Attachment 2 - Q&A.pdf
PDF 414 KB Posted
- Attached to
- Upgrade to Microwave Radio Network
- Solicitation number
- N66001-19-Q-6472
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - RFP_Revision 3.xlsx | XLSX spreadsheet | |
| Attachment 1 - RFP_Revision 2.xlsx | XLSX spreadsheet | |
| Attachment 1 - RFP_Revision 1.xlsx | XLSX spreadsheet | |
| Attachment 3 - Photos.pdf | ||
| JNCP.pdf | ||
| Combined Synopsis-Solicitation FINAL.pdf | ||
| Attachment 1 - RFP.xlsx | XLSX spreadsheet | |
| SOW FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N66001-19-Q-6472- Questions & Answers
• At each location, does the antenna mount to a tower, or rooftop, or other?
Answer:
Bldg 1: Roof
Bldg 50: Roof
Bldg 40: Roof
Mt. Thirst: Tower
Mt Thirst: Tower
RC II Bldg: Tower
• What are the antenna mounting heights (RAD center) at each location?
1. Bayside building 1 to ASW base building 50:
Answer: Building 1 antenna mounted to 8 foot pole on roof. ASW base antenna mounted to 6 foot pole on roof.
2. Topside building 40 to Mount Thirst (San Clemente):
Answer: Building 40 antenna attached to 25 foot pole on roof. Mount Thirst antenna on tower 75 feet high.
Mount Thirst (San Clemente) to RCII (San Clemente):
Answer: Mount Thirst antenna on tower 50 feet high. RCII antenna on tower 25 feet high.
• Can all antenna locations be reached by climbing, or are man lifts or cranes required at any of the locations?
Answer: All antennas are reachable by climbing.
• Are photos or coordinates available?
Answer: Yes, see new Attachment 2. Also Network Technicians will be available at all sites to point out microwave antennas to the winning vendor.
• Are photos available specifically of the aluminum pipe poles to be replaced at NBPL Buildings 1 and 50?
Answer: Yes, see new Attachment 2. Pipe at building 1 is 8 feet and pipe at building 50 is 6 feet. 2 inch diameter at both buildings.
Could you please tell me if the Combined Synopsis/Solicitation posted as solicitation number N6600119Q6472 on FBO contains requirements similar to any work performed currently or in the past, or will this be a new requirement? If possible, can you please provide the most recent contract or task order number?
Answer: This is a new requirement.
Reviewing N66001-19-Q-6472 with my team it appears that your solution is limited to Cambium microwave equipment. I wanted to understand whether this effort is intended to increase capacity or just replace aging equipment. There are other options out there to improve network capacity to allow for growth as network demands increase… Part of my initial concern is that the Cambium solution is not preparing the network for 5G.
Answer: This effort is replacing older antiquated equipment that is end of life end of support.
Wireless broadband equipment approved by Chief Engineer for data throughput based on future requirements.
Please provide more details regarding PVC conduit, including photos of existing conduit to be replaced if possible.
1) Please provide approximate length of conduit runs and OD of PVC conduit.
2) Please advise if junction boxes are required, and also provide any other available information regarding the PVC conduit runs.
Answer: The 1 inch PVC piping at the antenna end and when it enters the building requires replacement. No more than a foot on each side. The junction box (the antenna end) cover is hanging on by 1 screw. Extra cable from antenna to junction box is loosely hanging out. Cable needs to be pulled neatly through the junction box and cover installed. Please see new Attachment 2.