

· Approved PPT II Procedures (CDRL T008)

· Approved Maintainability Demonstration (MDEMO) Test Plan (CDRL T013)

· Submittal of the Test Materials List (CDRL T015)

· All required test resources (people, facilities, test articles, test instrumentation) are identified and are available for testing

· Submittal of the SAD (CDRL LB03)

· Submittal of the Preliminary Interim Support Items List (ISIL) (LS02)

· Submittal of TM for Third Review (CDRL LT02)

· Submittal of Training Materials (CDRLs LTR01 & LTR02)

Statement of Work

The Statement of Work, page 11, paragraph 3.3.5 has changed from:

Entrance Criteria

· Meeting/Review Agendas (CDRL A002)

· Meeting/Review Presentations (CDRL A003)

· Submittal of Physical Configuration Audit Plan (CDRL A007)

· Submittal of an updated Drawing Tree (CDRL A010)

· Approved Pilot Production Test II Report (CDRL T009)

· Submittal of the Shock Test Report (CDRL T011)

· Submittal of the MDEMO Test Report (CDRL T014)

· Submittal of the Production Acceptance Test Procedures (CDRL T017)

· Submittal of the SAD (CDRL LB03)

· Submittal of the Final ICP Source Data (CDRL LC01)

· Submittal of the SDFP (CDRL LP02)

· Submittal of the Final ISIL (LS02)

· Submittal of an updated complete TM (CDRL LT02)

· Submittal of the Contractor Validation Plan (CDRL LT04) To:

Entrance Criteria

· Meeting/Review Agendas (CDRL A002)

· Meeting/Review Presentations (CDRL A003)

· Submittal of Physical Configuration Audit Plan (CDRL A007)

· Submittal of an updated Drawing Tree (CDRL A010)

· Submittal of updated Engineering Drawing Package (CDRL A011)

· Submittal of updated 3-D Models (A019)

· Approved Pilot Production Test II Report (CDRL T009)

· Submittal of the Shock Test Report (CDRL T011)

· Submittal of the MDEMO Test Report (CDRL T014)

· Submittal of the Production Acceptance Test Procedures (CDRL T017)

· Submittal of the SAD (CDRL LB03)

· Submittal of the Final ICP Source Data (CDRL LC01)

· Submittal of the SDFP (CDRL LP02)

· Submittal of the Final ISIL (LS02)

· Submittal of an updated complete TM (CDRL LT02)

· Submittal of the Contractor Validation Plan (CDRL LT04) PCPLT System Specification

The Spec, page 2, paragraph 2.2 has changed from:

Drawings

NAVAIR 1353AS156
Coating Procedure
NAVAIR 1905AS300
Coating Procedure, Powder Coating, White
NAVAIR 3909AS9999
Identification Plate
NAWCAD 5SE00363
Modification Plate

To:

Drawings

NAVAIR 1353AS156
Coating Procedure
NAVAIR 1905AS300
Coating Procedure, Powder Coating, White
NAVAIR 3909AS9999
Identification Plate
NAWCAD 5SE00363
Modification Plate
NAVAIR 3867AS109
Ship Air Adapter

The Spec, page 8, Table 1 has changed from:

Table 1 - Accessories

Nomenclature
Description
1-1/4” Adapter
Used to adapt hose to aircraft. Cabin Air Supply Hose to UNF-2B 1-1/4-12 thread.
2-3/8” Adapter
Used to adapt hose to aircraft. Cabin Air Supply Hose toUN-2B 2-3/8-12 thread.
Adapter, Ship Air
Used to adapt supply hose to shipboard facility compressed air source, Use drawing DWG3867AS109-
Adapter, Facility
Used to adapt supply hose to 1" NPT facility air source.
Wrenches
Service Wrenches of spans greater than 1" to connect/disconnect tester's hoses
Adapter
-10 F JIC swivel fitting (fits F-35 aircraft -10 M JIC test port) to supply hose
Adapter
-6 M JIC to -4 F JIC swivel
Adapter
-6 M JIC to -3 F JIC swivel
Gaskets, Replaceable
For 1 ¼ and 2 3/8 adapters

Table 2 - Accessories

Nomenclature
Description
1-1/4” Adapter
Used to adapt hose to aircraft. Cabin Air Supply Hose to UNF-2B 1-1/4-12 thread.
2-3/8” Adapter
Used to adapt hose to aircraft. Cabin Air Supply Hose to UN-2B 2-3/8-12 thread.
Adapter, Ship Air
Used to adapt supply hose to shipboard facility compressed air source, Use drawing DWG3867AS109-
Adapter, Facility
Used to adapt supply hose to 1" NPT facility air source.
Wrenches
Service Wrenches of spans greater than 1" to connect/disconnect tester's hoses and adapters
Adapter
-10 F JIC swivel fitting (fits F-35 aircraft -10 M JIC test port) to supply hose
Adapter
-4 M JIC to -6 F JIC swivel
Adapter
-4 M JIC to -3 F JIC swivel
Gaskets, Replaceable
For 1 ¼ and 2 3/8 adapters

CDRL Matrix page 1 has changed from:

Data Item
Post Award
SRR-II/PDR
CDR
CTR
SVR/PRR
IOC

DACA

DACA

DACA

DACA

DACA

Admin/ Technical

A001
Integrated Master Schedule
X
X
X
X
X
A002
Meeting/Review Agendas
X
X
X
X
X
A003
Meeting/Review Presentations
X
X
X
X
X
A004
Meeting/Review Minutes
X
X
X
X
X
A005
Meeting/Review Action Items
X
X
X
X
X
A006
Design Change Notice
AS REQ
AS REQ
A007
Physical Configuration Audit Plan

X

A008
Physical Configuration Audit Report

X

A009
Layout of Components

X

A010
Drawing Tree Structure/Top Down Breakdown
X
X

X

A011
Engineering Drawing Package
X
X
A012
Long Lead Items List for Pilot Production

X

A013
Requirements Traceability Matrix
X
X
X
X
A014
Systems Safety Hazard Analysis Report

X

A015
Hazardous Materials Management Program Plan

X

A016
Hazardous Materials Management Program Report

X

A017
Reliability Predictions Report

X

A018
Maintainability Predictions Report

X

A019
3-D Models

X

Testing

T001
Master Test Plan

X

T002
Failure Reporting, Analysis, and Corrective Action System Plan

X

T003
Failure Reporting, Analysis and Corrective Action System Report

AS REQ

T004
Pilot Production Acceptance Test Procedures

X

T005
Pilot Production Acceptance Test Report

X

T006
Pilot Production Test I Procedures

X

T007
Pilot Production Test I Report

X

T008
Pilot Production Test II Procedures

X

Data Item
Post Award
SRR-II/PDR
CDR
CTR
SVR/PRR
IOC

DACA

DACA

DACA

DACA

Admin/ Technical

A001
Integrated Master Schedule
X
X
X
X
X
A002
Meeting/Review Agendas
X
X
X
X
X
A003
Meeting/Review Presentations
X
X
X
X
X
A004
Meeting/Review Minutes
X
X
X
X
X
A005
Meeting/Review Action Items
X
X
X
X
X
A006
Design Change Notice
AS REQ
AS REQ
A007
Physical Configuration Audit Plan

X

A008
Physical Configuration Audit Report

X

A009
Layout of Components

X

A010
Drawing Tree Structure/Top Down Breakdown
X
X

X

A011
Engineering Drawing Package
X
X
X
A012
Long Lead Items List for Pilot Production

X

A013
Requirements Traceability Matrix
X
X
X
X
A014
Systems Safety Hazard Analysis Report

X

A015
Hazardous Materials Management Program Plan

X

A016
Hazardous Materials Management Program Report

X

A017
Reliability Predictions Report

X

A018
Maintainability Predictions Report

X

A019
3-D Models
X
X
X

Testing

T001
Master Test Plan

X

T002
Failure Reporting, Analysis, and Corrective Action System Plan

X

T003
Failure Reporting, Analysis and Corrective Action System Report

AS REQ

T004
Pilot Production Acceptance Test Procedures

X

T005
Pilot Production Acceptance Test Report

X

T006
Pilot Production Test I Procedures

X

T007
Pilot Production Test I Report

X

T008
Pilot Production Test II Procedures

X

T009
Pilot Production Test II Report

X

T010
High-Impact Shock Test Plan

X

T011
High-Impact Shock Test Report

X

T012
High-Impact Shock Test Mounting Fixture Drawings

X

T013
Maintainability Demonstration Test Plan

X

T014
Maintainability Demonstration Test Report

X

T015
Test Materials List

X

T016
On-Site Support Trip Report

AS REQ

T017
Production Acceptance Test Procedure

X

T018
Production Acceptance Test Report

X

Logistics

LB01
Task Execution Plan
X
LB02
Get Well Plan
AS REQ
AS REQ
AS REQ
AS REQ
AS REQ
LB03
System Allocation Document
X
X
X
X
X
LC01
Initial Calibration Procedure Source Data

X

X

LC02
Calibration and Measurement Requirements Summary Report
X

X

LC03
Initial Calibration of Production Units

X

LI01
Item Unique Identification Plan

X

LM01
Logistics Product Data Candidate List

X

LM02
Logistics Product Data Elements Input Data

X

LP01
Statement of Prior Submission

X

LP02
Supplemental Data for Provisioning

X

X

LS01
Long Lead Time Items List for Provisioning

X

LS02
Interim Support Items List
X
X
LT01
Technical Manual Content And Product Plan
X
LT02
Technical Manuals
X
X
X
X
LT03
XML Source File/MIL-PRF-28001 PDF

X

LT04
Contractor Validation Plan

X

LT05
Technical Manual Validation Certificates

X

LTR01
Course Conduct Information Package

X

LTR02
Training Course Outline

X

X

PCPLT CDRL A019 has changed from:

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A019
3-D Models
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ILSS-80454
SOW Para 3.4.5.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
NAVAIRLKE
0
2E
0

Block 7: Final submittal DD250 (DD)

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10 & 12: Submit 15 days prior to CTR

Block 14: “E” means Electronic Copy

Submit as .iges file type

See CDRL Matrix for submission timeframe (DACA).

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
2E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90 Previous editions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
00XX
A
TDP ______ ________ TM ____________ OTHER ______ X ________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
Pneumatic Cabin Pressure Leakage Tester
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A019
3-D Models
4. AUTHORITY (Data Item Documentation No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ILSS-80454
SOW Para 3.4.5.1
NAVAIRLKE CODE: 4.8.6.10
7. D0 250 REQ.
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.

DISTRIBUTION

DD

ONE/R
See Block 16

b. COPIES

8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION

Final

A

a. ADDRESSEE
Draft
Reg
Repro
16. REMARKS
NAVAIRLKE
0
2E
0

Block 7: Final submittal DD250 (DD)

Block 8: Allow 30 calendar days for Government approval/disapproval. Revisions, if required, shall be submitted no later than 15 calendar days after receipt of Government comments.

Blocks 10, 12 & 13: Submit drawing package representing the proposed pilot production units 15 calendar days prior to the CDR, submit complete drawings 15 days prior to CTR, update 15 days prior to SVR/PRR and Final drawings will be delivered 30 days after PCA (or with first production unit if PCA is not implemented)

Block 14: “E” means Electronic Copy

Submit as .step file type

See CDRL Matrix for submission timeframe (DACA).

DESTINATION OF DELIVERABLES

Naval Air Warfare Center Aircraft Division, Route 547, Lakehurst, NJ 08733

15. TOTAL
0
2E
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Asif Yeahia
04 Aug 2014
William Smykowski
26 Feb 2015

DD Form 1423-2 Sep 90 Previous editions are obsolete

4. All other terms and conditions remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

DOCUMENT TYPE

DESCRIPTION

PAGES

DATE

Exhibit A, T

Contract Data Requirements List

26 February 2015

Exhibit L

ILS Contract Data Requirements List 26 February 2015

Attachment 1

Pneumatic Cabin Pressure Leakage Tester

Performance Specification

49 30 October 2015

Attachment 2

Pneumatic Cabin Pressure Leakage Tester

Engineering Statement of Work

30 October 2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .