REQUEST FOR CLARIFICATION
Attachment J-3
DATE OF REQUEST: QUESTION NO: 004
REQUIREMENT: YD-248 Floating Crane
REQUISITION NO.: N4523A18R1052
ITEM NO: 3.11.1
TITLE: Bilge Preservation
PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
PARA. NO: 3.11.1 PAGE NO: 63 and 64 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Specification 3.11.1 provides Contractor to remove existing and install new 100 percent of preservation from the baseline to 6 inches above the deck. At ship check, Contractor found that insulation on the bulkheads is present in areas at the deck plates.
Contractor requests clarification. Is it the intent of the specification to remove insulation and paint behind the insulation to the 6-inch marker above the deck plates, or is it the intent for paint renewal from the deck plates up to the bottom of existing insulation? If the intent is to remove insulation for painting, is it the intent that insulation be renewed?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: N DWG/REF CHG. N RQMTS CHG: N MAT'L CHG: N
TECHNICAL REVIEW: CARNEY SERIAL NO: 1052RFC004
Please See Attachment J-1 Statement Of Work (SOW) 23JUL18 Errata One.
ALL RFCs MUST BE RECEIVED NO LATER THAN 2:00 P.M. (PST), 25 July 2018.