5100_2_Project_Management_Env-Safety_Review.pdf

PDF 44 KB Posted

Attached to
GENERAL DYNAMICS MODEL 7. 3M CASSEGRAIN KU-BAND SATELLITE
Solicitation number
N64267-16-R-0038
Issued by

About this file

Attachment Two - Checklist for Safety Plan in accordance with the Navy Safety and Occupational Health Program Manual

View the file

Other files

File Type Posted
JA_APPROVED_R-0038_Redacted.pdf PDF
CDRL_A001.PA32.GD_7.3M_Antenna.pdf PDF
COMBINED_16-R-0038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

NSWCCORDIV 5100/2 (REV. 10-15)

PAGE of

NSWC CORONA

PREVIOUS EDITIONS ARE OBSOLETE

PROJECT MANAGEMENT ENVIRONMENTAL & SAFETY REVIEW

1. TYPE OF REQUEST (Please select one option per form):

Note: For this form to work correctly please click the button at the top in yellow "Enable all Features" and select the "Type of Request"

3. PROJECT MANAGER INFORMATION:

3. CONTRACTOR/VENDOR INFORMATION

This form must be completed by the prime contractor program manager or vendor to identify any anticipated hazards that may be encountered while executing the statement of work onboard the installation. This information will be used to specify project requirements. Prior to beginning work on-site, contractors/vendors may be required to submit a DETAILED SITE-SPECIFIC SAFETY PLAN to the Project Manager, Contracting Office Representative (COR) and the NSWC Environmental, Safety & Health (ESH) Office. This plan shall identify procedures and methods for controlling PROJECT-SPECIFIC environmental impacts and safety hazards throughout the scope of work. In addition, hazardous material Safety Data Sheets (SDS) and copies of the contractor's safety manual/safety programs must be submitted to the Project Manager, COR, and NSWC ESH Office, upon request.

6. POTENTIAL HAZARDS ASSOCIATED TO THE CONTRACT/WORK (Check all that apply):

7. EQUIPMENT OR MATERIALS USED (Check all that apply):

8. PERMITS/PLANS REQUIRED TO ACCOMPLISH PROJECT (Check all that apply):

9. PERSONAL PROTECTIVE EQUIPMENT REQUIRED FOR HAZARDS IDENTIFIED (Check all that apply):

NOTE: ALL CONTRACTOR OPERATIONS SHALL BE IN ACCORDANCE WITH THE US ARMY CORPS OF ENGINEERS EM 385-1-1 AND ALL FEDERAL, STATE, AND LOCAL REGULATIONS.

11. CONTRACTS OFFICE REPRESENTATIVE/SERVICE REQUESTOR REVIEW:

By submitting this document, I affirm that the contractor/vendor has been informed of the need to comply with the OSHA requirements related to the identified hazards. A detailed site-specific safety plan may need to be submitted to the ESH Office depending on the scope of work and associated hazards.

12. ENVIRONMENTAL, SAFETY AND HEALTH OFFICE REVIEW:

THIS IS A CAC SIGNED ELECTRONIC FORM AND THE RECORD COPY MUST BE MAINTAINED ELECTRONICALLY. CAC SIGNED PRINTED VERSIONS OF THIS FORM ARE NOT VALID RECORDS. IF THE FORM CANNOT BE CAC SIGNED, ALL SIGNATURES MUST BE PEN & INK. IF PEN & INK AND CAC SIGNATURES ARE MIXED ON THE FORM, THE FORM IS INVALID. RECORD COPIES OF THIS FORM WILL BE MAINTAINED BY CODE 102 IAW SECNAV M-5210.1.

9.0.0.2.20120627.2.874785

CurrentPage:
PageCount:
CONT_Form:
GOV_Form:
Date format is mmm dd, yyyy: Oct 29, 2015
Enter the full name of the contractor / vendor:
Enter the title of the contractor / vendor:
Enter the phone number of the contractor / vendor:
Enter the department that the government employee works in:
Enter the full name of the contractor / vendor:
Enter the title of the contractor / vendor:
Enter the phone number of the contractor / vendor:
Enter the company name for the contractor / vendor:
Enter the name of the government employee POC for the project:
Enter the department that the government employee works in:
Enter the government employee's phone number:
Service:
Maintenance:
Construction:
Install:
Material_Support:
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
Other: 0
txt_oTHER:
Enter the scope of work for the project:
Hazardous_Material: 0
Fire_Hazards: 0
Confined_Space: 0
Fall_Hazards: 0
Electrical_Hazards: 0
Dust_Hazard: 0
Machine_Guarding: 0
Welding_Cutting: 0
Energy_Control: 0
Floor_Wall_Openings: 0
Traffic_Control: 0
Walk_Work_Surfaces: 0
Asbestos_Hazard: 0
Heavy_Equipment: 0
Material_Handling: 0
Roofing_Hazards: 0
Lockout_Tagout: 0
Demolition: 0
Public_Protection: 0
Radiation_Hazards: 0
Laser_Hazards: 0
Energetic_Materials: 0
Afloat_Hazard: 0
Manual_Lifting: 0
Explosive_Hazard: 0
Eye_Hazard: 0
Noise_Hazard: 0
Visibility_Hazard: 0
None_Apply: 0
txt_oTHER1:
Scaffolding: 0
Scissor_Lift: 0
Boom_Lift: 0
Crane: 0
Forklift: 0
Stairways: 0
Temp_Power: 0
Ladders: 0
Barricades: 0
Shoring_Equip: 0
Boat_Watercraft: 0
HAZMAT_Locker: 0
txt_oTHER2:
txt_oTHER3:
Hearing_Protection: 0
Hearing_Protection: 0
Hearing_Protection: 0
Hard_Hat: 0
Safety_Glasses: 0
Face_Shield: 0
Splash_Goggles: 0
Gloves: 0
Dust_Mask: 0
Respirator: 0
Safety_Vests: 0
Fall_Protection: 0
Anchor_Devices: 0
Safety_Footwear: 0
Does this project require modification to an existing structure?:
Yes:
No:
Does this project require modification to an existing structure?:
Does this project require modification to an existing structure?:
Does this project require modification to an existing structure?:
Does this project require modification to an existing structure?:
Does this project require modification to an existing structure?:
Signature_COR:
Date-COR:
Does this project require modification to an existing structure?:
Signature_ESH1:
Date-esh1:

File details come from the government source that posted it. Updated .