vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||
| Project = | YD-248 | DATE: = | |||
| PRIME | SUBCONTRACTOR | PRIME | |||
| Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A | PRIME |
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F) Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meeting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availabilty Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | Condition Found Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental & Hazardous Waste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.19 | Weight Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Logistics Product Data | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.23 | General Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1 | Docking/Undocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib & Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting & Alignment of Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Undock Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Identify Distinguishing Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders Clean | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Rubber Fenders Replace | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull Blast and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull & Freeboard Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.7 | Hull & Freeboard UT | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.8 | Skeg Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Tanks Open, Pump, Vent, Clean, Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Tank Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Tank Identify Color & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Tank Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Tank Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Tank Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Tank Pre Closeout Inspeciton | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Tank Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.9 | On Load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Main Deck Non-Skid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Main Deck Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Main Deck UT | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1 | Superstructure Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.2 | Superstructure Non-Skid Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.3 | Superstructure Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.1 | Main Diesel Engine Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.2 | Main Diesel Engine Exhuast Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.3 | Aux Diesel Engine Exhaust Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.1 | Wire Rope Maintenance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.2 | Wire Rope Inpsections | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.3 | Wire Rope Hook Inspections | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.4 | Boom Hoist Motor Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.5 | Wire Rope Sheave Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.6 | Equalizer Bar Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.7 | Main Hoist Limit Switch OP Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.8 | Boom Hoist Limit Switch OP Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.9 | Aux Hoist Limit Switch OP Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.10 | Whip Hoist Limit Switch OP Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.11 | Spud Lock OP Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.12 | Deadman Switch Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.13 | Main Hoist Load Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.14 | Boom Hoist Load Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.15 | Aux Hoist Load Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.16 | Whip Hoist Load Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.1 | Bilge Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.12.2 | Dock Trial Baseline Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.12.3 | Dock Trial Final Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Scope (SOW/PWS) Labor Rate/MH: G&A Rate: Profit Rate:
Non RT Total Bid: $0.00
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F) Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
| Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) | 3.2.9 | Hull Repairs Repairs Reservation Tasking | 600 | $3,942.00 | $3,942.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $3,942.00 |
| 3.4.10 | Tank Repairs (Reservation Tasking) | 400 | $758.00 | $758.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $758.00 | |
| 3.5.4 | Main Deck Repairs (Reservation Tasking) | 600 | $1,369.00 | $1,369.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,369.00 | |
| Column Totals | 1600 | $6,069.00 | $6,069.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $6,069.00 |
Reservation Tasking (RT) Total Bid: $6,069.00
Total Bid: $6,069.00
********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.