J-4_Pricing_Spreadsheet_Howard.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USS HOWARD (DDG-83) Dry-docking Availability Federal contract opportunity
Solicitation number
N55236-16-R-0023
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment J-4 Work Item Pricing Labor and Material Burden Rates

View the file

Other files for this federal contract opportunity

Other files attached to USS HOWARD (DDG-83) Dry-docking Availability, newest first.
File Type Posted
HOWARD_DD_J__A_(rev_9)_Redacted.pdf PDF
Amendment_0001.pdf PDF
WI_259-12-201_Attachment_2.pdf PDF
N55236-16-R-0023_Solicitation_Amend_3.pdf PDF
J-6_Technical_Capabilites_Data_Sheet.docx DOCX document
N55236-16-R-0023_Solicitation_Amend_2.docx DOCX document
N55236-16-R-0023_Solicitation_Amend_1.pdf PDF
J-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Attachment_J-3_Request_for_Specification_Clarification_Form.doc DOC document
N55236-16-R-0023_Solicitation.pdf PDF
USS_HOWARD_Work_Items.zipx ZIPX file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Item Index

PrimeSubcontractor
Work ItemBase/OptionCOARCLINItem DescriptionLabor HoursTotal Labor ($)Material ($)PriceLabor HoursTotal Labor ($)Material ($)PriceWork Item Price
042-11-201Base16Schedule and Associated Reports; provide and manage$0$0$0
077-01-001Base16Hazardous Waste Produced on Naval Vessels; control$0$0$0
110-21-201Base16Auxiliary Machinery Room No. One Structural Framing; repair$0$0$0
110-21-202Base16Auxiliary Machinery Room No. 2 Structural Framing; repair$0$0$0
110-21-203Base16Power Supply Conversion Room Structural Bulkhead Plating;repair$0$0$0
110-21-204Base16Sonar Cooling Equipment Room No. 3 Structural Framing; repair
110-21-205Base16Sonar Cooling Equipment Room (4-42-0-Q) Structural Framing; repair$0$0$0
243-11-206Base16Port Propulsion Shafting; inspect and repair$0$0$0
245-12-201Base16Controllable Pitch Propeller (CPP) Prairie Air Tube and Valve Rod Assembly; repair and test$0$0$0
245-12-202Base16Controllable Pitch Propeller (CPP) Hydraulic System; clean, inspect and flush$0$0$0
245-12-203Base16Controllable Pitch Propeller (CPP) System, Propeller Hub; replace$0$0$0
245-12-204Base16Controllable Pitch Propeller (CPP) System, Propeller Blade; inspect and assess$0$0$0
245-12-205Base16Controllable Pitch Propeller (CPP) Oil Distribution Box; repalce$0$0$0
259-11-201Base162A and 2B Gas Turbine (GTRB) Exhaust Duct Collector; repair$0$0$0
259-11-202Base161B Gas Turbine (GTRB) Exhaust Duct Collector; repair$0$0$0
980-31-201Base16SWRMC Maintenance Team Office Space; provide$0$0$0
991-11-001Base16Title: AN/SPY-1D Radar Array Face Resurfacing Support Services; provide$0$0$0
992-11-001Base16Temporary Service; provide$0$0$0
992-11-202Base16Ship's Force Parking; provide$0$0$0
992-11-208Base16Defuel and Refuel Ship; accomplish$0$0$0
992-31-001Base16Cleaning and Pumping; accomplish$0$0$0
993-21-202Base16Rigging and Crane Service for ship's force use; provide$0$0$0
997-11-001Base16Drydocking and Undocking; accomplish$0$0$0
Total Work Item Price0$0.00$0.00$0.000$0.00$0.00$0.00$0.00

Labor&Material Burden Rate

RatePrice
Hours$($ * hours)
Direct Production14,400$0
Material$114,408
Material Burden RateInsert Rate ->
Total Material Price =Material * (1+ Material Burden Rate)$114,408

Proposed Labor & Material Burden Rate Growth Price $114,408

The excel file has imbedded formulas. Offeror shall insert proposed rates in the highlighted cells in the format provided, with the formulas maintained.

The number of hours and material dollar values are for evaluation purposes only. While the hour and material dollar values are based on historical data and are indicative of the number of hours and the dollar value of material typically required for growth on an average Availabilities on a DDG 83 class ship, the proposed labor and material burden rates will be the fixed rates for the entire availability regardless of how many hours and how much material are procured.

Total Proposed-Evaluated Price

Total Proposed/Evaluated Price
Total Work Item Price$0
Proposed Labor & Material Burden Rate Growth Price$1,029,422
Award Fee
Interport Differential (if applicable as stated in Section L)
Total Evaluated Price$1,029,422