AMD0001.pdf
PDF 41 KB Posted
- Attached to
- Modernize spare weapon components, improve weapon functionality, and meet NAVSEA program requirements
- Solicitation number
- N66604-08-Q-1116
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FULLRFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
The purpose of this amendment is to make administrative changes to Section B.
1. Clause B33, LEVEL OF EFFORT - IDIQ (SEP 2001) is hereby deleted. Clause B33X, LEVEL OF EFFORT - IDIQ (SEP 2001) is hereby incorporated by full text.
2. Clause B52X, PAYMENT OF FIXED FEE - IDIQ (FEB 2004) is hereby deleted. Clause B52, PAYMENT OF FIXED FEE - IDIQ (FEB 2004) is hereby incorporated by full text.
1. CONTRACT ID CODE PAGE OF PAGES
U
FAR (48 CFR) 53.243
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Aug-2008
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N66604-08-R-1116
X 9B. DATED (SEE ITEM 11)
23-Jul-2008
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2008
CODE
NAVAL UNDERSEA WARFARE CENTER
CODE 11911, JOHN P. DECIUTIIS
COMMERCIAL ACQUISITION
SIMONPIETRI DRIVE, BLDG. 11
NEWPORT RI 02841
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N66604-08-R-1116
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
B33X LEVEL OF EFFORT - IDIQ
B33X LEVEL OF EFFORT – IDIQ (SEP 2001)
(a)(1) The level of effort estimated to be ordered during the term of this contract is 116,400 man-hours of direct labor including authorized subcontract labor, if any. The level of effort is expected to occur evenly over the contract term. The Contractor shall not, under any circumstances, exceed 100% of the total level of effort specified in this basic contract. The total man-hours of direct labor estimated to be required is 116,400.
(a)(2) The contractor should propose a mix of labor hours they believe to be appropriate for performance based on the statement of work.
-Labor categories cited must be titles listaed at the NUWC Division Newport Contracts Website http://www.npt.nuwc.navy.mil/contract/ , then click on SEAPORT Information. For Labor Categories that provide for various Levels (I, II, III, IV) select the Level that best fits the proposed individual- compliance need not be exact.
Labor Category selection is for the purpose of later eCRAFT reporting.
-Number of hours must be assigned to each Labor Category selected.
-Identify at least one Key Person and provide resume(s) for Key Personnel. Qualifications may not be based on the presumption of future education or experience.
-Resumes are not required for Non-Key Personnel.
-Identify all proposed personnel who are not currently employees of the offerorr or proposed subcontractor, or who are proposed to permanently relocate. Provide a statement signed by that person indicating their willingness to be hired or relocated if the task order is awarded to the offeror, and specifying compensation.
(b) Either the "Limitation of Cost" or the "Limitation of Funds" clause, depending upon whether the order is fully funded, applies independently to each order under this contract and nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either the "Limitation of Cost" or "Limitation of Funds" clause.
(c) In the event that less than 100% of the established level of effort of the basic contract is actually expended by the completion date of the contract (or if said Level of Effort has been previously revised upward, of the fee bearing portion of the additional hours by which the Level of Effort was last increased), the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the "Limitation of Cost" or the "Limitation of Funds" clause, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than 100% of the established Level of Effort (or the fee bearing portion of the last upward revision).
(d) Completion Form Orders.
(1) An estimated level of effort shall be established for each completion form order. This estimated level of effort is established for the purpose of determining the amount of fixed fee payable on the order and tracking the ceiling amount of the contract, it is not to be construed as a performance requirement.
http://www.npt.nuwc.navy.mil/contract/
(2) Within thirty days after completion of the work under each completion form order, the Contractor shall submit the following information directly, in writing, to the ordering officer, with copies to the COR and the Defense Contract Audit Agency office to which vouchers are submitted:
(i) The Contractor's estimate of the total allowable cost incurred under the order; and
(ii) In the case of a cost underrun, the amount by which the estimated cost of the order may be reduced to recover excess funds.
(e) Term Form Orders.
(1) The Contractor shall notify the Procuring Contracting Officer immediately in writing whenever it has reason to believe that:
(i) The level of effort the Contractor expects to incur under any term form order in the next 60 days, when added to the level of effort previously expended in the performance of that order, will exceed 75% of the level of effort established for that order; or
(ii) The level of effort required to perform a particular term form order will be greater than the level of effort established for that order.
(2) As part of the notification, the Contractor shall provide the Contracting Officer a revised estimate of the level of effort required to perform the order. As part of the notification, the Contractor also shall submit any proposal for adjustment to the estimated cost and fixed fee that it deems would be equitable if the Government were to increase the level of effort as proposed by the Contractor. Any such upward adjustment shall be prospective only, i.e., will apply only to effort expended after a modification (if any) is issued. However, whether an increase in fixed fee is appropriate shall depend on the circumstances involved, and, except as otherwise provided in the contract, shall be entirely within the discretion of the Contracting Officer.
(3) In performing term form orders, the Contractor may use any combination of hours of the labor categories listed in the order.
(4) Within thirty days after completion of the work under each term form order, the Contractor shall submit the following information directly, in writing, to the ordering officer, with copies to the COR and the Defense Contract Audit Agency office to which vouchers are submitted:
(i) The total number of man-hours of direct labor, including subcontract labor, expended and a breakdown of this total showing the number of man-hours expended in each direct labor classification listed in the order schedule, including the identification of the key employees utilized;
(ii) The Contractor's estimate of the total allowable cost incurred under the order; and
(iii) In the case of a cost underrun, the amount by which the estimated cost of the order may be reduced to recover excess funds.
(5) In the event that less than 100% of the established level of effort of a term order (or if said level of effort has been previously revised upward, of the fee bearing portion of the additional hours by which the level of effort was last increased) is actually expended by the completion date of the contract, the Government shall have the option of:
(i) Requiring the Contractor to continue performance, subject to the provisions of the "Limitation of Cost" or the "Limitation of Funds" clause, as applicable, until the effort expended equals 100% of the established Level of Effort (or of the fee-bearing portion of the last upward revision); or
(ii) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than 100% of the established Level of Effort (or the fee bearing portion of the last upward revision).
(6) In the event that the expended level of effort of a term order exceeds the established level of effort by 10% or less, but does not exceed the estimated cost of the order; the Contractor shall be entitled to cost reimbursement for actual hours expended, not to exceed the ceiling cost. The Contractor shall not be paid fixed fee, however, on level of effort in excess of 100% without complying with subsection (e)(1) above. This understanding does not supersede or change subsection (e)(1) above, whereby the Contractor and Government may agree on a change to the order level of effort with an equitable adjustment for both cost and fee.
B52 PAYMENT OF FIXED FEE - IDIQ (FEB 2004)
(a) The fixed fee specified in Section B is the maximum fee that may be paid under this contract. The Government shall pay fixed fee as provided in this clause. This fee shall be paid, subject to any adjustment required by other clauses of this contract (such as B53, PROSPECTIVE FEE RATE REDUCTION INCENTIVE), in installments at the time of each provisional payment for reimbursement of allowable cost.
(b) A fixed fee shall be established for each order issued under this contract. The fixed fee shall be established by dividing the level of effort (direct man-hours) stated in the order by the total contract level of effort (direct man-hours) and multiplying the result by the total contract fixed fee. The amount of each installment payment of fixed fee shall be determined by dividing the net direct labor hours expended during the period by the level of effort established in the order and multiplying the result by the total fixed fee established in the order.
(c) Completion Orders. The Contractor is entitled to the full fixed fee amount upon the acceptable completion of the order.
(d) Term Orders. Fee shall be paid only for hours performed, not to exceed the fixed fee amount stated in the order.
(e) Withholding. As provided in the clause entitled, Fixed Fee (FAR 52.216-8), the Contracting Officer hereby withholds 15% of all fixed fee payable until the total contract fee withheld reaches the stated maximum of $100,000. Invoices submitted under the individual orders shall indicate fixed fee withheld.
The following have been deleted:
B33 LEVEL OF EFFORT - IDIQ (SEP 2001) SEP 2006
B52 PAYMENT OF FIXED FEE - IDIQ (FEB 2004) SEP 2006
(End of Summary of Changes)
File details come from the government source that posted it. Updated .