RFC_Caisson_UPDATED_12.19.18.pdf
PDF 649 KB Posted
- Attached to
- Caisson 3 Federal contract opportunity
- Solicitation number
- N4523A19R1058
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_J-3_(RFC)_deep_water_pumps.pdf | ||
| Attachment_J-7__FBO_upload_Guide.pdf | ||
| N4523A19R10580001_Amendment_1.pdf | ||
| Attchment_J-1_SOW_Caisson_3_Rev_1_12-6-18.pdf | ||
| Attachment_J-2_Price_Proposal_Worksheet__Caisson_3_Rev1_12-6-18.xls | XLS spreadsheet | |
| N4523A19R1058_Caisson_3_RFC_001_-_009.pdf | ||
| caisson3_Drawings_Zip.zip | ZIP file | |
| Exhibit_A_CDRLS_A001_through_A022.pdf | ||
| Attachment_J-2_Price_Proposal_Worksheet_N4523A19R1058.xls | XLS spreadsheet | |
| Attachement_J-1_Statement_of_Work_Caisson_3_N4523A19R1058.pdf | ||
| Attachment_J-5_Corporate_Experience_Data_Sheet_N4523A19R1058.docx | DOCX document | |
| Attachment_J-6_References.zip | ZIP file | |
| N4523A19R1058.pdf | ||
| Attachment_J-4_Contract_Performance_Data_Sheet_N4523A19R1058.docx | DOCX document | |
| Attachment_J-3_Request_for_Clarification_(RFC)_Form_N4523A19R1058.docx | DOCX document | |
| SOW_Caisson__3.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 010
REQUIREMENT: Bidders Questions REQUISITION NO.: N4523A19R1058
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
TITLE: Bidders Questions Connor Theisen: (360) 476-5708 connor.theisen@navy.mil
PARA. NO: PLANNER’S PAGE NO: 1 CONTRACTOR:
NAME: ATTACH. NO: N/A CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
In the Statement of Work for Caisson 3, Section 3.0 Work Requirements, 3.1 Docking & Undocking the
Vessel, 3.1.3 Blocking Plan refers to drawing 70108 (A-9) for guidance on developing the Blocking
Plan. There are 2 positions called out on the drawing, which position will be used for the dry docking?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: BESAW SERIAL NO:
Dock Caisson 3 in block position 1.
mailto:connor.theisen@navy.mil
DATE OF REQUEST: 12/10/2018 QUESTION NO: 011
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Vessel, 3.1.6 Stability Calculations, requests to calculate docking stability. May we please have the trim & stability booklet for the Caisson 3 to assist with developing these docking calculations
DO NOT WRITE BELOW THIS LINE
TECHNICAL REVIEW: BESAW
SERIAL NO:
Page A-10 (70109) of drawing 1600263 Rev B shows the curves of form for the Caisson
DATE OF REQUEST: 12/10/2018 QUESTION NO: 012
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
In the Statement of Work for Caisson 3, Section 1.0 General Requirements, 1.7 Availability
Requirements, there is no mention of a telephone installed in the office, is this intentional?
DO NOT WRITE BELOW THIS LINE
A telephone in the office is not necessary due to government representatives being provided cellular phones for communication purposes.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 013
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
In the Statement of Work for Caisson 3, Section 1.0 General Requirements, 1.13 Interferences, “Contractor pricing offered shall include removal and reinstallation of all interferences associated with performance of the required work… A physical check of each work site prior to bid submittal is strongly encouraged.” Since no ship check was available and item 1.12 is not on the pricing sheet, shall we include pricing interference removal as Inspect & CFR for the interferences under item 1.11?
DO NOT WRITE BELOW THIS LINE
TECHNICAL REVIEW:
Interested offerors should only account for interferences that can be ascertained from the statement of work and included references/drawings. Interferences that cannot be identified until after work begins shall be addressed using the CFR/RCC process identified in section 1.11 of the statement of work.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 014
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Attachment J-2 Proposal Worksheet N4523A19R1058 – references 1.19 Weight Control, but the the
Statement of Work for Caisson 3, Section 1.0 General Requirements does not mention the requirement. Will we be required to submit a weight control report? How often? (1.19 says “Label
Plates” in the SOW)
DO NOT WRITE BELOW THIS LINE
Weight Control Reports are required when the configuration of a vessel is changed or a replacement of resulting in a weight change of 10 lbs or more. The report would only be required prior to undocking. [Submitted and APPROVED prior to undocking]
DATE OF REQUEST: 12/10/2018 QUESTION NO: 015
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Attachment J-2 Proposal Worksheet N4523A19R1058 – references 1.21 Logistics Product Data, but the the Statement of Work for Caisson 3, Section 1.0 General Requirements does not mention the requirement.
DO NOT WRITE BELOW THIS LINE
Section 1.21 referencing “Logistics Product Data” on the J-2 has been removed and now reflects 1.21-Gas Free for the J-2 and Statement of Work.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 016
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
PARA. NO: PAGE NO: 1 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: N/A CONTRACTOR POC & PHONE:
Note Attachment J-2 Proposal Worksheet N4523A19R1058 – references 1.22 Gas Free, but it is 1.21 in the SOW
DO NOT WRITE BELOW THIS LINE
J-2 Proposal Worksheet now references section 1.21 as “Gas Free.”
DATE OF REQUEST: 12/10/2018 QUESTION NO: 017
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Note Attachment J-2 Proposal Worksheet N4523A19R1058 – references 1.23 General Requirements for
Testing, but it is 1.22 in the SOW
DO NOT WRITE BELOW THIS LINE
J-2 Proposal Worksheet now references section 1.22 as “General Requirements for Testing.”
DATE OF REQUEST: 12/10/2018 QUESTION NO: 018
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Note Attachment J-2 Proposal Worksheet N4523A19R1058 – references 3.1 but there is nothing for that line item to price
DO NOT WRITE BELOW THIS LINE
Section 3.1 has been removed from the J-2 Proposal Worksheet.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 019
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Note Attachment J-2 Proposal Worksheet N4523A19R1058 – references 3.1.6 Docking Conference, but the specification has 3.1.6 listed as Stability Calculations
DO NOT WRITE BELOW THIS LINE
The J-2 Proposal Worksheet and Statement of Work now both reflect section 3.1.6 as “Stability Calculations.”
Section 3.1.7 references “Docking Conference” for the J-2 and Statement of Work.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 020
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Note Attachment J-2 Proposal Worksheet N4523A19R1058 – references 3.1.6 Docking Conference, but the specification has it listed as 3.1.7 (similarly 3.1.7 is 3.1.8 in spec, 3.1.8 is 3.1.9 in spec, 3.1.9 is 3.1.11 in spec etc).
DO NOT WRITE BELOW THIS LINE
All sections/line items included in the J-2 Proposal Worksheet reflect their respective specification in the Statement of Work.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 021
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Note Attachment J-2 Proposal Worksheet N4523A19R1058 has no line item for 3.1.13 Final Docking report
DO NOT WRITE BELOW THIS LINE
The J-2 Proposal Worksheet now includes line item 3.1.13 “Final Docking Report.”
DATE OF REQUEST: 12/10/2018 QUESTION NO: 022
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
In the Statement of Work for Caisson 3, Section 3.2.3 Zinc Anodes seems to be a duplicate of Section 3.4.4
Zinc Anodes however the quantities do not match. Please clarify if these are duplicate sections or intentionally separate. Neither section is labeled properly on the Attachment J-2 Proposal Worksheet
N4523A19R1058
DO NOT WRITE BELOW THIS LINE
Section 3.2.3 is referring to the Zinc Anodes that are currently affixed to the hull (Exterior).
Section 3.4.4 is referring to the Zinc Anodes that are currently affixed to the Trim and Main tanks (Interior).
The J-2 Proposal Worksheet reflects section 3.2.3 as “Zinc Anodes-Hull”.
The J-2 Proposal Worksheet reflects section 3.4.4 as “Zinc Anodes-Tanks”.
The quantity of zincs differ between the Exterior and Interior. * Refer to drawing 70107 (A-8) under “NOTES”. Quantities are given.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 023
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
In the Statement of Work for Caisson 3, Section 1.23 Manhour and Material Reservation Tasking is not listed on the Attachment J-2 Proposal Worksheet N4523A19R1058
DO NOT WRITE BELOW THIS LINE
Section 1.23 “Man-hour and Material Reservation Tasking” is now listed on the J-2 Proposal Worksheet.
The J-2 also includes a separate line-item breakdown of specific Reservation Tasking items.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 024
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
The Attachment J-2 Proposal Worksheet N4523A19R1058 mentions 3.2.7 Hull & Freeboard UT, but this section is not listed in the Statement of Work for Caisson 3. Will there be UT gauging required on the
Caisson in addition to NDT on any new welds? If so, please send the specification details.
DO NOT WRITE BELOW THIS LINE
Section 3.2.7 now reflects “Hull and Freeboard Blasting and Preservation” on the J-2 Proposal Worksheet and Statement of Work.
Ultrasonic Testing is NOT required for Caisson #3.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 025
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
The Attachment J-2 Proposal Worksheet N4523A19R1058 mentions 3.2.8 Skeg Repair, but this section is not listed in the Statement of Work for Caisson 3. Will there be skeg repair? If so, please send the specification details.
DO NOT WRITE BELOW THIS LINE
Section 3.2.8 now reflects “Hull and Freeboard Visual Inspection” on the J-2 Proposal Worksheet and Statement of Work.
Skeg repair(s) are not a specification included in the J-2 or Statement of Work and have been removed.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 026
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
The Attachment J-2 Proposal Worksheet N4523A19R1058 mentions 3.4.4 Tank Air Test & 3.4.6 Tank
Final Air Test, but there is no mention of tank air testing in the Statement of Work for Caisson 3. Will there be tank air testing and if so, please send the specification details.
DO NOT WRITE BELOW THIS LINE
Section 3.4.4 now reflects “Zinc Anode-Tanks” on the J-2 and Statement of Work.
Section 3.4.6 now reflects “Main and Trim Tank Blasting and Preservation” on the J-2 and Statement of Work.
There will be NO Tank Air Test(s) or Tank Final Air Test(s) to be performed.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 027
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
NAME:SY ATTACH. NO: N/A CONTRACTOR POC & PHONE:
The Statement of Work for Caisson 3 mentions sections 3.4.5 Tank Access Ladders, 3.4.7 through 3.4.9
WT Hatch Preservation, which are not listed on the Attachment J-2 Proposal Worksheet N4523A19R1058
DO NOT WRITE BELOW THIS LINE
Section 3.4.5 “Tank Access Ladders” is now listed on the J-2 Proposal Worksheet.
Sections 3.4.7 through 3.4.9 are now listed on the J-2 Proposal Worksheet.
3.4.7 – “Main and Trim Tank Access Watertight Hatch Preservation”
3.4.8 – “Bolted Watertight Hatch Preservation”
3.4.9 – “Superflood and Dewatering Pump Bolted Watertight Hatch Repairs”
DATE OF REQUEST: 12/10/2018 QUESTION NO: 028
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
The Statement of Work for Caisson 3 mentions section 3.4.12 Tanks/Voids Reservation Tasking is not listed on the Attachment J-2 Proposal Worksheet N4523A19R1058
DO NOT WRITE BELOW THIS LINE
Section 3.4.12 “Tanks & Voids Reservation Tasking” is now on the J-2 Proposal Worksheet in the Reservation Tasking section.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 029
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
The Statement of Work for Caisson 3 does not correlate with the Attachment J-2 Proposal Worksheet
N4523A19R1058 for sections 3.5 & 3.6 & 3.7 & 3.8 & 3.9 & 3.10
DO NOT WRITE BELOW THIS LINE
Sections 3.5, 3.6, 3.7, 3.8, 3.9, and 3.10 now correlate with the J-2 Proposal Worksheet.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 030
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
The Attachment J-2 Proposal Worksheet N4523A19R1058 mentions sections 3.11 & 3.12 which do not exist in the Statement of Work for Caisson 3
DO NOT WRITE BELOW THIS LINE
Sections 3.11 and 3.12 have been removed from the J-2 Proposal Worksheet.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 031
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Can we undock the vessel prior to final testing of all systems?
Accomplish the requirements of section 3.10.2 “Dock Trial” in the Statement of Work prior to undocking the vessel.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 032
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
1) Does drydock need to be NAVSEA certified?
No, as a Caisson is not a NAVSEA SHIP, the dry dock does not need NAVSEA certification.
DATE OF REQUEST: 12/10/2018 QUESTION NO: 033
ITEM NO: N/A ISSUING OFFICE POC (CODE 440.22):
Vessel, 3.1.1 Personnel and equipment, 3.1.1.1 “A Dock Master currently qualified and certified by the
Contractor and accepted by the Government Docking Observer (GDO)” – We would like to know what is required for our Dock Master to be accepted by the Government Docking Observer (GDO)?
DO NOT WRITE BELOW THIS LINE
As a Caisson is not a NAVSEA SHIP, the dock master does not need to be NAVSEA certified.
DATE OF REQUEST: 12-14-2018 QUESTION NO: 014
REQUIREMENT: 3.8 Piping Systems REQUISITION NO.: N4523A19R1058
ITEM NO: 3.8.4
TITLE: Valve Actuator Repair
ISSUING OFFICE POC (CODE 440.22):
Connor Theisen: (360) 476-5708
PARA. NO: 3.8.4.1 PAGE NO: 60 CONTRACTOR: Puglia
Engineering/Fairhaven Shipyard
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE: Gary
Dura 360.647.0080 x 227
CONTRACTOR QUESTION: For bidding purposes the Actuator OEM, Emerson, has requested the
Model & Serials Numbers for the Actuators? Also if you could confirm the Manufacturer as being EIM as the reference drawing M-02 show?
The valve actuators are manufactured by AUMA.
MODEL # SERIAL #
SEA Valve #1 SA14.5 A0900541004
SEA Valve #2 SA14.5 A0900541001
EQUALIZER Valve #1 SA14.5 A0900541003
EQUALIZER Valve #2 SA14.5 A0900541002
SUPERFLOOD DISCH #1 SA16.1 A0900540206
SUPERFLOOD DISCH #2 SA16.1 A0900540208
SUPERFLOOD DISCH #3 SA16.1 A0900540203
SUPERFLOOD DISCH #4 SA16.1 A0900540205
FLOODTHRU Valve #1 SA16.1 A0900540201
FLOODTHRU Valve #2 SA16.1 A0900540207
FLOODTHRU Valve #3 SA16.1 A0900540203
FLOODTHRU Valve #4 SA16.1 A0900540202
DISCHARGE Valve #1 SA16.1 A0900540703
DISCHARGE Valve #2 SA16.1 A0900540704
SINKING Valve #1 SA16.1 A0900540702
SINKING Valve #2 SA16.1 A0900540704
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO LATER
THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.