RFI 0001 Chiller replacement.pdf
PDF 258 KB Posted
- Solicitation number
- N6660423Q0265
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 0001 Chiller replacement
1. REF: “Any refrigerant reclaimed is the property of the Government, coordinate with the
Installation Environmental Office to determine the appropriate turn in location.” Will the government allow the KTR to reclaim, process, recycle, and provide certified refrigerant for this project?
1A. Yes, we will allow the contractor to reclaim and dispose of the refrigerant properly by coordinating with NAVAL STATION NEWPORT, who will require CAA 40-82F forms be completed.
2. If no, where is the designated turn in location and who is responsible for its transportation and other documentation?
2A. N/A
3. DWG 22-066A notes chillers are located across the street located within BLDG 15 and
KTR is responsible for transporting them across civilian roads to NUWC.
a. Will the government consider revising this requirement and transport chillers to final location? Note: during site visit it was discovered the larger Chiller for
BLDG 1170 was already transported across the street. Customer has not provided location of other two 31-ton chillers. Please provide.
b. Are there additional insurance coverages required for this transportation? If so, please provide type of coverages/amounts of coverage for government owned materials. Cost will be allocated into KTR proposal.
3A. See Revised Drawing and Specification.
File details come from the government source that posted it. Updated .