Caisson 3
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | Caisson 3 | DATE: = | 12/6/18 | ||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availabillity Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | CFR Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental & Hazwaste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22 | General Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.23 | Reservation Tasking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting & Alignment of Docking Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Stability Calculations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.13 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Identify Distinguishing Figures & Markings-Hull | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Zinc Anodes- Hull | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Boarding Ladders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Rubber Seal Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Rubber Seal Joint-Filler Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.7 | Hull & Freeboard Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.8 | Hull & Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.9 | Flood Thru Cover Plate/Flange Screen Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.10 | Hull & Freeboard Pre-Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.11 | Hull & Freeboard Final Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Pedestrian Ramp Hinges Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas Free, & Close Tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Identify Color Schemes & Markings-Tanks & Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Tank & Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Zinc Anodes-Tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Tank & Void Access Ladders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Main & Trim Tank Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Main & Trim Tank Access Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Botled Watertight Hatch Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.9 | Superflood & Dewatering Pump Hatch Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.10 | Tanks & Voids Pre-Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.11 | Tanks & Voids Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Identify Color Schemes & Markings-Weather Deck | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Weather Deck Non-skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Visual Inspection Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.4 | Escape Hatch Repair & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.5 | Roller Chock Inspection & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.6 | Portable Handrail & Lifeline System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.7 | Weather Deck Lighting Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.8 | Access Enclosure Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1 | Dewatering Pump & Motor Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.2 | Dewatering Pump Assembly Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.3 | Wear, Fit, & Defect Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.4 | Impeller & Casing Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.5 | Dewatering Pump Assembly & Alignment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.6 | Superflood Pump & Motor Removals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.7 | Superflood Pump Assembly Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.8 | Wear, Fit, & Defect Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.9 | Impeller & Casing Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.10 | Superflood Pump Assembly & Alignment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.11 | Ventilation/Air Handler System Repair & Service | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.12 | Capstan Motor/Gear Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.1 | Dewatering Pump Motor Inspection & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.2 | Dewatering Pump Motor Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.3 | Dewatering Pump Motor No-Load Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.4 | Assemble Dewatering Motor/Pump Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.5 | Dewatering Pump Motor Installation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.6 | Operational Testing Dewatering Pump/Motor Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.7 | Superflood Pump Motor Inspection & Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.8 | Superflood Pump Motor Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.9 | Superflood Pump Motor No-Load Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.10 | Assemble Superflood Motor/Pump Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.11 | Superflood Pump Motor Installation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.12 | Operational Testing Superflood Pump/Motor Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.1 | Remote Valve Operator Extension Shaft Assemblies | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.2 | Flood Thru Valve Steady Bearing Grease Lines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.3 | Valve Actuator Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.4 | Valve Actuator Operational Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.5 | Valve Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.6 | Operational Testing of Valves | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.7 | Superflood/Dewatering Check Valve Inspect/Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.2 | Dock Trials | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | 100 | G&A Rate: | 10.00% | Profit Rate: | ||||||
| Non RT Total Bid: | $0.00 | ||||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 3.2.12 | Hull Repairs- Reservation Tasking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.4.12 | Tanks & Voids Reservation Tasking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3.6.13 | Machinery Systems Reservation Tasking | ||||||||||
| 3.7.13 | Electrical Systems Reservation Tasking | ||||||||||
| 3.8.8 | Piping Repairs Reservation Tasking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Reservation Tasking (RT) Total Bid: | $0.00 | ||||||||||
| Total Bid: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) =(MH*Labor Rate)+Material Price =Sub Cost (F) =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it.