AMENDMENT 1 The purpose of this amendment is to answer questions received in response to the LONG solicitation and as a result of Question 1 extend the response date from 07 March 2014 to 14 March 2014.

View the file

Other files

File Type Posted
LONG_-_Logistics_CDRLS_UPDATED_140306.doc DOC document
N68335-14-R-0019_Amendment_0002.doc DOC document
LONG_-_System_Specification.doc DOC document
LONG_-_Statement_of_Work.doc DOC document
LONG_-_Engineering_CDRLs.doc DOC document
LONG_-_Logistics_CDRLS.doc DOC document
N68335-14-R-0019.doc DOC document
LONG_-_Acquisition_Logistics_Statement_of_Work.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT #1

The purpose of this amendment is to answer questions received in response to the LONG solicitation and as a result of Question #1, extend the response date from 07 March 2014 to 14 March 2014.

All other terms and conditions remain unchanged.

The Government Point of Contact is:

Keith Welge keith.welge@navy.mil

(732) 323-7213

QUESTION #1

We request an additional weeks time to respond to the solicitation.

ANSWER #1

The response date has been extended from 07 March 2014, by 7 days, to 14 March 2014.

QUESTION #2

The System Specification for the Liquid Oxygen/Nitrogen Generator 3.2.1.1 Produce Product from Ambient Air (a) states that the generator shall be capable of producing at least 1.5 tons/day of product in ambient conditions of 70°F, 1 atm, and 50% relative humidity for a minimum of 240 hours (10 days) of continuous operation. Clarify the product.

ANSWER #2

The LONG shall be capable of producing each of the following:

(1) 1.5 ton/day O2

(2) 1.5 ton/day N2

(3) 1.5 ton/day total product O2 + N2 (e.g. 0.75 O2 + 0.75 N2)

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Mar-2014 02:00 PM to 14-Mar-2014 02:00 PM.

(End of Summary of Changes)