About this file

This document outlines a Quality Assurance Surveillance Plan (QASP) for the solicitation N6339421R0001 for FY21 AN/SPS 77/80 Radar System engineering, technical, and material support services. The QASP defines performance standards and acceptable quality levels for services provided, deliverable products, data deliverables, packing and shipment of equipment and materials, and costs. Performance will be monitored annually through methods such as random inspections, customer surveys, and operational testing to determine ratings in the Contractor Performance Assessment Reporting System.

View the file

Other files for this federal contract opportunity

Other files attached to FY21 AN/SPS 77/80 Radar System, newest first.
File Type Posted
N63394-21-R-0001 Amendment 03.doc DOC document
N6339421R0001_Exhibit A CDRL s Consolidated_20210211.pdf PDF
N6339421R0001 Solicitation_20210325.doc DOC document
N6339421R0001_Attach J4_Key Personnel Requirements_20200910.docx DOCX document
N6339421R0001_Attach J1 DD254_20210120.pdf PDF
N6339421R0001_Attach J6_Staffing Matrix_20210216.xls XLS spreadsheet
N6339421R0001_RFP Letter_20210325.pdf PDF
N6339421R0001_Attach J5_Cost Summary_20210216.pdf PDF
N6339421R0001_Attach J2_eCRAFT Crosswalk_20210128.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version: 01 04/07/10

SOLICITATION N00024-15-R-3550

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Statement of Work (SOW) entitled AN/SPS-77 and AN/TPS-80 Radar Engineering, Technical, and Material Support Services. This plan sets forth the procedures and guidelines the Ship Defense Expeditionary Warfare Department, Virginia Beach Detachment, Virginia Beach, Virginia, will use in ensuring the required performance standards or services levels are achieved by the contractor.

Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the SOW and to ensure that the Government pays only for the level of services received.

This QASP defines member roles and responsibilities, identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

Performance Management Approach This QASP will define the management approach taken by the Ship Defense Expeditionary Warfare Department to monitor and manage the contractor’s performance to ensure the expected outcomes or objectives communicated in the SOW are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. Performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the performance as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

Performance Management Strategy The contractor is responsible for the quality of all work performed. Quality control is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative.

The contractor’s evaluation of performance will cover the period ending 60 months after date of contract award with successive evaluations being performed for each twelve-month period thereafter until the contractor completes performance of the contract. For the first period and each subsequent twelve-month period, the Government will evaluate the contractor’s performance. The evaluation will encompass all work performed by the contractor at any time during the twelve-month period but will not include cumulative information from prior reports. For each period, the contractor will complete a self- assessment of the performance provided, to be delivered to the contract specialist no-later-than (NLT) 60 days prior to the end of the current period of performance. The self-assessment shall cover all areas of the Government QASP. Based on the evaluation results, the contracting officer will assign an overall performance rating.

The Government will assess performance using Contractor Performance Assessment Reporting System (CPARS) to determine how the contractor is performing against communicated performance objectives. CPARS assesses a contractor’s performance, both positive and negative, and provides a record on a given contract during a specified period of time. More information pertaining to CPARS can be found at: https://www.cpars.gov/ Each assessment will be based on objective data (or measurable, subjective data when objective data is not available) supportable by program and contract management data. CPARS performance expectations will be addressed in the Government and contractor’s initial post-award meeting. Potential sources of data may include, but are not limited to, the following:

· Contractor operations reviews

· Status and progress reviews

· Production and management reviews

· Management and engineering process reviews (e.g. risk management, requirements management, etc.)

· Cost performance reports and other cost and schedule metrics

· Other program measures and metrics such as:

· Measures of progress and status of critical resources

· Measures of product size and stability

· Measures of product quality and process performance

· Customer feedback/comments and satisfaction ratings

· Systems engineering and other technical progress reviews

· Physical and functional configuration audits

· Quality reviews and quality assurance evaluations

· Functional performance evaluations

· Subcontract Reports

ROLES AND RESPONSIBILITIES

Contracting Officer (KO) The contracting officer (KO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. The KO shall assure the contractor receives impartial, fair and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contract Specialist The contract specialist is an individual assigned by the KO to assist in the daily administration of the contract. The contract specialist also provides input to the KO and the COR as to the quality of performance for areas addressed in this QASP.

Contracting Officer’s Representative (COR) The contracting officer’s representative (COR) is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

PERFORMANCE STANDARDS

The required performance standards are included in the SOW and in Table 1, “Performance Standards.” If the contractor meets the required service or performance level, the contractor will receive positive ratings. If the contractor fails to meet the required performance level, the result will be negative ratings.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate the contractor performance when appropriate. The COR will use the following methods of surveillance:

· Random monitoring

· 100% Inspection

· Periodic Inspection

· Customer Survey

· User/Customer Complaints Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the KO, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints, investigate and work with the KO and the contractor to resolve the issue.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

Acceptable Quality Levels The acceptable quality levels (AQLs) included in Table 1 for contractor performance are structured to allow the contractor to manage how the work is performed.

DOCUMENTING PERFORMANCE

Performance Management The COR shall maintain copies of all reports, evaluations, recommendations, and any actions related to contract performance in the COR file for this contract. All records shall be maintained for the life of this contract.

Monitoring System The Government’s QA surveillance will be reported using CPARS. CPARS evaluations shall be conducted on an annual basis.

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

Determining Performance The Government shall use the monitoring methods cited to determine whether the performance standards and AQLs have been met. If the contractor has not met the minimum requirements the contractor will receive a negative CPARS review.

Reviews and Resolution Upon review and signature of the CPAR the contractor will be notified and given the opportunity to review and comment to indicate concurrence/non-concurrence. If the contractor does not concur, the contracting officer shall review all relevant documentation and will work to resolve disagreements between the COR’s recommendations and the contractor’s comments/report regarding the evaluation. The contracting officer’s performance determination is unilateral and final. The contracting officer will document the determination and provide a copy to the contractor.

SURVEILLANCE OF PERFORMANCE STANDARDS

Table 1 provides standards that will be used to measure contractor performance. The contractor performance will be measured on an annual basis, at a minimum, by the Government and depending upon performance, the contractor will receive either a positive or negative CPARS rating. CPARS ratings are used for future source selection evaluations.

TABLE 1: PERFORMANCE STANDARDS

PERFORMANCE STANDARDS TABLE

PERFORMANCE INDICATORS
PERFORMANCE STANDARDS
ACCEPTABLE QUALITY LEVELS (AQL)
SURVEILLANCE METHODS
Services Provided
Services comply with all procedures, schedules, and requirements specified in tasking guidance above. Where specific procedures are not identified in this SOW, the contractor shall comply with standard business practices for the type and quantity of services to be provided.
(1) All services are completed within schedule not less than 90% of the time and are completed NMT 5 working day late 100% of the time. (2) Services are completely accurate in their technical aspects not less than 1% of the time; contain minor inaccuracies and defects not affecting safety NMT 5% of the time; and contain major inaccuracies or defects not affecting safety NMT 1% of the time. Services contain no inaccuracies and defects adversely affecting safety 100% of the time.
Visual observation; and Sailor, Fleet and Sponsor feedback.
Deliverable Products
Deliverable products are properly provided on schedule IAW tasking guidance above. Classification and distribution markings, safety statements, and other warnings and instructions are complete, accurate and legible.
(1) Products are properly provided on schedule lAW tasking guidance above NLT 85% of the time, are NMT 5 working days late NLT 1% of the time and are NMT 15 working days late 100% of the time. (2) Classification markings are accurate, complete and legible not less than 100% of the time. (3) Distribution markings affecting technology export control are accurate, complete and legible NLT 100% of the time. (4) Distribution markings not affecting technology export control are accurate, complete and legible NLT 85% of the time; markings contain minor inaccuracies but are still understandable NMT 10% of the time; and markings are present 1% of the time. (5) Safety statements and warnings are accurate, complete and legible NLT 100% of the time. (6) Warnings and instructions not affecting safety are accurate, complete and legible NLT 90% of the time; contain minor errors and omissions NMT 5% of the time; and contain major errors and omissions NMT 1% of the time. (7) Technical content is complete and accurate NLT 90% of the time; contains minor errors and omissions not affecting safety NMT 5% of the time; and contains major errors not affecting safety NMT 1% of the time. Technical content contains NMT one major error or omission not affecting safety 1% of the time and contains no errors and omissions adversely affecting safety 100% of the time.
Visual inspection; Sailor, Fleet and Sponsor feedback; and operational tests of equipment
Data Deliverables
Data Deliverables are properly provided on schedule as specified in tasking guidance.
(1) Data are provided on schedule NLT 90% of the time; are provided NMT 5 working days late NLT 1% of the time; and are provided NMT 15 working days late NLT 100% of the time. (2) Data deliverables are provided in the format specified in tasking guidance above NLT 1% of the time; in a different but compatible format NMT 5% of the time; and in an incompatible but still usable format NMT 2% of the time. (3) Classification markings are accurate, complete and legible NLT 100% of the time. (4) Distribution markings affecting technology export control are accurate, complete and legible NLT 100% of the time. (5) Distribution markings not affecting technology export control are accurate, complete and legible NLT 85% of the time; markings contain minor inaccuracies but are still understandable NMT 10% of the time; and markings are present 1% of the time. (6) Safety statements and warnings are accurate, complete and legible NLT 100% of the time. (7) Warnings and Instructions not affecting safety are complete, accurate and legible NLT 90% of the time; contain minor errors and omissions NMT 5% of the time; and contain major errors and omissions NMT 1% of the time. (8) Technical content is complete and accurate NLT 90% of the time; contains minor errors and omissions not affecting safety NMT 5% of the time; and contains major errors not affecting safety NMT 1% of the time. Technical content contains NMT one major error or omission not affecting safety 1% of the time and contains no errors and omissions adversely affecting safety 100% of the time. (9) Distribution of classified data is per tasking guidance above NLT 100% of the time. (10) Distribution of unclassified data not affecting technology export control is per tasking guidance above NLT 1% of the time; is to the incorrect destination within the US.
Visual inspection; Sailor, Fleet and Sponsor feedback; and operational tests of software.
Packing and Shipment of Equipment and Materials
Shipping of equipment and materials, if necessary to the completion of this requirement, shall be lAW tasking guidance. Absent appropriate guidance in these paragraphs, the contractor shall use acceptable industry standards in packing, handling, shipping and transferring equipment and materials.
Classified equipment and material are shipped to the correct destinations NLT 99% of the time; are shipped to incorrect destinations capable of properly protecting their contents from unauthorized disclosure NMT 1% of the time; and are never shipped to incorrect destinations unable to properly protect their contents from unauthorized disclosure. (2) Unclassified equipment and materials are shipped to the correct destinations 98% of the time; are shipped to incorrect destinations not in violation of technology export controls and from which they may be retrieved intact NMT 2% of the time; and are never shipped to incorrect destinations in violation of technology export controls. (3) Equipment is packed lAW accepted industry standards NLT 98% of the time; and is packed to lesser standards but received undamaged NMT 2% of the time.
Visual Inspection; operation test of equipment; and Sailor, Fleet, and Sponsor feedback.

(4) Shipment of classified equipment and material to US Government destinations is by US carrier NLT 100% of the time unless waived by the Government. Shipment of classified equipment and material to FMS destinations is lAW applicable security guidance NLT 100% of the time.

Costs
Cost billed to the Government is accurate and shall not exceed pricing contained in this contract.
Materials and other non-travel ODCs billed to the Government are within 5% of costs contracted in this procurement, excepting such costs that are substantially driven by the cost of motor fuels; at least 80% of the time, are within 20% of contracted costs 100% of the time. (2) Travel ODCs billed to the Government are within 10% of cost contracted in this procurement, excepting such costs that are substantially driven by the cost that are substantially driven by the cost of motor fuels, NLT 80% of the time are within 25% of contracted costs 100% of the time. (3) Labor hours billed to the Government are IAW rates contracted in this procurement NLT 1% of the time and are within 10% of contracted rates 100% of the time. Labor expenditure rates are within 5% of planned expenditure rates contracted in this procurement NLT 1% of the time and are within 10% of contracted expenditure rates 100% of the time.
Contractor reports; DFAS reports; invoices

Controlled Document – When printed, this document is not controlled.