FULLRFP.pdf
PDF 516 KB Posted
- Attached to
- Modernize spare weapon components, improve weapon functionality, and meet NAVSEA program requirements
- Solicitation number
- N66604-08-Q-1116
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 22 Aug 2008
X
A X B X C X D
EX
X
G F 30 - 35
36 - 42 X H john.p.deciutiis@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 42
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N66604 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Bldg. 11 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JOHN P. DECIUTIIS 401-832-3314
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 9
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
12 - 13 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 14 - 19 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 20 - 23 M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
24 - 28
PART II - CONTRACT CLAUSES
NAVAL UNDERSEA WARFARE CENTER
CODE 11911, JOHN P. DECIUTIIS
COMMERCIAL ACQUISITION
SIMONPIETRI DRIVE, BLDG. 11
NEWPORT RI 02841
401-832-3314
401-832-4820FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
23 Jul 2008
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N66604-08-R-1116
Section A - Solicitation/Contract Form
CLAUSES INCORPORATED BY FULL TEXT
Distribution:
FILE
KR
NUWC 02/115
DCM: S2404A
DFAS: HQ0338
DCAA: HAA310
POC: 8232 / Plunkett, S.
POC: 8132 / Carvalho, H.
CLO: 1193/Merriwether, M.
Section B - Supplies or Services and Prices
B18 SUPPLIES/SERVICES
(a) This is an indefinite delivery - indefinite quantity contract with cost plus fixed fee provisions. Individual Orders under this contract will be issued on either a term or completion form basis.
(b) The Contractor shall, in accordance with orders issued by the ordering officer, perform work assignments within the parameters of the Statement of Work.
(c) The services and material to be ordered hereunder shall be reimbursed in accordance with the provisions of the clauses herein entitled, Allowable Cost and Payment (FAR 52.216-7) and Fixed Fee (FAR 52.216-8), the terms of which are construed to apply, on an individual basis, to each order issued. For the purpose of establishing the fixed fee for each order issued under this contract, refer to the clause in this section entitled, Payment of Fixed Fee.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
SERVICES
CPFF
Contractor shall provide services in accordance with the Statement of Work, Attachment # 1.
FOB: Destination
NSN: 0000SERVICES0
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Lot
DATA
Data in accordance with Contract Data Requirements List (CDRL), DD Form 1423, which will provided at the individual task order level.
Amount: NSP
NSN: 0000SERVICES0
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
B33 LEVEL OF EFFORT – IDIQ (SEP 2001)
(a) The level of effort estimated to be ordered during the term of this contract is 116,400 man-hours of direct labor including authorized subcontract labor, if any. The level of effort is expected to occur evenly over the contract term.
The Contractor shall not, under any circumstances, exceed 100% of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows:
Labor Category eCraft Category
Man-hours Contractor Site
Man-hours Government Site
Administrative Assistant AA2 960 240 Engineer, System I ESY1 23,040 5,760 Engineer, System II ESY2 30,720 7,680 Engineer, System III ESY3 30,720 7,680 Manager, Administrative II MANA3 5,760 1,440 Manager, Program/Project II MANP2 1,920 480
Totals 93,120 23,280
* denotes Key Personnel labor categories
(b) Either the "Limitation of Cost" or the "Limitation of Funds" clause, depending upon whether the order is fully funded, applies independently to each order under this contract and nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either the "Limitation of Cost" or "Limitation of Funds" clause.
(c) In the event that less than 100% of the established level of effort of the basic contract is actually expended by the completion date of the contract (or if said Level of Effort has been previously revised upward, of the fee bearing portion of the additional hours by which the Level of Effort was last increased), the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the "Limitation of Cost" or the "Limitation of Funds" clause, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than 100% of the established Level of Effort (or the fee bearing portion of the last upward revision).
(d) Completion Form Orders.
(1) An estimated level of effort shall be established for each completion form order. This estimated level of effort is established for the purpose of determining the amount of fixed fee payable on the order and tracking the ceiling amount of the contract, it is not to be construed as a performance requirement.
(2) Within thirty days after completion of the work under each completion form order, the Contractor shall submit the following information directly, in writing, to the ordering officer, with copies to the COR and the Defense Contract Audit Agency office to which vouchers are submitted:
(i) The Contractor's estimate of the total allowable cost incurred under the order; and
(ii) In the case of a cost underrun, the amount by which the estimated cost of the order may be reduced to recover excess funds.
(e) Term Form Orders.
(1) The Contractor shall notify the Procuring Contracting Officer immediately in writing whenever it has reason to believe that:
(i) The level of effort the Contractor expects to incur under any term form order in the next 60 days, when added to the level of effort previously expended in the performance of that order, will exceed 75% of the level of effort established for that order; or
(ii) The level of effort required to perform a particular term form order will be greater than the level of effort established for that order.
(2) As part of the notification, the Contractor shall provide the Contracting Officer a revised estimate of the level of effort required to perform the order. As part of the notification, the Contractor also shall submit any proposal for adjustment to the estimated cost and fixed fee that it deems would be equitable if the Government were to increase the level of effort as proposed by the Contractor. Any such upward adjustment shall be prospective only, i.e., will apply only to effort expended after a modification (if any) is issued. However, whether an increase in fixed fee is appropriate shall depend on the circumstances involved, and, except as otherwise provided in the contract, shall be entirely within the discretion of the Contracting Officer.
(3) In performing term form orders, the Contractor may use any combination of hours of the labor categories listed in the order.
(4) Within thirty days after completion of the work under each term form order, the Contractor shall submit the following information directly, in writing, to the ordering officer, with copies to the COR and the Defense Contract Audit Agency office to which vouchers are submitted:
(i) The total number of man-hours of direct labor, including subcontract labor, expended and a breakdown of this total showing the number of man-hours expended in each direct labor classification listed in the order schedule, including the identification of the key employees utilized;
(ii) The Contractor's estimate of the total allowable cost incurred under the order; and
(iii) In the case of a cost underrun, the amount by which the estimated cost of the order may be reduced to recover excess funds.
(5) In the event that less than 100% of the established level of effort of a term order (or if said level of effort has been previously revised upward, of the fee bearing portion of the additional hours by which the level of effort was last increased) is actually expended by the completion date of the contract, the Government shall have the option of:
(i) Requiring the Contractor to continue performance, subject to the provisions of the "Limitation of Cost" or the "Limitation of Funds" clause, as applicable, until the effort expended equals 100% of the established Level of Effort (or of the fee-bearing portion of the last upward revision); or
(ii) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than 100% of the established Level of Effort (or the fee bearing portion of the last upward revision).
(6) In the event that the expended level of effort of a term order exceeds the established level of effort by 10% or less, but does not exceed the estimated cost of the order; the Contractor shall be entitled to cost reimbursement for actual hours expended, not to exceed the ceiling cost. The Contractor shall not be paid fixed fee, however, on level of effort in excess of 100% without complying with subsection (e)(1) above. This understanding does not supersede or change subsection (e)(1) above, whereby the Contractor and Government may agree on a change to the order level of effort with an equitable adjustment for both cost and fee.
B38 OFFERS FOR LESS THAN THE TOTAL LEVEL OF EFFORT ARE UNACCEPTABLE
Except as provided in L33 entitled, “Alternate Labor Categories”, offers for less than the total quantity for all items are UNACCEPTABLE.
B52X PAYMENT OF FIXED FEE - IDIQ (FEB 2004)
(a) The fixed fee specified in Section B is the maximum fee that may be paid under this contract. The Government shall pay fixed fee as provided in this clause. This fee shall be paid, subject to any adjustment required by other clauses of this contract, in installments at the time of each provisional payment for reimbursement of allowable cost.
(b) A fixed fee shall be established for each order issued under this contract. The fixed fee shall be established by dividing the level of effort (direct man-hours) stated in the order by the total contract level of effort (direct man-hours) and multiplying the result by the total contract fixed fee. The amount of each installment payment of fixed fee shall be determined by dividing the net direct labor hours expended during the period by the level of effort established in the order and multiplying the result by the total fixed fee established in the order.
(c) Completion Orders. The Contractor is entitled to the full fixed fee amount upon the acceptable completion of the order.
(d) Term Orders. Fee shall be paid only for hours performed, not to exceed the fixed fee amount stated in the order.
(e) Withholding. As provided in the clause entitled, Fixed Fee (FAR 52.216-8), the Contracting Officer hereby withholds 15% of all fixed fee payable until the total contract fee withheld reaches the stated maximum of $100,000. Invoices submitted under the individual orders shall indicate fixed fee withheld.
Section C - Descriptions and Specifications
C12 STATEMENT OF WORK - IDIQ (SEP 2001)
Services shall be performed in accordance with the Statements of Work which are included in the individual orders.
These Statements of Work detail efforts that fall within the scope of the basic contract Statement of Work, Attachment #1.
C16 COST AND PERFORMANCE REPORTING (JUL 2004)
(a) The Contractor agrees to provide the Contractor's Funds and Man-hour Expenditure Report in the Electronic Cost Reporting and Financial Tracking (eCRAFT) System within sixty (60) days after the date of contract award.
Failure to comply with this requirement may result in contract termination.
(b) The Contractor's Funds and Man-hour Expenditure Report reports contractor expenditures for labor, materials, travel and other contract charges.
(1) Format. Data shall be reported in a format acceptable to the Electronic Cost Reporting and Financial Tracking System (eCraft). Paper submittal of the data is permitted for the first 60 days of performance.
Address paper submittals to the Contracting Officer's Representative identified in the contract.
(2) Scope and Content.
(i) The Contractor shall identify costs to the individual SLIN if applicable. If pricing is not established at the SLIN level, report to the CLIN.
(ii) The Contractor shall report individual cost elements comprising the total cost of performance for the current cost reporting period.
(3) Submission and Approval.
(i) Submit report at least once per month beginning 60 days after contract award. Approval will be indicated by e-mail notification from eCraft.
(ii) Distribution Statement. Distribution Statement B: Distribution to U.S. Government agencies only;
Proprietary Information; (date data generated). Other requests for this document shall be referred to NUWCDIVNPT Code 11911 .
(c) The Contractor's Performance Report indicates the progress of work and the status of the program and of all assigned tasks. It informs the Government of existing or potential problem areas. References to costs are meant to be at a summary level. Preparation instructions follow.
(1) Format. Pages shall be sequentially numbered. All attachments shall be identified and referenced in the text of the report. Report shall be prepared in the contractor's format and shall be legible and suitable for reproduction. Electronic submission is encouraged.
(2) Content.
(i) Provide a front cover sheet that indicates the contractor's name and address, the contract number, the system or program nomenclature, the report date, the reporting period, the report title and a serial number for the report, the security classification, the name and address of the person who prepared the report, and the name of the issuing Government activity (Naval Undersea Warfare Center Division, Newport).
(ii) Report contract schedule status. Describe the progress made against milestones during the reporting period.
(iii) Report any significant changes to the contractor's organization or methods of operation, to the project management network, or to the milestone chart.
(iv) Report problem areas affecting technical, scheduling, or cost elements. Provide background and recommendations for solutions beyond the scope of the contract. Report results (positive or negative) obtained related to previously identified problem areas, with conclusions and recommendations.
(v) Report all trips and significant results.
(vi) Report all significant communications and any commitments made thereby. Include all non-contractual communications, such as emails, telephone conversations, etc.
(vii) Report Engineering Change Proposal (ECP) status. Identify all ECPs by status, i.e., proposed, approved and implemented.
(viii) Report plans for activities during the following reporting period.
(ix) Include appendices for any necessary tables, references, photographs, illustrations, charts, etc.
(3) Submission and Approval.
(i) Submission. Submit report monthly beginning 30 days after contract award.
(ii) Distribution. Provide one original copy to the Contracting Officer's Representative. Additional copies shall be provided to:
(iii) Distribution Statement. Distribution Statement B: Distribution to U.S. Government agencies only;
Proprietary Information; (date data generated). Other requests for this document shall be referred to NUWCDIVNPT Code 11911.
(iv) Approval. DD Form 250 is not required. Approval will be indicated via letter of transmittal.
(d) The contractor shall not provide other funds, man-hour, or status reporting without the prior written approval of the contracting officer.
C24 SECURITY REQUIREMENTS
The Contractor shall comply with Attachment #2, DD Form 254, Contract Security Classification Specification, and any documents such as Classification Guides attached thereto or referenced thereon.
C25 ACCESS TO GOVERNMENT SITE (APR 2008)
(a) Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site. Access to Naval Undersea Warfare Center Division, Newport sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. Compliance with SECNAV M-5510.30, Section 9-20, FACILITY ACCESS DETERMINATION (FAD) PROGRAM is specifically required. Badges shall be issued only after completion of SF85P available at:
http://www.opm.gov/forms/index.asp http://www.opm.gov/forms/index.asp
Contractor personnel requiring a Common Access Card, access to controlled unclassified information (CUI) and/or user level access to DoN or DoD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete or otherwise manipulate sensitive information without control to identify and deny sensitive information, are required to have a favorably adjudicated
NACLC.
The Contractor shall ensure that Contractor personnel employed on any Government site become familiar with and obey Activity regulations. Contractor personnel shall not enter restricted areas unless required to do so and until cleared for such entry. The Contractor shall request permission to interrupt any activity roads or utility services in writing a minimum of 15 calendar days prior to the date of interruption. Contractor personnel shall wear personal protective equipment in designated areas. All contractor equipment shall be conspicuously marked for identification.
The contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA) Regulations, Environmental Protection Agency (EPA) Regulations, and all applicable state and local requirements.
(b) The contractor shall ensure that each contractor employee reads the pamphlet entitled, “Occupational Safety and Health Information for Contractors” prior to commencing performance at any NUWCDIVNPT site. This document is available at:
http://www.nuwc.navy.mil/npt/Visit/visit.htm
(c) The contractor shall ensure that each contractor employee reads the document entitled, “NUWC Environmental Policy” prior to commencing performance at any NUWCDIVNPT site. This document is available at http://www.nuwc.navy.mil/npt/Visit/visit.htm
(d) The contractor shall ensure that each contractor employee who is resident at any NUWCDIVNPT site completes ISO 14001 Awareness training within 30 days of commencing performance at that site. This training is available on the ISO 14001 webpage on the NUWCDIVNPT Intranet and is also available on the NUWC Division Newport Internet site. This document is available at http://www.nuwc.navy.mil/npt/Visit/visit.htm
(e) The contractor shall remove from the Government site any individual whose presence is deemed by the Commander, NUWCDIVNPT, to be contrary to the public interest or inconsistent with the best interests of national security.
C54 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
http://www.nuwc.navy.mil/npt/Visit/visit.htm
Section D - Packaging and Marking
D11 PRESERVATION, PACKAGING, PACKING AND MARKING (SEP 2001)
Preservation, packaging, packing, and marking shall be in accordance with ASTM D 3951-98, "Standard Practice for Commercial Packaging". Additionally, the Contractor shall mark all packages with the following, as appropriate:
CONTRACT NUMBER: (from DD Form 1447 Block 2 or DD Form 1155 Block 1) ORDER NUMBER (if an Indefinite Delivery contract): (from DD Form 1155 Block 2) REQUISITION NUMBER: (from DD Form 1447, except for orders use DD Form 1155 Block 4)
MARK FOR:
Name Code Telephone No.
D20 DELIVERY OF DATA (SEP 2001)
(a) Data furnished hereunder shall be adequately packaged to assure safe delivery at destination.
(b) Transmittal of classified information by mail shall be in accordance with the National Industrial Security Program Operating Manual (NISPOM) for Safeguarding Classified Information (DOD 5220.22-M).
(c) All copies of CDRL items under this contract, regardless of distribution, shall be marked on the report cover with the following information:
Naval Undersea Warfare Center Division, Newport Contract, Order, and ELIN Numbers Report Title Date of Report Contractor Name (division which generated the report)
D24 PROHIBITED PACKING MATERIALS
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 252.246-7000 Material Inspection And Receiving Report MAR 2008
E14 INSPECTION AND ACCEPTANCE OF SERVICES
The Contracting Officer’s Representative (COR) or the Alternate COR, as evidenced by a signed Certificate of Final Acceptance (COFA) memorandum, shall perform inspection and acceptance of the services being furnished. The COFA shall be signed only by the COR or Alternate COR designated in clause G17.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 19-OCT-2013 1 NAVAL STATION NEWPORT, RECEIVING
OFFICER
RECEIVING OFFICER
SEE CLAUSE D3
--- RI
401-841-3827
N66604
0002 19-OCT-2013 1 (SAME AS PREVIOUS LOCATION)
N66604
52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984 52.247-34 F.O.B. Destination NOV 1991 52.247-55 F.O.B. Point For Delivery Of Government-Furnished
Property
JUN 2003
F18 DELIVERY AT DESTINATION (AUG 1999)
The articles to be furnished hereunder shall be delivered in accordance with the clause entitled, F.O.B. Destination (FAR 52.247-34), to the following address:
Supply Officer Naval Undersea Warfare Center, Division Newport Naval Station Newport, Bldg. 47 47 Chandler Street Newport, RI 02841-1708
F20 PERFORMANCE PERIOD (SEP 2001)
(a) For planning and proposal purposes this contract will become effective on 20 OCT 2008. The actual effective date shall be established at contract award and will be set forth on the face page of the contract. The ordering period is defined in the clause entitled, Ordering (FAR 52.216-18).
(b) The performance period shall continue until the date specified in the clause entitled, Requirements (FAR 52.216-21), or Indefinite Quantity (FAR 52.216-22), whichever is applicable.
(c) Individual orders will specify a beginning date and an ending date. Costs incurred prior to the beginning date or after the ending date shall not be directly allowable without the written consent of the Contracting Officer (modification).
F23 DELIVERY OF DATA - IDIQ (SEP 2001)
Place and time of delivery of data shall be as specified on the DD Form 1423, Contract Data Requirements List (CDRL), supplied with each order. CDRLs included in the basic contract are representative of data likely to be required during performance. The CDRLs furnished with the individual Orders shall control. Any change in the delivery of data must be made by a formal modification to the order.
F30 PLACE OF PERFORMANCE (SEP 2001)
(a) Work will be performed at the Contractor's facility or other locations, as required by the statement of work. For indefinite delivery type contracts, the individual orders may specify locations where work shall be performed.
These sites are likely to include, but are not limited to the following locations: NUWCDIVNPT and
NUWCDIVKPT.
(b) Sea travel and work aboard Government warships or vessels may be required. The Contractor must obtain boarding authorization from the Commanding Officer prior to boarding any U.S. Naval warship or vessel.
(c) The Contractor is responsible for making all needed arrangements for its personnel. This includes but is not limited to travel reservations, medical examinations, immunization, passports, visas, and security clearances.
(d) Travel outside the continental United States may be required; see Section I for clauses relating to overseas travel.
F40 CONTRACTOR PERFORMANCE ASSESSMENT RATING SYSTEM (CPARS) (AUG 1999)
(a) Pursuant to FAR 42.1502, this contract is subject to DoD's Contractor Performance Assessment System (CPARS). CPARS is an automated centralized information system accessible via the Internet that maintains reports of contractor performance for each contract. CPARS is located at http://www.cpars.navy.mil/. Further information on CPARS is available at that web-site.
(b) Under CPARS, the Government will conduct annual evaluations of the contractor's performance. The contractor has thirty (30) days after the Government's evaluation is completed to comment on the evaluation. The opportunity to review and comment is limited to this time period and will not be extended. Failure to review the report at this time will not prevent the Government from using the report.
(c) The CPARS system requires the Government to assign the contractor a UserID and password in order to view and comment on the evaluation. Provide the name(s) of at least one individual (not more than three) that will be assigned as your Defense Contractor Representative for CPARS.
Name Phone E-mail Address (optional) http://www.cpars.navy.mil/
Section G - Contract Administration Data
G1 SUBMISSION OF INVOICES -- COST REIMBURSEMENT (AUG 2002)
(a) “Invoice” as used in this clause includes contractor requests for interim payments using public vouchers (SF1034) but does not include contractor requests for progress payments under fixed price incentive contracts.
(b) The Contractor shall submit invoices and any necessary supporting documentation, in an original and four (4) copies, to the contract auditor at the following address: See clause G12, Cognizant DCAA, unless waived by DCAA. If Electronic Cost Reporting and Financial Tracking (eCraft) is applicable to this contract, provide duplicate information to eCraft.
(c) Invoices requesting interim payments shall be submitted no more than once every two weeks, unless another time period is specified in the Payments clause of this contract. For indefinite delivery type contracts, interim payment invoices shall be submitted no more than once every two weeks for each order. There shall be a lapse of no more than 30 calendar days between performance and submission of an interim payment invoice.
(d) In addition to the information identified in the Prompt Payment clause herein, each invoice shall contain the following information, as applicable:
(1) Contract line item number (CLIN)
(2) Subline item number (SLIN)
(3) Accounting Classification Reference Number (ACRN)
(4) Payment terms
(5) Procuring activity
(6) Date supplies provided or services performed
(7) Costs incurred and allowable under the contract
(8) Vessel (e.g., ship, submarine or other craft) or system for which supply/service is provided
(e) A DD Form 250, “Material Inspection and Receiving Report”, is not required for interim invoices.
(f) A Certificate of Performance is required unless Electronic Cost Reporting and Financial Tracking (eCraft) is applicable to this contract.
(g) The Contractor’s final invoice shall be identified as such, and shall list all other invoices (if any) previously tendered under this contract. The Government may indicate final acceptance on DD Form 250 or by other appropriate means such as a Certificate of Final Acceptance.
(h) Costs of performance shall be segregated, accumulated and invoiced to the appropriate ACRN categories to the extent possible. When such segregation of costs by ACRN is not possible for invoices submitted with CLINS/SLINS with more than one ACRN, costs will be allocated on a first-in first-out basis. For example, invoice ACRN A1 until fully expended, followed by ACRN A2 until fully expended, followed by ACRN A3 until fully expended, etc.
G10 CONTRACTUAL AUTHORITY AND COMMUNICATIONS (JAN 2004)
(a) Except as specified in subparagraph (b) below, no order, statement, or conduct of any Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the Changes clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
(d) The Government reserves the right to administratively transfer authority over this contract from the individual named below to another Contracting Officer at any time.
(e) (For Indefinite Delivery contracts only) Ordering Officers are Contracting Officers of the Naval Undersea Warfare Center Division, Newport. However, their authority extends only to the order that they sign.
(f) The address and telephone number of the Contracting Officer is:
Name: Diane Christensen
Address: Commercial Acquisition Department, Building 11 Naval Undersea Warfare Center Division, Newport Code 11911 Simonpietri Drive Newport, RI 02841-1708
Telephone: Commercial: 401-832-1445; DSN: 432-1445
Email: diane.christensen@navy.mil
G11 CONTRACT ADMINISTRATION FUNCTIONS (SERVICES)
(a) The cognizant Administrative Contracting Office for this contract is identified in Block 12 on page one of this contract.
(b) PCO RETAINED FUNCTIONS. The Procuring Contracting Officer (PCO) retains the administrative functions described in FAR 42.302(a) and listed below. These functions will be accomplished as set forth in the Contract Administration Plan or Contract Administration Master Plan, as applicable, Attachment #4.
(3) Conduct post-award orientation conferences.
(40) Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production.
(44) Perform engineering analyses of contractor cost proposals.
(45) Review and analyze contractor-proposed engineering and design studies and submit comments and recommendations to the contracting office, as required.
(46) Review engineering change proposals for proper classification, and when required, for need, technical adequacy of design, producibility, and impact on quality, reliability, schedule, and cost; submit comments to the contracting office.
(47) Assist in evaluating and make recommendations for acceptance or rejection of waivers and deviations.
(c) ACO DELEGATED FUNCTIONS. The Administrative Contracting Officer (ACO) is delegated the following functions:
(1) All other functions of FAR 42.302(a) except (3), (40), (44), (45), (46), and (47).
(2) The function of FAR 42.302(b)(4); negotiating and executing supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements, and for the crediting of any overpayments made to the contractor. Attach a copy of the modification to the DD 1594 and forward to the PCO address (Attn: Code 5912 -- CLOSEOUT)
(3) The function of FAR 42.302(b)(6).
(d) If the ACO identifies a contract administration problem, the remedy for which is not covered by the above, the ACO shall request the PCO to delegate additional functions as necessary. The PCO may delegate authority by letter.
G12 COGNIZANT DCAA
The cognizant DCAA for this contract is:
Office: *
Address:
Telephone:
* Offerors should fill in the above information, if known.
G14 CONTRACTOR'S SENIOR TECHNICAL REPRESENTATIVE (APR 2003)
Fill in the information required below. The contractor's senior technical representative, point of contact for performance under this contract is:
Name:
Title:
Mailing Address:
E-mail Address:
Telephone: FAX:
G15 NOTE TO PAYMENT OFFICE - ADDRESS OF PAYEE
The Paying Office will mail payments to:
* Offerors should complete the above if they wish payments to be sent to an address other than that shown on the contract face. Invoices should also specifically inform the paying office of this address.
G16 NOTE TO PAYMENT OFFICE - PAYMENT BY ACRN (MAY 2001)
In the event the contractor does not identify the specific ACRN (or the related SLIN) being invoiced, the paying office is directed to pay the invoice by assigning the ACRN on a first-in first-out basis. For example, pay from ACRN A1 until fully expended, followed by ACRN A2 until fully expended, followed by ACRN A3 until fully expended, etc. If necessary, the paying office should assign the appropriate SLIN.
G17 COR APPOINTMENT
(a) The Contracting Officer hereby appoints the following individual as the Contracting Officer’s Representative (COR) for this contract:
COR: Name: Code:
Mailing Address: Naval Undersea Warfare Center Division, Newport 1176 Howell Street Building: Room:
Newport, RI 02841-1708
Telephone: Commercial: (401) 832- ; DSN: 432-
(b) The COR is responsible for those specific functions assigned in the Contract Administration Master Plan, or Contract Administration Plan as applicable, Attachment #4.
(c) Alternate COR. In the absence of the COR named above, all responsibilities and functions assigned to the COR shall be the responsibility of the Alternate COR acting on behalf of the COR. The Contracting Officer hereby appoints the following individual as the Alternate COR.
ALT.COR: Name: Code:
Telephone: Commercial: (401) 832- ; DSN: 432-
(d) Only the Contracting Officer has the authority to modify the terms of the contract. Therefore, in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the Government. If, in the opinion of the contractor, an effort outside the existing scope of the contract is requested, the contractor shall promptly notify the PCO in writing. No action shall be taken by the contractor unless the PCO or ACO has issued a formal modification.
G2 INVOICE INSTRUCTIONS (NAVSEA - AUG 2007) (MAR 2008)
(a) In accordance with the clause of this contract entitled “ELECTRONIC SUBMISSION OF PAYMENT REQUESTS” (DFARS 252.232-7003), the Naval Undersea Warfare Center Division, Newport, Rhode Island (NUWCDIVNPT) will utilize the DoD Wide Area Workflow Receipt and Acceptance (WAWF) system to accept supplies/services delivered under this contract. This web-based system located at https://wawf.eb.mil provides the technology for government contractors and authorized Department of Defense (DoD) personnel to generate, capture and process receipt and payment-related documentation in a paperless environment. Invoices for supplies/services rendered under this contract shall be submitted electronically through WAWF. Submission of hard copy DD250/invoices may no longer be accepted for payment.
(b) It is recommended that the person in your company designated as the Central Contractor Registration (CCR) Electronic Business (EB) Point of Contact and anyone responsible for the submission of invoices, use the online training system for WAWF at http://wawftraining.com. The Vendor, Group Administrator (GAM), and sections marked with an asterisk in the training system should be reviewed. Vendor Quick Reference Guides also are available at http://acquisition.navy.mil/navyaos/content/view/full/3521/. The most useful guides are “Getting Started for Vendors” and “WAWF Vendor Guide”.
(c) The designated CCR EB point of contact is responsible for activating the company’s CAGE code on WAWF by calling 1-866-618-5988. Once the company is activated, the CCR EB point of contact will self-register under the company’s CAGE code on WAWF and follow the instructions for a group administrator. After the company is set-up on WAWF, any additional persons responsible for submitting invoices must self-register under the company’s CAGE code at https://wawf.eb.mil.
(d) The contractor shall use the following document types, DODAAC codes and inspection and acceptance locations when submitting invoices in WAWF:
Type of Document (contracting officer check all that apply)
Invoice and Receiving Report Combo (FFP Supply) Invoice as 2-in-1 (FFP Service Only) X Cost Voucher (Cost Reimbursable, T&M , LH, or FPI)
DODAAC Codes and Inspection and Acceptance Locations (contracting officer complete appropriate information as applicable)
Issue DODAAC N66604 Admin DODAAC Determined at Award Pay Office DODAAC Determined at Award Inspector DODAAC Leave Blank Service Acceptor DODAAC Leave Blank Service Approver DODAAC Determined at Award Ship To DODAAC Leave Blank DCAA Auditor DODAAC Determined at Award LPO DODAAC Determined at Award https://wawf.eb.mil/ http://wawftraining.com/ http://acquisition.navy.mil/navyaos/content/view/full/3521/ https://wawf.eb.mil/
Inspection Location Leave Blank Acceptance Location Leave Blank
CLIN/ACRN information should be included on all submissions.
Attachments created in any Microsoft Office product may be attached to the WAWF invoice, e.g., backup documentation, timesheets, etc. Maximum limit for size of each file is 2 megabytes. Maximum limit for size of files per invoice is 5 megabytes.
(e) Before closing out of an invoice session in WAWF, but after submitting the document(s), you will be prompted to send additional email notifications. Click on “Send More Email Notification” and add the acceptor/receiver email addresses noted below in the first email address block, and add any other additional email addresses desired in the following blocks. This additional notification to the government is important to ensure that the acceptor/receiver is aware that the invoice documents have been submitted into WAWF.
Send Additional Email Notification To:
To be determined at time of award
(f) The contractor shall submit invoices/cost vouchers for payment per contract terms and the government shall process invoices/cost vouchers for payment per contract terms. Contractors approved by DCAA for direct billing will submit cost vouchers directly to DFAS via WAWF.
(g) If you have any questions regarding WAWF, please contact the WAWF helpdesk at the above 1-866 number or the NUWCDIVNPT WAWF point of contact , Jerry Palmer at 401-832-1645 or gerard.palmer@navy.mil (alternate: Catharine Costakos at 401-832-1488, catharine.costakos@navy.mil). For financial questions about WAWF, please contact Barbara Sangeado at 401-832-4952 or barbara.sangeado@navy.mil mailto:gerard.palmer@navy.mil mailto:catharine.costakos@navy.mil mailto:barbara.sangeado@navy.mil
Section H - Special Contract Requirements
H14 ORGANIZATIONAL CONFLICT OF INTEREST - FAR 9.505-4
(a) In accordance with FAR 9.505-4, whereas the statement of work for this contract requires access to proprietary data of other companies the Contractor must agree with the other companies to (1) protect their information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it was furnished. The Contractor agrees to furnish copies of such agreements to the Contracting Officer before accepting possession of such data. The Contractor further agrees that such proprietary data shall not be used in performing for the Department of Defense additional work in the same field as work performed under this contract if such additional work is procured competitively.
(b) For the purpose of this clause, the term "Contractor" means the Contractor, its subsidiaries and affiliates, joint ventures involving the Contractor, any entity with which the Contractor may hereafter merge or affiliate, and any other successor of the Contractor.
(c) The Contractor shall, within 15 days after the effective date of this contract, provide a written certification to the Contracting Officer that all employees, agents and subcontractors involved in the performance of this contract have been informed of the provisions of this clause.
(d) Any subcontractor which performs any work relative to this contract shall be subject to this clause. The Contractor agrees to place in each subcontract affected by these provisions the necessary language contained in this clause.
(e) The prohibitions imposed by this clause may be waived by the Contracting Officer.
(f) In the event the Contractor, or any of its employees, agents or subcontractors fails to comply with the provisions of this clause, such noncompliance shall be deemed a material breach of contract for which the Government reserves the right to terminate the contract for default and/or resort to such other rights and remedies as provided for under this contract and under the Federal law of contracts. Noncompliance with the provisions of this clause may also adversely affect the determination of Contractor responsibility in future Government acquisitions.
(g) The Government may administratively modify the contract to list agreements between the Contractor and third parties into the contract.
H21 LIABILITY INSURANCE
The following types of insurance are required in accordance with the clause entitled, Insurance - Liability To Third Persons (FAR 52.228-7), and shall be maintained in the minimum amounts shown:
(1) Comprehensive General Liability: $200,000 per person and $500,000 per accident for bodily injury. No property damage general liability insurance is required.
(2) Automobile Insurance: $200,000 per person and $500,000 per accident for bodily injury and $20,000 per accident for property damage. Comprehensive form of policy is required.
(3) Standard Workmen's Compensation and Employer's Liability Insurance (or, where maritime employment is involved, Longshoremen's and Harbor Worker's Compensation Insurance) in the minimum amount of $100,000.
H24 PROHIBITION ON TELECOMMUNICATIONS (OCT 2006)
The contractor is expressly prohibited from purchasing any telecommunication devices (i.e. satellite telephones, cell phones, pagers, blackberry, two way radios, walkie-talkies, etc. or any associated accessories) without the written approval of the contracting officer on an item by item basis.
H28 MINIMUM AND MAXIMUM QUANTITIES
As referred to in paragraph (b) of the clause entitled, Indefinite Quantity (FAR 52.216-22), the contract minimum quantity is a total of $50,000 worth of orders. The contract maximum quantity is the total number of hours of effort specified in Section B. For the purpose of calculating the expenditure of hours in relation to the maximum quantity, the total hours expended shall be the sum of (1) the total number of hours ordered under all term form orders and (2) the total number of hours of estimated level of effort established under all completion form orders.
H29 ORDERING (MAY 2002)
(a) Ordering. Orders may be placed by any Contracting Officer of the Naval Undersea Warfare Center Division, Newport. Orders may be written, on DD Form 1155, or oral. Orders may also be issued by FAX or by emailing a file that contains the order with the contracting officer's signature. Cost reimbursement orders may be issued on either a Term or Completion form basis as described in FAR 16.306. See FAR 52.216-18 for additional information.
(b) Information. Each order should include the following:
(1) Date of order
(2) Contract and order number
(3) Appropriation and accounting data
(4) Description of the work to be performed, including the period of performance, and a description of any end items to be delivered
(5) Exact place of pickup or delivery
(6) DD Form 1423, Contract Data Requirements List, if applicable
(7) Identification of the person(s) or organization(s) responsible for inspection and acceptance
(8) List of Government Furnished Property and the estimated value thereof, if applicable.
(9) DD Form 254, Contract Security Classification Specification, if applicable (10 The pricing arrangement of the order. For FFP orders, the Price of the order. For Cost Reimbursement orders, the Estimated Cost, the Fee amount and the Cost Plus Fee amount or the Ceiling Price, as applicable.
(11) For Cost Reimbursement orders, identification as either a term form or completion form order
(12) For Cost Reimbursement term form orders for services, the level of effort including the estimated number of hours for each applicable labor category required to perform the order
(13) For Cost Reimbursement completion form orders for services, the estimated level of effort
(c) If this is a Cost Plus Fixed Fee contract, fixed fee for each order shall be established by dividing the number of hours estimated to be expended in the order by the maximum contract hours and multiplying the result by the contract fixed fee amount. Fixed Fee shall be paid in accordance with the applicable Payment of Fixed Fee clause.
(d) Oral orders, or modifications to existing orders, may be placed only as follows. To issue an oral order the ordering officer shall provide the contractor with the information described in (b) above. The ordering officer shall confirm the order by issuing a DD Form 1155 within five working days. Unilateral orders cannot be issued orally.
(e) Orders under this contract will ordinarily be issued after both parties agree on all terms. If the parties fail to agree, the Ordering Officer may require the Contractor to perform by issuing a unilateral order. Any disagreement concerning the issuance of a unilateral order shall be deemed a dispute within the meaning of the Disputes clause.
(f) Cautionary Note. Nothing stated in an order, quote, or in discussions, can modify the basic contract terms or regulations governing this contract. Orders are not advance agreements under FAR 31.109; costs incurred remain subject to the same standards of allowability regardless of whether they were used as a basis for projecting order pricing.
H51 AUTHORIZATION FOR USE OF SUBCONTRACTED LABOR
(a) Authorization to use subcontracted labor consists of two separate and distinct procedures; consent and approval.
Subcontracts must meet both the consent and approval requirements of this clause to be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .