Amend 0002 Ques and Answers.docx

DOCX document 15 KB Posted

Attached to
Enviromental Services for Unmanned Maritime Systems
Solicitation number
N66001-18-T-2006
Issued by

View the file

Other files

File Type Posted
Enviro Testing PWS 20180907.docx DOCX document
Enviromental_Testing_CDRL_20180813.pdf PDF
Enviro_Testing_PWS_20180813.docx DOCX document
Enviro_Testing_PWS_20180813.docx DOCX document
Enviromental_Testing_CDRL_20180813.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N66001-18-T-2006 Government Responses to Contractor Questions

Question 1: Is any testing planned to be completed at SSC PAC in San Diego, or is all work planned to be completed at the contractor facility?

Response 1: All testing will be at the contractor facility.

Question 2: Will SSC PAC personnel be on-site for testing to operate the DUTs as well as visually inspect, unpack, assemble, and complete performance checks (complete system checkout) after environmental testing?

Response 2: Yes.

Question 3: Per CDRL A004, shall the contractor deliver separate technical reports for each test method listed in Table 1 (11 total test reports)?

Response 3: Yes.

Question 4: How samples of each DUT listed in Table 1 will undergo required testing?

Response 4: Each piece of equipment will be tested once per test.

Question 5: Which test items (Table 1) are being referred to as "spider box" and "portable charger RCU" in Table 3?

Response 5: Refer to revised statement of work. RCU is for the Portable Charging Container.

Question 6: What is the number of operating modes (operation states) for each DUT listed in Table 8?

Response 6: One (1) operating mode and it is on.

Question 7: How many interconnect and power leads/pins are present on each DUT listed in Table 8?

Response 7: Refer to the revised statement of work.

Question 8: From Table 1, the DUTs labeled "Acoustic Communications RANGER (PECP version," "Acoustic Communications Towfish," and "Power Distribution Unit (PDU)" are not specified in any subsequent test sections. Which tests will be performed on these DUTs?

Response 8: Towfish, Ranger and PDU do not require testing.

(End of Questions & Responses)