RFI 0002 Chiller replacement
1. After further review of this project, the government specifications call for the following.
REF: “Building priority is as followed building 109 then 105, and then 1170. Work at each building shall be completed in full before continuing on to the next building.”
Will the government allow for the contractor to demo/remove/install the units at the same time? Having the ability to demo, remove, and install units all at once will enable the contractor to offer the best cost to the government as it will limit mobilization/demolition/ and crane/forklift/LULL costs. Ultimately providing the best value to the customer/government.
Answer: The government will not allow the contractor to demo/remove/install the units at the same time. We are moving into the summer season and we would like to lessen the impact to each building
2. Previous answer to RFI’s submitted notated the following.
REF: “NEW Chillers, which will be located close by”
Will the government please clarify if each unit will be close by to each of their own specific final install locations or further clarify what and/or how close by. Located together, separate, on NUWC, etc.
Answer: Each new unit will be located nearby to its specific install location. The new unit for 109 will be located nearby the existing unit and etc. It will still be the contractor’s responsibility for final placement and installation of each unit.