Bridge_Crane_Q&A_17_May_2018.pdf

PDF 59 KB Posted

Attached to
Bridge Crane Federal contract opportunity
Solicitation number
N4523A18R1313
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Question and Answers following the site visit. More answers to follow.

View the file

Other files for this federal contract opportunity

Other files attached to Bridge Crane, newest first.
File Type Posted
Bridge_Crane_Q_and_A_31_May_2018.pdf PDF
Technical_Specification_Amendment_1.pdf PDF
Solicitation_Amendment_1.pdf PDF
Bridge_Crane_Q&A_25_May_2018.pdf PDF
Bridge_Crane_Q&A_11_May_2018.pdf PDF
Q&A_3_May_2018_-_Bridge_Crane.pdf PDF
Past_Performance_Questionnaire.pdf PDF
N4523A18R1313.pdf PDF
A5_Bridge_Crane_Specification_with_Attachments.pdf PDF
PSNSIMF_Bridge_Crane_Specification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Generated 17 May, 2018

Bridge Crane

Question and Answer (Q&A) Sheet

The Government will be posting all questions and answers from Solicitation N4523A18R1313 on a series of Q&A documents. The Q&A documents will be posted to the government point of entry weekly throughout the length of the solicitation period. Please be aware that any questions asked and responses to those questions will be posted to the Q&A documents, the government requests that all questions be of non-proprietary nature and allow for public dissemination.

Solicitation Due Date:

The Government would like to extend the bid proposal submission from 22 May 2018 to 1 June

2018. This is to accommodate adequate time for the Government to field the questions from the 5-15-2018 site visit, post those questions to FBO.gov, and for the contractor to adequately bid the rail survey work based on a potential technical change to the contract specification through a solicitation amendment.

- Section 1.6.3 Existing Runway Rail Survey and Alignment.

The expectation is that the rail work identified in Section 1.6.3 will be modified, possibly reducing the requirement to align the rails from the building columns 84-91, approximately

100' of the north rail. It is anticipated the contractor will still complete the entire rail survey and provide a report on their findings. The Government will provide any changes to the technical specifications through a solicitation amendment.