MHU-191A/M Munitions Transporter Wheels Brake Cables Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-14-R-0123-0002.doc | DOC document | |
| N68335-14-R-0123-0001.doc | DOC document | |
| Exhibit_A_CDRLs_-_191_Wheel_and_Brake_Cable_-_16_June_2014.pdf | ||
| N68335-14-R-0123_MHU-191AM_wheels_and_brake_cables_SF33.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 SOW MHU-191A/M WHEELS & BRAKE CABLES 6/16/2014
Statement of Work
Manufacture and Delivery of
MHU-191A/M MUNITIONS TRANSPORTER WHEELS AND BRAKE CABLES
16 June 2014
1.0 Introduction
1.1 Purpose:
This statement of work defines and describes the requirements for the contractor to provide the wheel and brake cable components for the MHU-191A/M Munitions Transporter in accordance with the Government furnished technical drawings listed in Appendix A. In addition to the fabrication of Part Numbers (P/N) 3992AS111-1, 3992AS350-1 and 3992AS350-2, the contractor shall perform inspection in accordance with ISO 9001 or equivalent. The contractor shall manufacture, inspect, and deliver parts over the life of the contract as defined in Section B of the solicitation.
1.2 Background:
The MHU-191 Munitions Transporter is used both on land and aboard ships by the Navy and Marine Corps to transport various weapons, stores, and equipment through the use of adapters that pin to the rails of the MHU-191 Munitions Transporter. The parts associated with this Statement of Work are component parts used to convert the MHU-191/M to the MHU-191A/M Munitions Transporter.
2.0 Scope:
This acquisition is structured for the contractor to manufacture, test, and inspect the wheel and brake cable components. Prior to full rate production, the contractor shall produce two pilot production units, consisting of each part listed in Appendix A. Upon satisfactory completion of all pilot production inspection and testing, the Government will provide a release for production for units awarded through the life of the contract.
3.0 Task Requirements:
3.1. Program schedule: Within 30 days after contract award, a program schedule will be delivered in accordance with CDRL A001. The program schedule will outline all steps in the manufacturing, testing, inspection, and delivery of the MHU-191A/M Munitions Transporter components.
3.2 Acceptance Test Plan: Within 60 days after contract award, an acceptance test plan shall be provided in accordance with CDRL A002. The acceptance test plan shall include all drawing and/or specification requirements for P/Ns 3992AS111-1, 3992AS350-1 and 3992AS350-2. The plan shall describe each of the tests/inspections methods and equipment that will be needed to demonstrate that the pilot production units meet all of the performance requirements outlined in technical drawings 3992AS111 and 3992AS350. The acceptance test plan shall include all data/certification sheets and methods/procedures to perform the inspections and functional tests. The plan shall also list all equipment and measurement tools (with calibration certifications as required) that will be used during testing.
3.3 Pilot Production Units: Two Pilot Production Units, consisting of the parts and quantities indicated in Appendix A, shall be inspected and tested in accordance with the drawings.
Inspection and testing shall commence no later than 300 days after the contract has been awarded for a duration of 45 days. One hundred percent (100%) inspection and testing in accordance with the drawings shall be completed by the contractor in accordance with CDRL A002. The approved pilot production units shall be tendered for delivery with the last shipment of the first Delivery Order (DO) under this contract. The contractor shall refurbish the pilot production units to the production configuration as necessary to place it in ready for issue (RFI) condition.
3.3.1 Pilot Production Unit Test Report: Within 30 days after the completion of all test and inspections, a test report shall be delivered in accordance with CDRL A003. The test report shall document the results of all inspection and testing. If any failures occurred during the testing, the contractor shall provide a detailed description of the failure, steps taken to correct it, and recommendations to correct the underlying cause of the failure.
3.4 Full Rate Production (FRP): After the approval of the Pilot Production Unit, Release for Production will be provided in writing by the Contracting Officer to authorize the contractor to begin the production/purchase of parts under contract. Prior to Release for Production, all purchase of materials and manufacturing shall be at the contractor’s expense and risk.
Within 210 days of the release for FRP, the contractor shall begin delivery of the production parts and will continue to do so at a rate that is in accordance with Section F of the contract.
3.4.1 Production Progress Report: The contractor shall submit monthly Production Progress Reports accordance with CDRL A009.
3.4.2 Production Inspection: Inspection and testing of production units will be performed by the contractor in accordance with CDRL A002. Inspection will be performed at a rate of:
- One (1) Brake Cable (3992AS111-1) out of every one hundred (100) cable assemblies.
- One set (2 Front, 2 Rear) out of every two hundred (200) total wheels assemblies.
Failure/non-compliance of a unit shall result in one hundred percent (100%) inspection and testing of the next 50 units or remainder of the DO, whichever comes first. If any damage occurs during the production inspection and testing process, production units that pass inspection and testing shall be refurbished to the production configuration as necessary to place them in ready for issue (RFI) condition and then tendered for delivery.
Production Inspection Reports shall be delivered in accordance with CDRL A004 within 15 days after inspection and testing.
3.5 Systems Engineering
3.5.1 Product Configuration Identification: The current approved technical documentation for the Configuration Items (CI) is set forth in the specifications, drawings, and associated documents referenced therein.
3.5.2 Configuration Control: The contractor shall submit Class I and Class II Engineering Change Proposals (ECPs), and all minor, major, and critical Requests for Deviation/Waiver (CDRLs A005, A006, and A007, respectively).
3.5.3 Quality Assurance Program: The contractor shall establish and maintain a quality system that adheres to the requirement of ISO 9001 or equivalent and all FAR clauses within the contract.
3.5.3.1 Responsibility for Inspection: The contractor is responsible for the performance of all inspection requirements. The contractor may use his own or any other facilities acceptable to the Government and suitable for the performance of the inspection specified.
The Government reserves the right to perform or witness any or all of the inspections.
3.6 Support of Technical Interchange Meetings: The Government intends to conduct at least two technical interchange meetings prior to the manufacturing/purchasing of the Full Rate Production parts. The first will be the post award meeting occurring on or about 30 days after contract award and will be held via site visit or phone con. The purpose of the meeting will be to review the program schedule and technical drawings/parts specification to address any questions and concerns on the performance of the contract. The second meeting will be held after inspection of Pilot Production parts to address any issues or concerns with the producibility or purchasing of the parts. The contractor will be responsible for hosting the meeting (approximately 5 government attendees), preparing any review material and for recording and delivering the minutes of the meetings in accordance with
CDRL A008.
3.7 Packing, Handling, Storage, and Transportation: Packaging, preservations, and shipping shall be in accordance with the best commercial practices available and shall provide protection from normal climatic/weather conditions and incidental mishandling during shipping. The items shall be shipped “FOB Destination.”
3.8 Data Delivery: The contractor shall deliver all Contract Data Requirement Documents in electronic format unless otherwise specified in the CDRL. The documents shall be developed using commercially available software. Microsoft Word is the preferred word processing software.
Appendix A MHU-191A/M Munitions Transporter Wheel and Brake Cable Parts
A. Manufacture Parts
Part Number Description NSN Technical Drawing or
Specification
Source of
Supply
QTY
required per
MHU-191A/M
Munitions
Transporter
64A114B90-1 Hub Cap 2530-00-839-8739 64A114B90 - -
64A114D91-1 Wheel Rim - 64A114D91 - -
3992AS111-1 Brake Cable Assembly 1740-01-622-1434 3992AS111 - 2
3992AS350-1 Wheel Assembly, Front 1740-01-622-1431 3992AS350 - 2
3992AS350-2 Wheel Assembly, Rear 1740-01-622-1433 3992AS350 - 2
3992AS352-1 Wheel Bearing - 3992AS352 - -