Attachment-B_(NAVSEA_CAT_I).pdf

PDF 52 KB Posted

Attached to
Repair Availability of 13 Each Brows
Solicitation number
N55236-15-Q-0143
Issued by

About this file

NAVSEA CAT I

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT-B:

SWRMC C370 SMALL BOATS & YARD CRAFTS NOT

APPLICABLE NAVSEA STANDARD ITEMS CAT-I

The following Category I NAVSEA STANDARD ITEMS are not applicable & will not be invoked:

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities;

provide 009-18 Magnetic Material; control 009-19 Provisioning Technical Documentation (PTD); provide 009-21 Logistics and Technical Data; provide 009-29 Asbestos-Free Pipe Hanger Liner Material; install 009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire

Watches, and Housekeeping; accomplish 009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for

Commercial Equipment/Component; provide 009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material

Handling Equipment at Naval Facilities; accomplish 009-59 Organotin Antifouling Materials; control 009-61 Shipboard Use of Fluorocarbons; control 009-64 Synthetic Fire Resistant Hydraulic Fluid; control 009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 009-77 Cofferdam Requirements; accomplish 009-80 Ship's Facilities; provide 009-84 Accountability of Temporary Fasteners; provide 009-87 Chlorination Procedures; accomplish 009-88 Collection, Holding, and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify 009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish 009-95 Mechanically Attached Fittings (MAFs) for Piping Systems; install 009-100 Ship's stability process control procedure (PCP); maintain 009-101 Requirements for Mooring, Entry to, and Departure from Contractor's Facility;

accomplish 009-106 Work Authorization Form Coordinator (WAFCOR); provide 009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within &

Departure from Contractor's Facility; accomplish 009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish 009-110 Special Requirements for Non-Nuclear work on Nuclear Vessels; accomplish 009-112 Prevention of Radiographic Inspection Ionizing-Radiation Hazards; accomplish 009-117 AEGIS Light-Off (ALO) Support for AEGIS Weapons Systems; provide 009-118 CG Deck Loading; accomplish 009-120 Fact Finding & Critiques of Unplanned Events; manage 009-121 Ship Assessment/Inspection Requirements; provide

File details come from the government source that posted it. Updated .